• Title/Summary/Keyword: 건설공사비관리

Search Result 654, Processing Time 0.027 seconds

An Design of Analyzing Process by Construction Extension of Time (공기연장 분쟁의 공사기간 분석 프로세스 설계에 관한 연구)

  • Kim, Beop-su;Seong, Gi-gang;Bae, In-ho;Bang, Hong-soon;Choi, Hyeong-jin;Kim, Ok-kyue
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.4
    • /
    • pp.104-113
    • /
    • 2019
  • Construction dispute about Extension of Time are complexly intertwined with various issues. The duration delay analysis defines the impact the issue has on the duration variation. And The international court and the arbitrator use the results of the analysis as a basis for reasonable duration judging. However, most of the domestic Construction sites have not established a business process for Extension of Time litigation. Therefore, Analysis data are collected after the occurrence of the dispute, there is not enough basic data of analysis almost. This study sought to improve the management efficiency by organizing information requirement for delay analysis and suggesting a reasonable business process. As a result of applying the proposed process to actual construction duration extension disputes, about 33% of practitioners, 46% of contractors, and 48% of legal advisors were satisfied with the process application site And Matrix validation was 91% identical. This study suggests that it is possible to increase the efficiency of the construction duration analysis work used as a basis in the construction dispute. Finally, the Computer based system design for this process should continue in the future.

Performance Evaluation Model for Public-Private Partnership Projects - with Reference to BTO (Build-Transfer-Operate) Road Projects - (민간투자사업 성과평가 모델 개발 및 적용 - 도로 부문 사업을 중심으로 -)

  • Park, Hyeon;Park, Inseok;Lee, Shin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.2
    • /
    • pp.83-95
    • /
    • 2018
  • The aim of this paper is to develop a performance evaluation model for PPP (Public-Private Partnership) projects that appropriately reflects the important traits that are unique to PPP projects. To this end, 1) it defines a set of distinct perspectives involved in the PPP projects and their associated success factors that might differ amongst the perspectives; 2) it identifies the key performance indicators and suggests the performance evaluation criteria for each indicator; and 3) it builds a performance evaluation model by matching the success factors from each perspective with performance measure criteria as well as applies the model to the two selected BTO road projects in Korea. The process of model construction and its application confirms significant differences between the main stakeholder perspectives typically involved in PPP projects, which highlights the need for an evaluation model tailored for PPP projects by taking into account the distinct perspectives. The results from the PPP evaluation model developed in the study is compared against the results from the existing ex-post evaluation model for construction projects in general. The former shows a closer match with the results from the user satisfaction survey conducted. This new evaluation framework and the performance indicators entailed in it permits a balanced evaluation of PPP projects as it takes into account different perspectives involved in PPP projects as well as an understanding of the factors affecting the success of PPP projects. While the construction of the model is based on transport projects, it is applicable to different types of PPP projects through variation with the weight allocation amongst different success factors and/or additions or other adjustments to the performance evaluation criteria as required.

An Uncertainty Analysis of Calculating Life Cycle Maintenance and Energy Costs for Technical Proposals (기술제안입찰을 위한 유지관리 및 에너지 비용 산출방식의 불확실성 분석)

  • Chung, Sung Young;Kim, Sean Hay
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.5
    • /
    • pp.3-9
    • /
    • 2018
  • Although Life Cycle Cost (LCC) must be evaluated by experts, sometimes it may not allow a sufficient time for even the experienced LCC expert to make rational decisions. Therefore, it often ends with relatively comparing the final numbers. We have broken down 110 technical proposals that are actually bade and accepted for large construction projects, and then have analyzed the uncertainty of Maintenance and Energy (M&E) cost during building life cycle, which turns out be the most volatile factor in uncertainty of LCC. Also we suggest "Value Engineering Index (VEI)" - the reduced M&E cost that is normalized by the reduced first cost. It is analyzed that the most uncertain factors of the M&E cost include repair and replacement term differing from each project, duplicated repair and replacement, non-standard repair items, and site-specific energy cost. Eventually we propose a VEI population with a mean of 1.38 and a standard deviation of 1.19, which is obtained by individually and exclusively applying the uncertain factors of the M&E cost to the 35 standard sample of technical proposals. The LCC evaluators may be able to use the VEI population as the benchmark to select the technical proposal with the most reasonable LCC among many others in two suggested manners; the one is to deterministically calculate the probability of single VEIs, and the other is to stochastically calculate the probability of the VEIs where uncertainty is quantified.

Consideration on the Operation of water level management and Environmental Change Associated with Inner Dike Constructions in Saemangeum Reservoir (새만금호 방수제 공사에 따른 관리수위 운영과 환경변화에 관한 고찰)

  • Choi, Jung-Hoon;Oh, Chan-Sung;Cho, Young-Kweon;Ahn, Chi-Ho
    • Journal of the Korean Society for Marine Environment & Energy
    • /
    • v.16 no.4
    • /
    • pp.290-298
    • /
    • 2013
  • A Saemangeum Development Project, which is a national project in South Korea, has started with the objective of developing the reclaimed area mainly agricultural land use since the mid'80s. To develop a model of the global eco-reclamation, constructions of the eco-friendly counter facilities such as sluice gates and inner dikes, as well as environmental preservation measures for an estuary reservoir, have been carried out. However, reasonable measures of the water quality management for the Saemangeum area are required. Thus, the purpose of this study is to rigorously analyze and quantitatively evaluate the environmental problems due to the water level management associated with inner dike constructions. To achieve these objectives, the affecting factors on determination of water level management are described and a series of calibrated transient-state numerical simulations was performed to demonstrate the salinity distribution difference in the estuary before and after the construction of inner dikes. The overall salinity reduced about 2~5 psu, and the seawater intrusion was weakened by a well-regulated waterway after construction of the inner dikes compared to before construction of them.

Economic Analysis for Warehouse Rental Using Underground Parking Lots Extra Storage Room of Rental Office (임대오피스 지하주차장 여유공간을 활용한 임대창고의 경제성 분석)

  • Lee, Hwan-Cheol;Song, Byung-Doo;Hong, Tae-Hoon;Hyun, Chang-Taek;Moon, Hyun-Seok
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.877-882
    • /
    • 2008
  • The column gap of underground parking lots of office considering a business background and effective parking divisions is planned. A parking plan by column gap of fixed forms in atypical underground parking lots makes much extra storage rooms. Most of the edge of the parking lots are used for fan room. Part of the edge are located at parking ramps. Also warehouses are located in extra storage rooms. In this study compare study economical efficiency between life cycle costs and leases earnings. Consequently, It is proved that the warehouse rental is efficient because of lease earning guaranted years.

  • PDF

A Web-based Decision Support System for Selecting Optimal Retaining Wall Systems (적정 흙막이 공법 선정을 위한 웹 기반 의사결정 지원 시스템)

  • Kim, Hye-Won;Choi, Myung-Seok;Lee, Ghang
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.694-697
    • /
    • 2008
  • A retaining wall system suitable for a construction project is selected on the basis of subsoil conditions. If the decision-maker selects an improper system, it has a negative effect on the cost and schedule of the construction project. There have been many studies related to the models and processes for selecting optimal retaining wall systems. However, engineers who are not familiar with formal analysis methods could not easily utilize the formal methods proposed by previous studies. In order to overcome this problem, we developed a web-based decision support system called Dr. Underground, which is both physically and technically easily accessible by engineers. Dr. Underground was developed based on a selection method developed from a precedent research project. It was developed using a server-side web language ASP.NET and MS Access as a database. Decision-makers can input data about the building's condition, construction site conditions and adjacent site conditions in this system. Based on the input data, Dr. Underground recommends an optimal retaining wall system for the inputted conditions and provides detail information on the system.

  • PDF

쓰레기 소각장의 환기설비 설계 사례

  • 심재곤
    • The Magazine of the Society of Air-Conditioning and Refrigerating Engineers of Korea
    • /
    • v.31 no.6
    • /
    • pp.35-39
    • /
    • 2002
  • 최근, 산업의 발달로 인하여 생활수준이 향상되어 대량생산과 대량소비현상이 발생하고 도시의 밀집도가 높아 단위 면적당 거주하는 인구가 증가되면서 거주지역에서 발생되는 부산물이 현저히 증가되어 환경측면에서 복합적인 환경문제에 직면해 있다. 최근까지 대책마련에 고심하고 있는 도시에서 발생된 다량의 쓰레기 처리문제는 경제적인 측면에서 몇 년 전 까지는 대부분을 매립에 의존해 왔으나, 매립 방식에 의존하였으나 지가 및 공사설비의 상승, 일부 비위생적으로 조성된 매립장에서 배출되는 침출수 및 악취 등의 환경오염이 심각한 사회문제로 대두되면서 매립장의 확보나 증설은 해당 지역주민의 반발로 지방자치단체의 골치 아픈 과제로 등장하였다. 이러한 문제점을 보완하기 위해, 최근에는 매립지 확보의 어려움과 환경보존을 위하여 쓰레기를 정적이고 위생적으로 처리하기 위하여, 소각시설이 표 1과 같이 증가하고 있으나 소각 때 발생하는 다이옥신 등 인체에 치명적인 오염을 유발시키기 때문에 소각로 건설에 대한 환경운동단체와 주민들의 반발이 거세게 제기되고 있는 현실이다. 이러한 영향에 의해 앞으로는 소각보다는 쓰레기 자체를 감량.재사용.재활용하는 처리방식이 표 1과 같이 증가되는 현실이다. 쓰레기를 소각하는 것은 제 2오염을 유발시키고, 소각장 건설비용과 유지관리에 많은 예산이 소요된다. 쓰레기소각장을 건설할 때, 인근주민이나 환경단체로부터 반대의견에 직면하게 되는데, 그 사유는 쓰레기 처리과정의 전 단계인 반입.공급 과정에서 악취발생과, 후단계인 소각설비에서 발생되는 배출가스 오염원을 완전히 제거하라는 것이다. 최근에는 소각장의 설계.시공과정에서 최대한 악취발생과 확산을 억제하는 시설에 투자를 하고 있으며, 또한 주민 편익 시설과 부대 복리 후생시설은 소각시설 주변지역 주민틀의 소각시설에 대한 부정적 이미지를 불식시키며, 외부 방문객이나 운영 관리 요원들에게 쾌적한 환경조성과 업무효율 및 근무환경의 개선에 일익을 담당하고 있다. 본 고는 환경 친화적인 쓰레기 소각장을 설계하는 측면에서 1998년도에 턴키방식으로 발주되었고 2001년 12월에 준공하여 운전하고 있는 경기도 구리시 자원회수시설의 환기설비에 적용된 설계 및 시공개념을 소개하고자 한다.

  • PDF

Schedule Computation Method of Two-way Multiple Overlapping Relationships on BDM Technique (BDM 기법에서 양방향 다중 중복관계 일정계산 방법)

  • Kim, Seon-Gyoo;Noh, Seong-Beom;Lee, Yong-Hyun;Yu, Young-Jeong;Kim, Jin-Bong;Koo, Jae-Oh
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.2
    • /
    • pp.120-127
    • /
    • 2012
  • Today, most construction projects have been higher, bigger, and more complicated gradually. So the domestic construction companies have been trying to understand overall construction process and relationships between activities, and adopted various management techniques and tools in order to perform a systematic and effective scheduling. However numerous problems have been occurred on the practical applications because most existing scheduling softwares adapt ADM and PDM techniques. One of them, PDM, is so uneffective because it represents the overlapping relationships between two consecutive activities only by the combinations of start and finish points between two activities. In order to supplement the demerit of PDM, Beeline Diagramming Method(BDM) is proposed as a new networking technique, it can represent two-way multiple overlapping relationships between two activities directly. However there are occurring a loop phenomenon on applying two-way multiple overlapping relationships. This research proposes and verifies the schedule computation method of two-way multiple overlapping relationships on the BDM network.

The Current Status and Facilitation Strategy of BIM for Civil Infrastructure Projects (토목공사의 BIM 현황 및 활성화에 관한 연구)

  • Park, Tae-Soon;Park, Hee-Sung
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.38 no.1
    • /
    • pp.133-140
    • /
    • 2018
  • The purpose of this paper is to provide baseline on the current status and the activation of BIM in civil engineering which can integrate and manage the information and tasks generated during the life cycle. Hierarchical analysis was conducted to identify the level of BIM application, recognition survey for practitioners, and activation plans. The survey results show similar trends in BIM activation inhibition factor, the need for BIM, the effect of BIM and the future possibility of BIM. The utilization of BIM and the technical training in the civil engineering field were lower than those in the architectural field. The analysis of AHP(Analytic Hierarchy Process) is performed to identify the degree of importance in financial, operational, investment, technical, and institutional sections as its activating factors. As a result, the technical factor points the highest degree. Thus, study shows the direction to apply BIM in civil engineering in the future by suggesting an efficient plan.

Efficiency Analysis of Tower Crane Lifting Work for Project Management of Construction (건축공사의 공정관리를 위한 타워크레인 양중 효율성 분석)

  • Bae, Jeong-Hyeon;Kim, Ki-Hyuk;Lee, Donghoon
    • Journal of the Korea Institute of Construction Safety
    • /
    • v.2 no.2
    • /
    • pp.63-69
    • /
    • 2019
  • Building Construction projects are getting higher and larger. Therefore, the use of Tower Crane, which is more productive than any other lifting plan shows a trend of continuous increases. However as equipment for transporting heavy goods, are is too expensive for the monthly rent and used inefficiently for construction. site so it is analyzed that it has problems of reducing productivity and efficiency of lifting work. Inefficient situations are arising like poor communications between operator and worker, occurrence of blind spots, securing the shortest distance of fire during movement after lifting plan, influences of weather, location of materials, movement radius of tower crane by each locations and ever-changing working environments. Therefore, in this study, we first made a list of tower cranes that are inefficiently used at the site, and then we made a checklist. After that, through field visits, we derived checklist for Tower Crane to comprehensive data value.