Korean Journal of Construction Engineering and Management
/
v.12
no.3
/
pp.53-61
/
2011
After several collapse accidents of large structures in the early 1990s in Korea, the government enacted a law that architectural, engineering and construction firms are obliged to have insurance for projects over a certain size. Particularly, with regard to insurance in design and construction supervision works (i.e. engineering insurance), although several operation-based problems were pointed out from practitioners, still little research has been done on analyzing current regnlartory and operational state and suggesting policy alternatives. Hence, this study applies Delphi technique to solicit current operational problems and propose a series of improvements on engineering insurance based on interview surveys targeting major market participants: municipalities, engineering firms, and insurance companies. Key findings culminate in adopting guarantee limits based on credit evaluation, abrogating joint surety, covering a loss of life, increasing insurance entrance fee, extending time covered, and etc. Reaching a consensus on the proposed alternatives between the market participants will form the foundation for sound developments of construction design and engineering industry.
Proceedings of the Korean Association of Geographic Inforamtion Studies Conference
/
2008.10a
/
pp.236-242
/
2008
설계용역과 통합하여 발주되는 측량용역의 입찰 제도를 보면 계획기관에서 설계예산서를 작성하여 해당 부처 분임경리관을 경유하여 공개경쟁입찰 또는 입찰참가자격제도(PQ) 등으로 발주하게 된다. 이 과정에서 측량용역과 설계용역을 분리하지 않고 측량용역 비를 설계용역비에 통합예산으로 발주 처리하고 있어 측량회사는 설계용역사로부터 불법으로 하도급 받고 있다. 설계용역회사는 엔지니어링등록과 측량업(공공측량)을 동시에 등록하여 용역수주를 하므로 기술력이 부족한 측량용역을 당연히 저가하도급으로 처리하는 커다란 모순이 발생하고 있다. 따라서 저가하도급으로 인한 측량성과의 부실은 건설공사의 부실시공으로 이어져 커다란 공사비손실과 안전 및 유지관리에 큰 문제점을 야기하고 있다. 이와 같은 문제점을 해결하기 위하여 본 연구에서는 측량용역 등록업체의 현황 및 현행 발주제도 방법 등의 분석을 통하여 발주제도의 개선방안을 제안하고자 한다.
Choi, Hyun-Chul;Lee, Yunjae;Lee, Si Eun;Kim, Chee Kyeong
Journal of the Computational Structural Engineering Institute of Korea
/
v.27
no.4
/
pp.289-296
/
2014
The rebar detailing is an important work influencing the final performance and quality of RC structures. But it is one of the most irrational and illogical activity in construction site. Many groups of workers, including main contractors, structural engineers, shop drawers, rebar fabricators, and etc., participate in this activity. A loosely-organized process for this activity is apt to produce a big amount of rebar loss or even degraded structures. A 3-dimensional rebar auto-placing system, called as Rebar Hub, has been designed and implemented in this research. Rebar Hub provides a totally integrated service from 3D structural modeling of buildings to rebar auto-placing considering anchorage, splice, and the length of ordered rebar. In addition, Rebar Hub can recognize the 2D drawing CAD files and then build 3D structural models which are used for the start point of 3D rebar auto-placing. After rebar auto-placing, each members of the 3D structural model have rebar information belonging to them. It means that the rebar information can be used for the afterward works such as quantity-survey, manufacturing and fabrication of rebars. Rebar Hub is showing outstanding performance while applying to practical projects. It has almost five times productivity and reduces the rebar loss up to 3~8% of the initially-surveyed amount of rebar.
Korean Journal of Construction Engineering and Management
/
v.7
no.2
s.30
/
pp.98-108
/
2006
The cost of construction engineering field is less than $3{\sim}5%$ of the gross construction cost, it, however, is very important because the performance of final facility depends on the technical ability of construction engineering company. However, as the results of the technical level of domestic construction engineering survey from experts, it was less than 70% of developed country. For this reason, domestic construction engineering companies are confronted with serious problems to go into overseas market. Accordingly, this research analyzed the construction engineering market trend of domestic and overseas in order to suggest the strategies to go into the Vietnam. Moreover, this research identified problems and strategies of making inroads into the world market through the survey from the domestic construction company related to overseas construction, advanced a theory through extensive literature review, and collected extensive opinions through an interview with domestic and foreign experts and business trip. The purpose of this research is to provide market analysis and strategic plan for advancing into overseas market in order to make the domestic construction engineering companies to go into the Vietnam market. Especially, as a plan for the revitalization of advancing overseas market of domestic construction engineering companies, this research proposed Constructing Local Infrastructure, Business Creation of Planning Proposals and Enlarged Plans of ODA(Official Development Assistant).
Journal of the Korea Academia-Industrial cooperation Society
/
v.16
no.6
/
pp.4176-4184
/
2015
Cost Estimate for alternative in design phase of construction become criterion for profitability and feasibility analysis of projects. Initial design phase performed schematic estimate based on similar data in the past. The quantity take-off according to estimators experience and calculation method are occurred different or missing. IT (Information Technology) technology evolution has been promoting BIM technology in construction. It is changing the paradigm of planning, design, construction and maintenance phase throughout the construction project. A number of studies have been attempted to apply BIM technology in the construction. In this paper, we propose schematic estimation framework linking standard format IFC (Industry Foundation Classes) and estimate related knowledge. As a result, it performs a cost prediction for decision-making in the design phase, and expected to overcome the limitations of previous studies. In addition, it is possible actively coping with changes.
Proceedings of the Korea Water Resources Association Conference
/
2016.05a
/
pp.481-481
/
2016
하천퇴적물은 물의 순환과정에서 유역으로부터 유입되는 물질에 따라 조성이 변하게 된다. 특히 입자가 작은 토양과 유기성 물질들은 물순환과정에 이동성이 크게 나타나며, 인간에 의해 개발된 지역은 자연상태에 비해 이동하는 물질이 많이 나타나곤 한다. 본 연구에서는 하천에 건설된 보에 대한 퇴적물 조사를 실시함으로서 향후 수질관리에 필요한 기초 자료를 수집하고자 하였다. 본고에서는 금강과 낙동강에 건설된 보의 주요지점에 대한 퇴적물 조사를 실시하고 수질영향을 평가하였다. 조사는 홍수기전과 홍수기후로 구분하여 2회에 걸쳐 실시하였으며 물리적 성상과 화학적 항목에 대한 분석을 실시하였다. 입도분석 결과 금강 주요 10개 지점의 퇴적물 조성은 Sand, Silt와 Clay 성분이 혼합되어 있는 것으로 분석되었으며, 삼각좌표 분류법에 의한 토성은 대부분의 지점이 실트질양토(SiL)로 평가되었다. 완전연소가능량은 0.35~1.37로 전 지점에서 하천 호소 퇴적물 오염평가 기준의 유기물 함량기준 13%보다 높지 않은 것으로 나타났으며 홍수기 전 후에도 거의 유사하였다. 금강에서는 중금속뿐만 아니라 유기물 및 영양염류도 기준보다 낮게 나타났으며, 모든 항목에서 환경부예규인 하천 호소퇴적물 오염평가 기준보다 낮게 평가되었다. 하상 퇴적물이 수질에 미치는 영향을 평가하는 용출실험에서도 유기물 및 중금속 모두 수질에 미치는 영향은 거의 없는 것으로 평가되었다. 낙동강 주요 26지점의 입도분석 결과 퇴적물 조성은 대부분 Sand로 구성되어 삼각좌표 분류법에 의한 토성은 사토(S)로 평가되었다. 홍수기 전 후에 조사한 결과 완전연소가능량은 0.27~2.85으로 전 지점에서 하천 호소 퇴적물 오염평가 기준의 유기물 함량 기준보다 낮았으며 홍수기 전 후에도 거의 유사하였다. 화학적 성상 분석 결과 모든 항목에서 환경부예규인 하천 호소퇴적물 오염평가 기준보다 낮게 평가되었으며, 용출실험에서도 유기물 및 중금속 모두 수질에 영향을 거의 미치지 않는 것으로 평가되었다. 이번 조사는 4대강 건설 후 하상이 안정화 되지 않은 상태로 인해 지점간 특별한 경향성은 확인할 수 없었으며 보다 정확한 결과 도출을 위해서는 장기적인 조사를 통해 평가해야 할 것으로 판단되었다.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
2008.11a
/
pp.597-600
/
2008
Recently, Several Mega project are been performing as a multi-dimensional development project in Korea, but some problem has been revealed about deficiency of the history, experience, and skill. A multi-dimensional development project require the technology which can manage mega project to its specific at the level of program management. predicting schedule and schedule management are the most important for mega project, been performing over several years. This research shows the method of predicting and planning schedule in the early stage as a pre-study on developing a technology of schedule management. First of all, it presents the development of database considering the specific of mega project that can accumulate the history of schedule and search the schedule according to the type of single and multi building. Also it suggests the method of prediction schedule by creating scenarios according to owner requirements and cash flow, affecting schedule management in the early stage, and the shortening possibility of schedule duration using CCPM theory.
Proceedings of the Korea Water Resources Association Conference
/
2008.05a
/
pp.1589-1593
/
2008
하천의 골재는 도로, 항만, 주택건설 등 다양한 건설재료로 이용되어 왔으며 급속한 산업화와 더불어 국가건설사업, 지방자치단체의 수익사업으로 인해 골재 수요가 급격히 증가해 왔다. 그러나 체계적인 조사 및 연구가 없이 무분별하게 행해진 하천준설은 하상저하, 하천의 불안정, 하상의 장갑화 등 물리적 영향뿐만 아니라 주변 하천의 식생, 저서생물의 서식처 등 수서생태계의 파괴, 하천정화능력 저하, 교각의 노출 등 생물적 경제적인 측면에서 악영향을 미치고 있다. 본 연구에서는 하천준설사업이 꾸준히 진행 중에 있는 감천을 연구대상지역으로 선정하여, 1차원 수치모형인 Hec-ras4.0을 이용하여 준설량에 따른 흐름특성 및 교란된 하천의 적응과정을 분석하였다. 지형자료는 수치지도 및 실측자료를 토대로 하여 구축하였으며 장 단기 하상변동을 모의해 비교 분석하였다. 그 결과, 준설구간의 흐름특성은 준설전에 비해 수위가 감소되었고 하상변동은 준설구간의 상류부에서는 하상저하가 발생하였으며 하류부에서는 하상상승이 발생되었다. 본 연구의 결과는 하천준설에 따른 하천환경 및 물리적 영향을 최소화하고, 하천공사 실시와 수공구조물의 설계 및 유지관리 등에도 활용될 수 있을 것이다.
Korean Journal of Construction Engineering and Management
/
v.14
no.3
/
pp.3-11
/
2013
The changes in construction business have impact on overall operation of construction companies. Poor business of construction companies following a s low industrial cycle could have broader implications and influences on the industry. Since a construction project involves various stakeholders including public organizations, financial institutions and households, a downturn in construction industry might lead to significant economic loss. In this regard, it is meaningful to examine the relationship between changes in construction business cycles and insolvency of construction companies. This study conducts an empirical analysis of the relationship between construction business cycles and how much they affect operation of construction companies. To this end, KMV model was used to estimate probability of bankruptcy, which represents business condition of a construction company. To examine construction business cycles, investment amount for different construction types-residential, non-residential, and construction work-was used as a variable. Based on the investment amount, VECM was applied and the analysis results suggested that construction companies should put priority on diversifying project portfolio. In addition, it was shown that once a construction company becomes unstable in business operation, it is hard to recover even when the market condition turns for the better. This suggests that, to improve business operation of a construction company, internal capacity-building is as important as the market condition and other external circumstances.
KSCE Journal of Civil and Environmental Engineering Research
/
v.36
no.3
/
pp.573-586
/
2016
In construction jobs, a combination of various kinds of machinery is used to perform earthworks at a large-scale site. Individual equipments essentially cooperate with each other on task such as excavation, load, transfer and compaction. While other area have studied cooperation system, related study in domestic construction is in poor condition. In this study, construction equipment fleet management system is developed for solving this problem and find way to improving efficiency in earthworks site. The entire concept of the fleet management system, including its components and process, has been systematically outlined in this paper. An operational methodology has also been suggested, where a number of machines, such as the excavators, trucks and compactors, are chosen and further grouped into a cluster. A case study verify fleet management system's effectiveness on performing task package by comparing existing work method with methodology in this study. Fleet management system in this study is expected to curtail fuel consumption by the reduction of working time and moving distance. Furthermore, it can be anticipated to declining carbon emission effect.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.