Investigation of Disputes for Nominated Sub-contractor(NSC) -Focused on the Judicial Precedent of NSC issues in Singapore, Malaysia and Hong Kong- (아시아 건설 시장에서의 지정하도급자(NSC)문제에 관한 연구 - 싱가포르, 말레이시아 그리고 홍콩의 판례를 중심으로 -)

  • Cho, Jaeyong;Kim, Junggon;Park, Hyeonggeun;Kim, Youngsuk;Lee, Boknam
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.6
    • /
    • pp.112-123
    • /
    • 2015
  • Many disputes are happened with various causes in overseas construction projects. One of major disputes is closely related with nominated subcontractors (NSC). This paper investigates 30 judical precedents for Singapore, Malaysia and Hongkong to analyze the detailed disputes related with the NSC, and then the judical precedents are classified into 6 categories: Delay and Defect Trouble (T1), Contract Relation (T2), Payment Trouble (T3), Set-off (T4), Liquidation (T5) and so forth (T6). According to the analytical results, the frequency of occurrence of disputes is considerably related with social and economical changes, and the dispute between NSC and employer for residential and commercial building projects is the most frequently happened case. As the results of analysis, therefore, it is concluded that the employer needs to response aggressively to the problems related with NSC, and it is also important to make the council for communication among related bodies. Furthermore, the institutional reform that make the role and the responsibility of employer consistent under considering contract terms and conditions is considered as the most important and fundamental issue.

Deriving Key Risk Sub-Clauses of FIDIC Conditions of Standard Subcontract -Based on FIDIC Conditions of Subcontract for Construction, edition 2011- (FIDIC 표준하도급 계약조건 핵심 리스크 세부조항 도출)

  • Hong, Seong Yeoll;Jei, Jae Yong;Seo, Sung Chul;Park, Hyung Keun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.42 no.3
    • /
    • pp.439-448
    • /
    • 2022
  • Recently, domestic small and medium-sized subcontractors participating in the overseas construction market are suffering from the continuous loss and damage due to the insufficient recognition of the importance of risk Sub-Clauses among conditions of subcontracts. Therefore, the need to derive risk Sub-Clauses for conditions of the subcontract has been raised, but until now, previous studies have been conducted focusing on deriving risk Sub-Clauses for standard conditions of contract for construction between the Employer and the Contractor. In this study, 52 risk Sub-Clauses were derived on the basis of the influence size of the Sub-Clauses through the Delphi technique targeting 94 Sub-Clauses of conditions of standard subcontract for construction edition 2011, issued by the International Federation of Consulting Engineers (FIDIC) and In addition, 33 key risk Sub-Clauses were finally derived through the PI Risk Matrix by Probability and Impact. The results of this study provide will useful information on key risk Sub-Clauses that need to be reviewed in advance to minimize contractual risks at the stage of bidding and signing contracts for overseas subcontract construction projects.

Evaluation on the Possibility of Connection Between IFC and Digital Quantity DataBase Exchange Standard (IFC와 디지털 수량산출정보 교환표준의 연계 가능성 평가)

  • Won, Ji-Sun;Moon, Jin-Seok;Choi, Won-Sik
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.14 no.12
    • /
    • pp.6488-6494
    • /
    • 2013
  • Recently, BIM has attracted attention as a technology to improve the construction productivity. The BIM standards to be applied to the BIM project are necessary for using or connecting the current 2D-based drawing standards. To develop the standard for BIM-based QTO and cost, this paper focused on using QDBEx, which was applied to road project cost management and connecting QDBEx with IFC, which is the BIM data delivery format. The IFC schema was evaluated to determine if it is possible to use the converts to the QDBEx XML file. As a result, 66% of the whole was available to connect directly, and 17% was available to connect through the processing of instance. The remaining 17% was evaluated to determine if it was available to connect. In the future, improvements in the schema will be suggested based on these results.

Development and Application of a BIM Library Placement Automation Model (BIM 라이브러리 자동 배치 모형 개발 및 사례 검증)

  • Hyeon-Seung Kim;Hyoun-Seok Moon;Leen-Seok Kang
    • Land and Housing Review
    • /
    • v.15 no.1
    • /
    • pp.157-165
    • /
    • 2024
  • As major public owner agencies in Korea have improved the application level of BIM, many design and construction companies are paying more attention to ways to improve actual work productivity in the BIM execution process. In this study, we introduce a method to automate the placement of BIM libraries, a recurring task in the BIM-based design process that serves as a prime example of BIM design automation methodologies. In particular, we classify the target surfaces for placement of BIM libraries into straight lines, curves, vertical planes, and surfaces. For each target surface, we implement a BIM library automatic placement model in Dynamo, considering the spacing and alignment according to the distance between the centers of two objects and the linear length. The results of case studies confirm that the proposed method can be employed according to various placement environments and conditions with the working time shortened. The study proposes that various objects and structures that need to be placed according to the terrain characteristics can be placed accurately, and work productivity can be significantly improved through the automation of placement.

Survey and Analysis of Stakeholder Opinions on the Establishment Procedure of Safety Inspection System for Highway Construction Clients (고속도로 건설공사 발주자의 안전점검 체계구축 절차에 관한 이해관계자 설문조사 및 분석)

  • Eung Ho Park;Su Dong Lee;Kihyo Jung
    • Journal of the Korea Safety Management & Science
    • /
    • v.25 no.4
    • /
    • pp.57-65
    • /
    • 2023
  • The public safety management guidelines were introduced in 2019 and continue to be dedicated to advancing comprehensive measures for public safety management, with a primary focus on prioritizing the safety and well-being of the public within governmental institutions. To achieve this goal, our previous study developed a establishment procedure of risk assessment-based safety inspection system for public institutions that order construction projects and applied it to highway construction projects to evaluate its effectiveness. To enhance the practicality of the establishment procedure, it is essential to collect and analyze feedback from stakeholders regarding its performance and suitability. This study conducted a survey involving 200 participants who had experience with the establishment procedure, and performed statistical analyses to evaluate its performance and applicability. The survey results indicated that the participants reported a high level of satisfaction (scoring 4 and above on a 5-point Likert scale) in several areas: specialization of safety inspection items for different types of work (with a satisfaction rate of 65%), the evaluation process for safety ratings (64.5%), and their willingness to recommend the procedure to other institutions (75.5%). In the factor analysis with Varimax rotation, two factors emerged: (1) a specialization factor related to safety inspection items, and (2) a grading factor associated with safety evaluation results. Regression analyses of these factors unveiled significant positive relationships with improvements in safety and health performance, including the prevention of fatal accidents, heightened safety responsibility, and raised safety inspection standards. The establishment procedure of safety inspection system developed in our previous study can play a crucial role in reducing accidents resulting in fatalities and injuries at construction sites, ultimately contributing to a safer working environment for all involved parties.

Business Process Model for Progress Phase of Design-Build Project (설계시공일괄방식 사업의 진행단계별 업무프로세스 모델)

  • Song, Young-Woong;Son, Bo-Sik;Chun, Jae-Youl;Choi, Yoon-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.4
    • /
    • pp.38-49
    • /
    • 2009
  • In public project market, design-build projects have been increased because of market trend change which enables technical competition. In this condition, its importance is also getting important. Generally, life cycle of design-build project consists of planning, preliminary design, procurement, contract, detail design, start of construction, construction, end of construction, and evaluation. From contractor's viewpoint, it has problems such as difficulties in project management and information sharing because of frequent change of charged division. To solve these problems, it is desirable to change from function-based management system to process-based management system. The purpose of this study is to develop management process model for design-build project by progress phases. This study analyzed main conflicts and decision making factors of each stage in design-build projects, then systemized management subjects' responsibilities and management points' change. And also this study defined the key information that is the key point by project characteristics and progress phases. Based on this analysis, this study did business process modeling from planning stage to construction design check stage. At last, we proposed the way to manage business process by design-build project progress.

A Study on the Problem and Improvement of Screening System of Low Price Subcontracting by Analyzing a Standard of Judgement Criteria (원도급자 측면에서의 저가하도급 판정기준의 문제점과 개선방안)

  • Kim, Soon-Young;Han, Choong-Hee;Baek, Tae-Ryong;Kim, Kyoon-Tai;Lee, Jun-Bok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.6
    • /
    • pp.107-116
    • /
    • 2009
  • As the Fundamentals of Construction Business Act was revised in December 2004 and its implementing ordinances and enforcement regulations were adjusted in June 2005, the screening system of low price subcontracting has been an obligation to the public owners, having brought about arguments for and against since it enacted in 1983. The statutes for low price subcontracting have been reinforced from this year; for example, it underlines to submit to a project and builds an information network of subcontracting works. The system's original intention was that prevents shoddy and fraudulent constructions caused by low price subcontracting and precludes disturbances of fair trade by screening that whether it satisfies the conditions or not in advance. But, the criterion for the existing low price subcontracting has several issues having held up a true mirror to the real situation. It is arguable to discharge an important task with the primary purpose. This dissertation have researched the problem with a deposit of subcontract and the low price subcontracting basic rate are being used by the criteria for deciding whether it is a low price subcontracting or not, so showing the plan of reformation based on the findings, it wishes to contribute toward making the most of the system's essential intent.

Development of Rule-Set Definition for Architectural Design Code Checking based on BIM - for Act on the Promotion and Guarantee of Access for the Disabled, the Aged, and Pregnant Women to Facilities and Information - (BIM 기반의 건축법규검토를 위한 룰셋 정의서 개발 - 장애인,노인,임산부 등의 편의증진 보장에 관한 법률 대상으로 -)

  • Kim, Yuri;Lee, Sang-Hya;Park, Sang-Hyuk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.6
    • /
    • pp.143-152
    • /
    • 2012
  • As the Public Procurement Service announced the compulsory of BIM adaption in every public construction from 2016, the importance of BIM is increasing. Besides, automatic code checking takes significance in terms of the quality control for BIM based design. In this study, rule-sets were defined for Act on the Promotion and Guarantee of Access for the Disabled, the Aged, and Pregnant Women to Facilities and Information. Three analytic steps were suggested to shortlist the objective clauses from the entire code; the frequency analysis using project reviews for architectural code compliance, the clause analysis on quantifiability, and the analysis for model checking possibilities. The shortlisted clauses were transformed into the machine readable rule-set definition. A case study was conducted to verify the adaptiveness and consistency of rule-set definitions. In future study, it is required the methodologies of selecting objective clauses to be specified and its indicators to be quantified. Also case studies should be performed to determine the pre-conditions in modeling and to check interoperability issues and other possible errors in models.