Development of a Modular Building System for the BOQ Using Six-sigma (식스-시그마를 이용한 군 독신자 숙소용 모듈러 건축 시스템 개발)

  • Cho, Bong-Ho;Lee, Jae-Sung;Cha, Hee-Sung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.6
    • /
    • pp.89-99
    • /
    • 2010
  • Military Barracks and Bachelor Officer's Quarters are public buildings representing architectural characteristics with repeating the same room modules. These buildings require easy dismantling and reusing for the next generation' military re-organization. For these reasons, since 2005, the modular construction has been applied to military buildings. The most important factors required for modular military buildings are standardization, lowcost construction and reusable construction method. However, conventional modular building system have not been matched with these requirements. This study suggests a new modular system for Bachelor Officer's Quarters using Six-sigma design tool. To reflect the voices of customers, market study and surveys were carried out. Through the QFD, the voices of customers were converted into quality characteristics of building system for BOQ. The various design concepts meeting customer's requirement were derived by the QFD and Pugh matrix methodology. The proposed modular building system shows 80% increased factory production rate and 62% decreased weight of steel frame as compared with the conventional modular building system.

Towards a Transportation Support System for Off-site Construction : Identifying Key Functions and Diagramming Functional Blocks (오프사이트건설(Off-site Construction) 운반 시스템을 위한 핵심기능 도출 및 시스템 기능 전개도 개발)

  • Lee, Gangho;Kim, Minguk;Lee, Chansik;Koo, Choongwan;Kim, Taewan
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.2
    • /
    • pp.21-30
    • /
    • 2021
  • The existing construction industry is classified into industries with low productivity compared to other industries. In order to solve the decline in productivity in the construction industry, the world is focusing on off-site construction (OSC), which is about 40% more productive than existing construction methods. This high productivity is possible because the three stages of production, transport to the site, and site assembly are consistently maintained in a continuous flow. This study conducted a functional survey through literature review, preliminary field survey, questionnaire, and expert interview. The surveyed function were classified into five categories: convenience, flexibility, manageability, communication, and safety, and the functional characteristics of flexibility, manageability, and communication were high. Because of the change according to the construction progress, the production schedule of the factory, and the variety of transportation time required. Finally, A functional block diagram was developed based on the 15 functions corresponding with an average score of 4 or more in the surveyed function score result. If the OSC transport system is established through this study, It can contribute to a successful construction OSC project and increase productivity.

Fully Coupled Seismic Analysis of Stress-Flow According to Tunnel Drainage Type (터널 배수 형식에 따른 응력-침투 연계 내진해석)

  • Byoung-Il Choi;Myung-Ho Ha;Dong-Ha Lee;Eun-Cheol Noh;Si-Hyun Park
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.27 no.4
    • /
    • pp.94-103
    • /
    • 2023
  • Built in urban ares tunnels is necessary to accurately grasp not only the above-ground environment of the tunnel but also the below-ground environment of the tunnel for design and construct. However, fully coupled analysis of stress and flow is very difficult due to the limited function of the tunnel numerical analysis program and difficulty in using program. This can lead to excessive design that increases the construction cost or occur problems that can lead to accidents during construction. In particular, in the case of an urban tunnel has a low layer soil section above the tunnel and the groundwater level exists in the upper layer of the tunnel. Therefore, a reduction in the groundwater level during underground construction may increase the effective stress of the upper layer and cause the ground to subsidence. So It is necessary to design after accurately evaluating the change in the groundwater level. In this study, the tunnel's behavioral characteristics were analyzed through fully coupled analysis of stress and flow according to the drainage type for an urban underground tunnel.

A Review on the Decision-making Process for Calculating Land and Construction Costs in the Early Stages of the Project - Focusing on the Housing Vonstruction Project in Jeju Island - (사업초기단계에서 토지비 및 건축공사비 산정을 위한 의사결정프로세스에 관한 고찰 - 제주도 내 주택건설사업 중심으로 -)

  • Jo, Seong-Min;Cho, Sung-Hee;Jeon, SangHoon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.321-322
    • /
    • 2021
  • This study is to develop a non-contact construction project management solution that can reduce cost and construction period through on-site information sharing, minimizing contact with others by COVID19, and improving the productivity of the construction industry. Decisions, checklists, and execution rates of construction costs can be checked with smart devices through sharing on-site photos and videos, exchanging opinions. Details and checklist data stored on cloud servers of sites that apply non-face-to-face construction project management solutions will be used as data for analyzing amounts and construction periods depending on the size of the construction. Real-time field information sharing will reduce expected problems and waste factors, expand communication channels with users to prevent or minimize construction disputes and claims, and contribute to the expansion and growth of new research industry markets in construction technology.

  • PDF

Constitution of Work Process for the Remodeling Construction Project in Planning Phase (건축물 리모델링 기획단계에서의 사업수행 프로세스 구축)

  • Kwon, Won;Chun, Jae-Youl
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.6
    • /
    • pp.165-174
    • /
    • 2006
  • Recently, the architecture remodeling is rising as new alternative for activating the construction market as the interest toward life cycle of buildings has increased. But the reality is that current remodeling business is suffering various types of difficulties in its performance due to the absence of general management technology and factor technology in systematic performance procedure or evaluation, etc toward remodeling effect, evaluation on performance, imperfect system for reflecting user requirements and remodeling life cycle ; planning, $feasibility ^{\circ}\hat{E}designing^{\circ}\hat{E}construction^{\circ}\hat{E}management$ along with lack of overall understanding on remodeling. Accordingly, this research has attempted to search for an effective management method through overall understanding in project performance by presenting work procedure of remodeling project and analysis items for decision making, etc centered on early planning stage out of three stages called planning, designing and construction.

Examination of Obstacles Impeding the Deployment of New Construction Technologies On-Site and Development of an Activation Strategy (건설신기술의 현장활용 저해요인 분석 및 활성화 방안)

  • Park, Hwan Pyo;Bae, Byung Yun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.23 no.4
    • /
    • pp.369-380
    • /
    • 2023
  • The incorporation of innovative technology systems into domestic construction practices has catalyzed an organic evolution of the industry, significantly enhancing the level of domestic construction technology and intensifying competitiveness. In particular, the on-site implementation of these groundbreaking construction technologies has proven effective in diminishing construction costs and accelerating project timelines. Nevertheless, despite a period of 33 years since the inception of this new construction technology system, both the volume of designated construction technologies and their practical application on construction sites remain static. As a consequence, this study introduces a strategic plan to dissect and overcome the barriers faced in the adoption of new construction technology across a multitude of sectors. The chief outcomes encompass the inception of a new construction technology utilization surveillance system, an assessment of distinct technologies, refinement of the post-evaluation system, and the creation of a new technology market system. This systematic enhancement is anticipated to foster the practical application of new construction technologies within the industry.

An Analysis of Safety Zone Appropriateness of Urban Railway Box Structures by Adjacent Excavation Using Machine Learning Technique (머신러닝 기법을 적용한 인접굴착에 따른 도시철도 박스구조물의 안전영역 적정성 분석)

  • Jung-Youl Choi;Jae-Seung Lee;Jee-Seung Chung
    • The Journal of the Convergence on Culture Technology
    • /
    • v.9 no.3
    • /
    • pp.669-676
    • /
    • 2023
  • This study analyzed the relationship between major parameters and numerical analysis results according to various excavations conducted around the urban railway, application of machine learning techniques and verified the scope of influence of the adjacent excavation on the existing urban railway box structure and the appropriateness of the safety area. This study targeted the actual negotiated adjacent excavation works and box structures around the urban railway, and the analysis was conducted on the most representative two-line box structures. The analysis confirmed that the difference in depth of urban railway, excavation depth of adjacent excavation, and depth of underground water level are important parameters, and the difference in excavation depth of adjacent excavation is the parameter that affects the behavior of underground box structures and is an important requirement for setting safety areas. In particular, the deeper the depth of the adjacent excavation work, the greater the effect on the deflection of the underground box structure, and the horizontal separation distance, one of the important requirements for determining the management grade of the existing adjacent excavation work, is relatively small.

A Study on the Development of the Cash-Flow Forecasting Model in Apartment Business factoring tn Housing Payment Collection Pattern and Payment Condition for Construction Expences (분양대금 납부패턴과 공사대금 지급방식 변화를 고려한 공동주택사업의 현금흐름 예측모델 개발에 관한 연구)

  • Kim Soon-Young;Kim Kyoon-Tai;Han Choong-Hee
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.353-358
    • /
    • 2001
  • Since the financial crisis broke out, liquidity has become the critical issue in housing construction industry. In order to secure liquidity, it is prerequisite to precisely forecast cash flow. However, construction companies have failed to come up with a systematic process to manage and forecast cash flow. Until now, companies have solely relied on the prediction of profits and losses, which is carried out as they review business feasibility. To obtain more accurate cash flow forecast model, practical pattern of payments should be taken into account. In this theory, basic model that analyzes practical housing payment collection pattern resulting from prepayments and arrears is described. This model is to complement conventional cash flow forecast scheme in the phase of business feasibility review. Analysis result on final losses in cash that occur as a result of prepayment and arrears is considered in this model. Additionally, in the estimation of construction cost in the phase of business feasibility review, real construction prices instead of official prices are applied to enhance accuracy of cash outflow forecast. The proportion of payment made by a bill and changes in payment date caused by rescheduling of a bill are also factored in to estimate cash outflow. This model would contribute to achieving accurate cash flow forecast that better reflect real situation and to enhancing efficiency in capital management by giving a clear picture with regard to the demand and supply timing of capital.

  • PDF

A Study on the Improvement of the Design VE Process using VE Idea-DataBank System (설계 VE 프로세스 개선을 위한 VE Idea-DataBank System 구축에 관한 연구 - 한국도로공사 고속도로 건축공사를 대상으로 -)

  • Park, Heetaek;Park, Chansik;Jung, Wooseob
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.1
    • /
    • pp.28-38
    • /
    • 2014
  • Construction value engineering(VE) is often performed in the form of a short term review of designs, rather than during a regular workshop with a standardized work plan, and its application method is limited. Thus, tasks are performed by applying the method in reverse depending on the VE results, and function analysis, a key VE method, is omitted or only applied for the sake of formality. In addition, it is hard to expect great results from VE because of insufficient time and budget allowed to perform VE and a lack of understanding of VE procedures and methods. In particular, the methods used to store and reuse the tremendous amount of ideas and information created during the process of VE implementation is not systematic. Even the Korea Expressway Corporation, which has produced relatively systematic VE performance compared to other institutions, has had the above-mentioned problems. Therefore, this study aims to improve existing VE processes and suggest a method to efficiently store and retrieve VE information by analyzing the limitations of construction VE practice and the characteristics of VE for highway facilities as part of improving design VE performance.

Improvement on the Managerial Method of Price Fluctuation System (물가변동제도 운영방식 개선방안)

  • Lee, Jae-Seob;Shin, Young-Chul
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.2
    • /
    • pp.3-11
    • /
    • 2011
  • There are several causes to recalculate the contract amount in public construction projects. Among them, the escalation clause was introduced in 1969 and now the condition to recalculate the cost is effective after 90 days from the date of contract and the rate of fluctuation should be more than 3% from the date of bidding. The two calculation methods for the rate of fluctuation are item-adjustment and index-adjustment. According to the results of investigation into 4 public institutions and 163 projects, all of them have used the method of index-adjustment and the rate of projects that spend over 6 months obtaining the approval of contract amount adjustment is more than 90%. The reason for spending lots of time is caused by problems of the calculation method on the price fluctuation rate. Therefore, it is necessary that the calculation method should be diversified to cope with the problems and a option of the builder should be expanded as well. Furthermore, if the way to apply correction factors to construction price index and average index based on the producer and consumer price index made by the bank of Korea is added, then the duration will be reduced without additional expenses. This study proposed the diversification of the calculation method using price fluctuation rate and builders' expanded options as improvement on the managerial method of Price Fluctuation System for the prompt and efficient contract amount adjustment.