Decision Making Process for Alternative Selection of Proper Design Change in Construction Project (적정 설계변경안 선정을 위한 의시결정 지원 프로세스)

  • Lee, Jong-Sik;Chun, Jae-Youl
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.2
    • /
    • pp.74-82
    • /
    • 2010
  • A government agency has been announced to increase 23,663 hundred million wons by cost of design change which occurred in the pre-construction and construction phase. As design change is a phenomenon to occur by means of a characteristic of the building design that standardization is difficult, even if it is said that a perfect design is done in design phase, design change is prevented, and it is going to decrease, and there is a limit. Because there are some causes in all of the construction project, it is change order of client, relative system, unfit design and field condition, etc. In this study, we are suggested logic and basic model of the decision making support process model that it should selecting the optimal alternative through complex and quantitative analyzed: that is cost, performance and constructability as respect Owner or CMr is executing project under the CM delivery system construction project which it occurred design change.

Benchmarking of US General Contractor's Pre-construction Services for a CM at Risk Project to Improve Contractor's Competitiveness (책임형 CM사 경쟁력 확보 및 선진화를 위한 미국 건설사의 시공이전단계 서비스 벤치마킹 연구)

  • Lee, Chang-Jae;Lee, Sang-Hyo;Ahn, Yong-Han
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.21 no.3
    • /
    • pp.9-18
    • /
    • 2017
  • Construction Management at Risk (CMAR) is a project delivery method that enables CM companies to deliver projects at a Guaranteed Maximum Price (GMP). General contractors can apply CMAR from the initial design phase right through the construction phase to reduce risks and improve project performance. One of the major advantages CMAR offers is that it permits a general contractor to provide a comprehensive suite of preconstruction services, including estimating, a constructability review, value engineering, drawings and a specification review, green building, and Building Information Modeling(BIM), among others. However, general contractors in South Korea currently provide only limited preconstruction services using CMAR because few CMAR projects have yet been implemented in Korea and their experience using the method is therefore limited. This benchmark study of how foreign general contractors utilize CMAR in their projects, particularly during the preconstruction process, its purpose, and the roles and responsibilities of each of the different participants in successful implementations thus provides invaluable information and will serve as a useful guide for Korean contractors seeking to incorporate CMAR preconstruction services in their projects and thus improve the competitiveness of their construction businesses.

A Process Model for Project Management of Design-Build System and Method for Constitution of Database (건축 프로젝트의 설계시공일괄 수행방식 관리를 위한 프로세스 모델 개발 및 데이터 베이스 구축 방안)

  • Kim Eui-Suk;Kim Chang-Gyo;Lee Kyung-Kook;Park Sang-Jun;Son Bo-Sik;Chun Jae-Youl
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.242-245
    • /
    • 2004
  • Recently, the design-build delivery system is being generalized in domestic construction project. The design-build system is becoming an increasingly preferable alterative to design-bid-build delivering method. In design-build project, however, a large construction company and design firm make up consortium as a design-build contractor rather than single company performs design and construction work. In this case, usually the construction companies take a leading role but due to their lack of managerial know-how in the design-build system, they could miss the merits of this approach. Therefore, it is necessary to investigated throughly the function and information flows all over the design-build project. In this research suggests a process model and database in the whole phase of design-build project. This process model and database system will also support to Improve the consistency of functional process and minimize incoherent activities in each phase of design-build project.

  • PDF

The Process Model for Project Management of Design-Build System and Constitution of Database (설계시공일괄 방식의 건축 프로젝트 관리를 위한 프로세스 모델 및 데이터베이스 구축)

  • Chun Jae-youl
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.1 s.23
    • /
    • pp.109-116
    • /
    • 2005
  • Recently, the design-build delivery system is being generalized in domestic construction project. The design-build system is becoming an increasingly preferable alternative to design-bid-build delivering method. In design-build project, however, a large construction company and design firm make up consortium as a design-build contractor rather din single company performs design and construction work. In this case, usually the construction companies take a leading role but due to their lack of managerial t31ow-how in the design-build system, they could miss the merits of this approach. Therefore, it is necessary to investigate throughly the function and information flows all over the design-build project. This research suggests a process model and database in the whole phase of design-build project. This process model and database system will also support to improve the consistency of functional process and minimize incoherent activities of the design-build projects.

Estimation Method of Waste Amount from Materials to Develop Generation Rates of Construction Waste in New Apartment Construction Sites: Focused on Bill of Quantities for Architectural Works (신축아파트 현장의 건설폐기물 발생원단위 개발을 위한 자재별 폐기물 수량 예측 방법: 건축공사 내역서의 투입 물량을 중심으로)

  • Jung, Jong-Suk;Song, Sang-Hoon;Park, Seong-Sik;Lee, Seok-Je
    • Land and Housing Review
    • /
    • v.5 no.1
    • /
    • pp.41-51
    • /
    • 2014
  • The amount of new apartment construction has been trending upward in 3~4% each year since 11% increase in 2002. Currently, in public apartment construction sites under separate delivery system for construction waste processing, the significant difference between estimated quantity for contract and actual amount frequently causes severe controversy among project participants. Many factors such as poor environmental management, inadequate contractual amount are assumed to influence the above problem, and the requirement to revise existing generation rates, the key criteria applied in estimating the quantities of waste, is increasing. Most of generation rates were established in early 2000's, and have difficulty in reflecting the changes from new materials and technologies accordingly. Therefore, this study aims to clarify the types of construction waste for each trade and the forecast method as preliminary work in order to develop more accurate generation rates for construction waste in new construction. To achieve this purpose, the architectural bills of quantities in ten apartment projects executed during 2010~2013 were collected, and the possible waste types and reasonable material loss ratio for each item from temporary works to owner-supplying material area were defined and compared through the workshops and interviews with the experts and on-site environmental managers. The results of this study will contribute to establishing the categories of construction waste for construction trades and proper generation rates by the indirect estimation method in new apartment construction in the follow-up study.

Improvement through Analysis of Current Open Book Policy for the Korean CM at Risk (국내 시공책임형 CM 오픈북 정책 현황 분석을 통한 개선방안)

  • Park, Kyungmo;Kim, Changduk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.2
    • /
    • pp.3-11
    • /
    • 2016
  • CM at Risk has been introduced in Korea to keep up with the global standards of construction management and provide a higher quality of cm service in line with a rapid change of the construction industry recently. However, it is widely considered that more time would required to settle down the system due to a lack of understanding towards CM at Risk, shortage of reliability and low capability to manage and undertake CM at Risk. Therefore, this research is analyzed problems of contract types, open book policies, and contract conditions of 33 numbers of projects undertaken by a bespoke domestic construction management firm in this research. Moreover, this research is suggested a method to establish an open book policy of CM at Risk aiming a better customers satisfaction through staff training, simplifying and improving a payment system, and a way to settle down an open book policy by improving a performance management system on site. It's expected that this research will contribute to a more competitive system with more dominating the market and a differentiation of the service so as clients to rely more on the CM at Risk.

The Basis research Developing Assessment tool for Construction Management through Check List of Critical Success Factor (CM의 핵심석공요인 체크리스트 개발을 통한 CM적용효과 평가기법 개발 기초연구)

  • Lee Tai Sik;Choi Jae-Ho;Kim Young-Hyun;Park Jang-Hee
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.337-340
    • /
    • 2003
  • Currently the number of project ordered as Construction Management is increasing. In advanced country, critical success factor of construction industry and case study is used for increasing productivity of construction project. This study presents the check list of critical success factor and analyzescase study of Construction management project in order to apply Construction Management Project in domestic industry.

  • PDF

A Management Performance Measurement Model of the Construction Engineering Firm -Focused on 'H' Construction Engineering Firm- (건설엔지니어링 기업의 경영성과측정모형 -H사의 사례를 중심으로-)

  • Park Chan-Sik;Kim Hyun-Jun;Jeon Yong-Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.2 s.18
    • /
    • pp.202-210
    • /
    • 2004
  • Under the current competitive business environment, the complexity of procurement method, and the lack of engineering capacity in the construction engineering industry, a construction engineering firms require the business strategy and its performance measurement system. This study suggests a performance measurement model that could follow 'H' construction engineering firm's vision and strategy. The model utilizes the concept of Balanced Scorecard. The study proposes the four main performance perspectives such as financial, growth, internal efficiency, and improvement & learning through the long-term strategy analysis, SWOT analysis, and interviews of the employees. Also the study develops the critical success factor and the key performance indicators. The usefulness of the performance measurement model is validated through the gap analysis such as alignment analysis and consensus analysis.

A Study of the Influencing Factors for Decision Making on Construction Contract Types : Focused on DoD Construction Acquisitions with Firm Fixed Price and Cost Reimbursable in FAR (건설공사 대가지급방식의 의사결정 영향요인에 관한 연구 - 미국 연방조달규정에 따른 미국 국방성의 정액계약과 실비정산계약을 중심으로 -)

  • Son, Young-Hoon;Kim, Kyung-Rai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.25 no.2
    • /
    • pp.23-35
    • /
    • 2024
  • This study analyzed the correlation between each of the 12 influencing factors in FAR 16.04 and the decision-making process for construction contract types, using data from a total of 2,406 DoD Construction Acquisitions spanning from 2008 to 2022. The study considered 12 independent variables, grouped into 4 Characteristics with 3 factors each. Meanwhile, all other contract types were categorized into two types: Firm-Fixed-Price (FFP) and Cost-Reimbursement Contract (CRC), which served as the dependent variables. The findings revealed that FFP contracts significantly dominated in terms of acquisition volume. In line with prevailing beliefs, logistic data analysis and Analytical Hierarchy Process (AHP) analysis of Relative Weights from Experts' Survey demonstrated that independent variables like Uncertainty of the Scope of Work and Complexity found out to be increasing the likelihood of selecting CRC. The number of contractors in the market does indeed influence the possibilities of contract decision-making between CRC and FFP. Meanwhile, the p-values of the top 3 influencing factors on CRC from the AHP analysis-namely, Appropriateness of CAS, Project Urgency, and Cost Analysis-exceeded 0.05 in the binominal regression results, rendering it inconclusive whether they significantly influenced the construction contract type decision, particularly with respect to payment methods. This outcome partly results from the fact that a majority of respondents possessed specific experiences related to the USFK relocation project. Furthermore, influencing factors in construction projects behave differently than common beliefs suggest. As a result, it is imperative to consider the 12 influencing factors categorized into 4 Characteristics areas before establishing acquisition strategies for targeted construction projects.

Improvement of Technical Proposal Tendering Evaluation Criteria for Small and Medium sized Construction Projects (중·소형 건설공사를 위한 기술제안입찰 평가기준 개선)

  • Yu, Jun-Hyeok;Hyun, Chang-Taek;Moon, Hyun-Seok;Son, Myung-Jin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.1
    • /
    • pp.95-105
    • /
    • 2012
  • The government introduced the technical proposal drafting system in September 2007, as a new method to stimulate technical competence among construction companies to require ingenuity, creativity, artistic sense, and high-level technology. However, an examination of instances has shown that this system has been applied only to large scale constructions worth 30 billion won or more, and not to small and medium constructions worth less than 30 billion won. This is because the evaluation criteria of the system is structured in a manner that makes it difficult to apply to small and medium constructions. This study presented methods to improve the evaluation factors, categories, and scoring scheme of the technical proposal creation system for medium to small scale constructions to be able to further apply the current system to small and medium constructions. The technical proposal evaluation criteria presented in this study was significant in that it enabled the technical proposal creation system that was mainly used for large scale constructions to be further applied to medium to small scale constructions. And it also contributes to the establishment and settlement of a new technical proposal tendering for medium to small scale constructions.