Development of Quantity based Base Period Price Index(QBPPI) to calculate Construction Cost Index

건설공사비지수의 산정을 위한 수량기반 기준시점 가격지수의 개발

  • Published : 2006.10.31

Abstract

Indexes have played an important role as a economic indicator or performance indicator in many industries for a long time. In construction industry, indexes, or Construction Cost Index(CCI), have been used to compensate for the gap of time in Estimate Using the Historical Cost Data from Feb. 2004. CCI is composed of index formula and resources. Existing literatures had used Laspyeres Index as a index formula. And, Leontief table, the bills of quantities, and information of price surveyor were used as a resource. When applying Laspyeres formula and the resources to calculating the CCI, the problems such as double application of price fluctuation, calculating the incorrect weights, may be generated. This paper analyzed the existing economic relevant indexes as well as Laspyeres formula. Thus, feasibility of them was analyzed using three practical cases of apartments. And then, Quantity based Base Period Price Index(QBPPI) was developed to consider the characteristics of construction more accurately.

지수는 여러 산업분야에서 오랜시간 동안 경제지표 또는 성과지표로서 중요한 역할을 담당해 왔으며, 실적공사비 적산방식이 적용 확대됨에 따라 2004년 2월부터 시간에 대한 보정을 위하여 건설공사비지수를 사용하고 있다. 건설공사비지수를 산출하기 위한 구성요소는 지수산정식과 자료원으로 구분된다. 기존의 건설관련 공사비지수에서는 물가지수산정에 사용하는 라스파이레스(Laspyeres)지수를 산정식으로 적용하고 산업연관표, 공사비 내역서를 사용하여 가중치를 산정하였다. 그러나, 기존의 방법은 물가변동이 중복 적용되고 대상프로젝트의 특성을 효과적으로 반영하지 못하는 문제점이 발생된다. 본 연구에서는 라스파이레스지수를 비롯한 기존 지수 산정식들을 분석하고, 공동주택공사의 사례를 통하여 기존 지수산정식 및 자료원의 적정성을 분석한 후, 건설공사의 특성을 효율적으로 반영하고 물가변동을 반영할 수 있는 새로운 지수를 제안한다.

Keywords

References

  1. 건설기술연구원 (2004). 실적공사비 교육자료 ., (2004. 05. 20)
  2. 김우영, 김윤주 (2005). 건설공사비지수 개발III. 연구보고서, 건설산업연구원. pp. 14-18
  3. 대한건설협회 (2005). '2005년 상반기 건설업 경영분석.' , (2005. 11. 20)
  4. 박성철 (2004). 하도급공사비 예측모델. 석사학위논문, 서울시립대학교. pp. 1-2
  5. 한국은행 (2002). '알기쉬운 경제지표해설 .' , (2005. 11. 07)
  6. 한국물가정보 (2006). , (2006. 03. 30)
  7. Bert M. Balk (1995). 'Axiomatic Price Index Theory : A Survey.' International Statistical Review/Revue Internationale de Statistique, 63(1), pp. 69-93 https://doi.org/10.2307/1403778
  8. California Department of Transportation (2006). 'Cost Index Summary.' (2006. 05. 30)
  9. Cheng, G (2003). 'Estimating Future Hihgway Construction Cost.' Journal of Construction Engineering and Management, ASCE, 129(3), pp. 272-279 https://doi.org/10.1061/(ASCE)0733-9364(2003)129:3(272)
  10. E. C. Rhodes (1993). 'A Quantity-Index.' Journal of the Royal Statistical Society, 96(2), pp. 314-318 https://doi.org/10.2307/2341795
  11. International Monetary Fund (2004). 'Basic Index Number Theory.' , (2006. 07. 22)
  12. Kam, Y. (2002). Use of the Edgeworth-Marshall Index in the System of National Accounts. Lakehead University. pp. 7-11
  13. Ken, S. (2004). 'Quick Facts about the Construction Industry.'
  14. Michael C. Fleming, Brian A. Tysoe (1991). Spon's Costruction Cost and Price Indices Handbook. E & FN SPON, London, Great Britain, pp. 5-20
  15. Ragnar Frisch (1936). 'Annual Survey of General Economics:The Problem of Index Number.' Econometrica, 4(1), pp. 1-38 https://doi.org/10.2307/1907119
  16. The World Bank (2006). 'ICP Chapter 12: aggregation methods.' , (2005. 12. 26)
  17. Tim, G (2005). 'First Quarterly Cost Report.' ENR, p. 38
  18. US Army Corps of Engineers (2003). 'Civil Works Construction Cost Index System (CWCCIS).' EM1110-2-1304