A Basic Study for Developing the Construction Cost Index by Directly Surveying the Cost Input Structure in Korea - Focused on Highway Construction Projects - (원가투입구조의 직접 조사에 의한 국내 건설공사비지수 개발을 위한 기초연구 - 도로시설물 중심으로 -)

  • Kim, Woo-Young;Yi, June-Seong;Lee, Young-Hwan;Lee, Bok-Nam;Kim, Yoon-Joo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.2 s.30
    • /
    • pp.53-61
    • /
    • 2006
  • Korean Government started to publish Korean CCI(Construction Cost Index) again at February 2004 since CAK(Construction Association of Korea) stopped publishing it 1994. CCI is developed using the verified statistical data, that is, input-output table and producer price index by Korean Bank and labor unit cost by CAK. Though the method is available as it uses the verified statistical data, there is a limitation to reflect the characteristics of construction. For overcoming this limitation, this study suggests CCI development method investigating the input structure of labor and material cost for each type of construction project and applying the cost variations of the items.

Cost index for residential buildings (공동주택 건설공사비지수)

  • Lee, Dong-Hyun;Koh, Young-Beom;Ruy, Jung-Ho;Kim, Chang-Duk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.289-294
    • /
    • 2006
  • Residential buildings industry hold lots of portions in Korean construction. Accurate cost index for Residential buildings is required to understand trends of prices of the constructions and to manage budget for them effectively. So Korea Institute of Construction Technology has issued a cost index for residential buildings every six months. However It hasn't been improved although It can't reflect the actual circumstance. So we are supposed to make a new cost index for residential buildings based on statistical data extracted from bills of quantity at three different projects.

  • PDF

Improvement of contract sum adjustment method caused by price fluctuation using construction cost index (건설공사비지수를 활용한 물가변동에 의한 계약금액 조정방안 개선)

  • Cho Hun-Hee;Doe Geun-Young
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.1 s.23
    • /
    • pp.162-168
    • /
    • 2005
  • Index adjusted ratio method has been widely utilized in public construction sector for contract sum adjustment by price fluctuation. In this method, the Production Price Index are used for the base ratio, but the PPI can't reflect the character of construction project in respect of the selected items and weight. In this research we prove the problem of using the index adjusted ration method in contact sum adjustment by price fluctuation, and improve it by using the construction cost index, which has the property of construction project. And we figure out the efficiency of the proposed method by case study.

Development of a Cost Index for Site Developing Project (단지조성공사용 공사비 지수의 개발)

  • Bae Keon;Lee Tai-Sik;Park Jong-Hyun;Lee Won-Yong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.423-426
    • /
    • 2002
  • The foundation for developing a cost estimation system based on historical data has been being prepared in Korea. Historical data is a priori of developing a cost estimation model. Cost Index, one of the historical data, is used to estimate construction cost and to adjust the amount of contract money in the foreign country, whereas it is not used in domestic except for the road construction project in Korea. Construction cost indices can be used by an estimator in tender analysis, pricing, price adjustment, cost planning, and forecasting. In this regards, this paper identified the problems in developing Cost Index evaluation process by comparing the standard of framing Cost Index used in British to the one used in Korea. Then, the scheme for improving a Cost Index required for Site Developing Construction was proposed. Twenty-two cases of engineering estimate data were used to compare the domestic standard to the foreign one in deriving a Cost Index.

  • PDF

Improvement of Construction Cost Index against the Change of National Basic Statistic (국가 기초 통계자료 환경변화에 따른 건설공사비지수 개선)

  • Kang, Taikyung;Baek, Seung-Ho;Kim, Chang-Won;Cho, Hunhee
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.4
    • /
    • pp.21-29
    • /
    • 2015
  • Construction cost index (CCI) has been published for last 10 years, it's contributed to update the historical cost data, analysis cost fluctuation and evaluate the market price for construction works with direct or indirect manner. CCI is a secondary or processed statistics using the basic statistics of input output table (IO table) and producer price index (PPI) from the Bank of Korea (BOK). So once the basic statistics change, it is required to modify the calculating model of CCI. Recently the BOK changed some fundamental principles and the base year (from 2005 to 2010), that can be used in IO table and PPI. This research analyzed the recent revision of basic statistics and their impacts on CCI, and improved the previous CCI model in response to it. Also the validity of new CCI was verified by analyzing the items and weights utilized in CCI and comparing the related index.

Development of Quantity based Base Period Price Index(QBPPI) to calculate Construction Cost Index (건설공사비지수의 산정을 위한 수량기반 기준시점 가격지수의 개발)

  • Park, Sung-Chul;Koo, Kyo-Jin;Hyun, Chang-Taek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.5
    • /
    • pp.77-84
    • /
    • 2006
  • Indexes have played an important role as a economic indicator or performance indicator in many industries for a long time. In construction industry, indexes, or Construction Cost Index(CCI), have been used to compensate for the gap of time in Estimate Using the Historical Cost Data from Feb. 2004. CCI is composed of index formula and resources. Existing literatures had used Laspyeres Index as a index formula. And, Leontief table, the bills of quantities, and information of price surveyor were used as a resource. When applying Laspyeres formula and the resources to calculating the CCI, the problems such as double application of price fluctuation, calculating the incorrect weights, may be generated. This paper analyzed the existing economic relevant indexes as well as Laspyeres formula. Thus, feasibility of them was analyzed using three practical cases of apartments. And then, Quantity based Base Period Price Index(QBPPI) was developed to consider the characteristics of construction more accurately.

정보통신공사비지수 개발에 관한 연구

  • Kim, Tae-Gyun;Jo, Hun-Hui;An, Cheol-Mo;Gwak, Jeong-Ho;Seo, Sun-Seok;Kim, Yeong-Sam;Kim, Seo-Gyeong;Kim, Jin-Ho
    • Information and Communications Magazine
    • /
    • v.29 no.7
    • /
    • pp.89-96
    • /
    • 2012
  • 정보통신공사의 공사비 산정은 그동안 원가계산 방식으로 이루어져 왔으나, 최근 들어 건설 및 전기분야에서와 같이 실적공사비를 활용할 수 있도록 제도 시행을 추진하고 있다. 그러나 실적공사비를 적용하기 위해서는 과거 공사비 실적자료를 현가화 할 수 있는 지수의 개발이 전제되어야 함에도, 그동안 정보통신공사는 한국건설기술연구원의 통신공사비지수(기타 특수건설의 최하위지수)나 한국은행의 생산지물가지수를 이용할 수밖에 없는 한계를 지니고 있었다. 이에 본 연구에서는 실적적산 데이터를 기반으로 정보통신공사의 특성을 고려한 정보통신공사비지수를 제시하고자 한다. 개발된 지수는 실적공사비 자료의 현가화 뿐 아니라, 물가변동에 따른 계약단가 조정(Escalation), 정보통신분야의 거시적인 동향을 파악할 수 있는 주요 지표로 정보통신공사의 사업비산정 및 관련 분야의 기초자료로 활용될 수 있다.

The Research on Development of Road Cost Index Using Each Representative Item of Expenditure (비목별 주요 항목을 활용한 도로 공사비지수 산정에 관한 연구)

  • Chun, Jin Yong;Woo, Sungkwon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.1D
    • /
    • pp.105-113
    • /
    • 2006
  • Construction cost index is generally used to estimate the new project cost based on past construction data and to adjust the contract cost when the price change of various articles and items of expenditure composing the contract occurs. In Korea, it is mostly used for modulation of construction contract cost due to fluctuation of prices. However the method for making cost index had some problems in calculating cost index of each expenditure item that could not properly reflect the change of construction cost. To supplement these problems, the research of developing construction cost index has been executed. Through the precedent research, these problems were partially resolved but still remain. Therefore this research proposes the method for making cost index that utilizes representative items of labor, material, equipment by analyzing bill of quantity of road construction, through analysis and comparison of precedent studies. By using this method, it is expected to solve the problems which were not reflected in preceeding studies.

Analysis of Road Construction Projects' Escalation under Historical Data-Based Estimate System in Jeju (실적공사비가 적용된 제주도 도로공사의 물가변동률 영향 분석)

  • Hong, Jeong-Ho;Lee, Dong Wook
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.34 no.2
    • /
    • pp.667-676
    • /
    • 2014
  • This study has conducted case studies in order to suggest alternatives to the historical data-based estimate system. Price fluctuation calculation methods based on historial cost indexes, standard estimate and construction cost indexes were applied to 9 road construction sites in Jeju for an analysis. As a result, in 5 construction sites (about 56% of 9 sites), the index control rate calculated based upon historical data-based estimate system was higher than that calculated based upon standard estimate and construction cost indexes. Thus the establishment of the requirements for the adjustment of contract price due to price fluctuation delays, which leads to a significant difference in price fluctuation amount. And, in an analysis of construction cost indexes, the indexes for road construction were used for calculating index control rate which ranges from 2.0 to 9.4 percent, indicating the time of construction amount and price fluctuation application has a significant influence on index control rate.

Development of Electrical Construction Cost Index Applied Chain-Weighted Method (연쇄방식 전기공사비지수 개발에 관한 연구)

  • Park, Houng-Hee;Choi, Seung-Dong;Hyun, So-Young;Park, Min-Young
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.5
    • /
    • pp.49-60
    • /
    • 2014
  • Electrical construction cost index has been applied fixed-weighted method. But fixed-weighted method can't faithfully reflect industrial structure changes. Because the weighted value and price index of fixed-weighted method is fixed on the basic period. Electrical construction cost index is composed of the cost of labor and material. So it fluctuates sharply whenever the construction association of korea announces the laborer's wage of electrical construction. And it depends on only the producer price index changes that is related to electrical construction since then. So a study is focused on developing electrical construction cost index applied chain-weighted method. Because chain-weighted method can reflect the realities of the electrical construction and alleviate the sudden changes of labor cost with link index. We verify that chain-weighted method relieves the step states of electrical construction cost index applied fixed-weighted method.