A Study on the Technological Improvement of Strut as a Permanent Structure (구조물 겸용 흙막이 스트러트 공법의 개선 연구)

  • Kim, Sun-Kuk;Hong, Won-Kee
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.5
    • /
    • pp.186-193
    • /
    • 2008
  • The SPS, Strut as a Permanent System, method is widely adopted for the main structural member in addition to temporary strut function for the shuttering of excavation work. Although the SPS method has contributed to cost saving, time reduction, enhancement of structural stability, improvement of construction environment and so on at the building construction site, it caused the problems of increase of basement height and additional work for fire protection of steel structure. The increase of basement height caused the increase of shuttering depth and excavation, and the fire protection caused the additional cost as well as the deterioration of construction environment. In order to improve the problems, this paper is to propose a modularized hybrid structural system(HSD). The detail of the system is introduced and the structural performance and constructibility are proved through the experiment and site application.

A Study on the need to strengthen safety and health activities of private construction contractors (건설공사 민간 발주자의 안전보건활동 강화 필요성에 관한 고찰)

  • Keun-Kyu Lee;Min-Je Choi;Guy-Sun Cho
    • Industry Promotion Research
    • /
    • v.9 no.2
    • /
    • pp.69-75
    • /
    • 2024
  • Korea has entered the ranks of advanced countries in terms of economic size and technological competitiveness. However, its industrial accident fatality rate remains among the lowest in OECD countries, and recent incidents such as various building collapses have resulted in numerous deaths of workers or citizens, reminiscent of accidents in developing countries. According to the 2022 Industrial Accident Status Analysis by the Ministry of Employment and Labor, out of the 874 fatalities in work-related accidents in 2022 across all industries, 402 were in the construction industry, accounting for approximately 46% of all fatalities. In particular, the construction industry's fatality rate stands at 1.61, significantly higher than the overall industry fatality rate of 0.43, indicating its severity. Construction ranks highest in terms of fatality rates, with mining at 12.18 and fishing at 1.80. When categorizing construction projects into private and public, private projects show significantly higher figures in terms of contracts, contract amounts, accident numbers, and fatalities compared to public projects. However, unlike public agencies, many private clients lack adequate safety and health activities and lack established safety and health systems. This study aims to raise awareness among private clients about the need to establish safety and health systems and enhance safety and health activities, and to discuss the direction of future development of advanced safety and health practices among private clients.

기능성과 경제성을 겸비한 세종지하차도 설계

  • Jo, Seong-Tae;Song, Guk-Hwan;Lee, Hui-Geon
    • 한국도로학회지:도로
    • /
    • v.10 no.2
    • /
    • pp.58-67
    • /
    • 2008
  • 교통량이 많은 도심지내 장대 지하차도 건설은 교통정체 해소에 기여를 하지만 초기 공사비가 많이 소요되는 단점이 있다. 또한, 화재등 유고시 이용자의 안전을 최우선으로 고려되어야 한다. 즉, 장대 지하차도 건설에 있어서 경제성과 안전성이 함께 만족할 수 있는 건설 방안이 필요하다. 세종지하차도는 이러한 문제점을 극복하고자 다음과 같이 지하차도의 환기방식 및 단면, 포장형식, 사고 예방 및 발생시를 대비한 종합방재시스템을 구축하였다. $\cdot$환기방식은 종류식 환기방식의 경제성과 횡류식 환기방식의 제연성능을 겸비할 수 있는 조합형 환기방식과 Duct Arch 단면을 적용하여 공사비 절감 및 운영시 유지관리비를 획기적으로 절감하였다. $\cdot$지하차도 포장형식은 화재시 내화성이 우수하며 유독가스 발생이 없는 HPC(고성능 콘크리트 포장) 포장을 적용하여 이용자의 안전을 최우선으로 고려하였고 일반 아스팔트 포장 및 배수성 아스팔트 포장에 비해 우수한 성능과 공용수명을 가진 공법을 적용함으로서 유지보수비용의 절감을 가능하게 하였다. 또한, 콘크리트포장의 단점인 소음발생을 최소화하기 위해 타이닝과 그루빙을 적용하였다. $\cdot$지하차도내 화재 등 유고시 신속한 대피가 가능하도록 피난 연락문 간격을 167m 간격으로 설치하고 비상탈출계단 6개소를 확보하였다. 또한 노약자 및 환자의 지하차도 외부로 대피를 돕기 위해 비상엘리베이터 3개소를 설치하는 등 사고발생 시 종합적으로 대처할 수 있는 시스템을 마련하여 적용하였다.

  • PDF

Comparison of the Construction Waste Generated by the Project and the Estimation of the Waste Generation Unit (건설공사 공정별 건설폐기물 발생량 비교 및 폐기물 발생 원단위 산정에 관한 연구)

  • Song, Tae-Hyeob;Seong, Jin-Uk
    • Journal of the Korean Recycled Construction Resources Institute
    • /
    • v.5 no.4
    • /
    • pp.427-434
    • /
    • 2017
  • The generation of construction waste can be divided into a decommissioning phase and a new construction phase, and most of the waste is generated at the decommissioning stage. However, recently, domestic new construction construction has expanded to 150 trillion yards per year, so construction work is increasing rapidly. Especially, as the size of the construction work with much waste of construction waste exceeds 100 trillion, the management of the amount of construction waste in the new construction site is required. Unlike the dismantling work site, the new construction site can separate waste generated by each property, and relatively low foreign matter content is generated. The purpose of this study was to investigate the amount of construction waste generated by new construction sites and to calculate the unit amount of construction waste based on this. In addition, since the existing unit cost is centered on concrete and mixed waste, we set the basic unit by setting synthetic resin, waste wood, and waste board as additional items. The basic unit survey was carried out to investigate the wastes according to the characteristics of each construction period. As a result of the survey, the new construction site showed that most wastes were discharged in the first 30% and after 70% of the process, and the ratio of mixed construction waste was as high as 45%. As a result of this study, it was found that about twice as much waste was produced as compared with the conventional standard product.

An Analysis of Planning Practice for Reinforced Concrete Core-Wall Construction in High-Rise Building Construction (초고층건물 R/C조 코어월 선행공사의 시공계획 실무에 관한 분석)

  • Ahn Byung-Ju
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.2 s.18
    • /
    • pp.194-201
    • /
    • 2004
  • Core-wall construction method is applied in many high-rise building constructions. This is caused by the advantages of the method such as the effect of saved construction cost and shortened period. However, the analysis study of planning practice for core-wall construction shows matters take place during core-wall construction, such as increasing in construction cost and period. These matters result from the limited work space leading to low productivity, the activity interference leading to increasing in period, additional temporary work cost and time, and delayed concrete pour activity. A large part of these can be prevented taking place by very detailed and most careful core-wall construction plan. Therefore, this study suggests improvement directions of core-wall construction planning process focused on the cooperation system of a contractor between a sub-contractor and the process.

A Rating Method for the Estimation of the Additional Overhead Expenses incurred by Schedule Extension in Public Construction Projects (공공건설공사의 공기연장에 따른 추가간접비 산출을 위한 요율방식 제안)

  • Lee, Seung-Joon;Cha, Yongwoon;Han, Sangwon;Hyun, Chang-Taek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.3
    • /
    • pp.79-90
    • /
    • 2021
  • In domestic public construction, disputes are increasing due to differences among stakeholders regarding contract price adjustment. In particular, the actual cost-plus fee for overhead costs due to the schedule extension cannot be agreed upon at the administrative phase, and most of them seek judicial judgment. Thus, this study aims to propose a 'sufficiently satisfactory' alternative to reach an agreement before disputes in order to minimize disputes related to the calculation of additional overhead costs. To this end, this study proposes three alternatives based on the rate method. Firstly, when calculating additional overhead costs, it is not calculated as an actual cost-plus-fee method, but as a rate compared to direct labor costs among net direct costs. Secondly, the calculated indirect labor costs are compensated for up to the legal maximum of legal limit costs such as general management costs, profits and so on. Thirdly, it reflects overhead costs increased or decreased due to change orders. Risks were analyzed by collecting expert opinions on the proposed methods and applying actual cases. Finally, as a result of investigating the level of consensus for each stakeholder, it was confirmed that all stakeholders could agree regardless of the size of the company. The result of this study is expected to as a useful tool among stakeholders in the construction fields that can be able to easily agreed upon.

Systematic Improvement for Effective Operation of Long-Term Continuous Construction Contracts (장기계속공사계약의 효율적 운영을 위한 제도 개선)

  • Cho, Youngjun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.6
    • /
    • pp.3-10
    • /
    • 2019
  • The entire duration of the long-term continuous construction contract project cannot be expected when calculating the initial budget as the construction of the contract is carried out annually according to the budget composition. In addition, the statutes related to the defect liability and execution of contracts have not been established systematically in relation to the contract. Therefore, there are many problems at the actual construction site with regard to the defect liability or the performance of the contract in relation to the contract. In this study, the following improvement directions were presented for the efficient operation of the contracts: First, the defect liability is legal and should be specified in an Act rather than an enforcement decree. Second, if the parties to the contract vary in the following order in the contract, the special agreement should be specified in the enforcement decree. Third, in the event of an indirect cost due to the extension of the period of the long-term continuous work, the contingency items of the total project cost management policy should be utilized. Fourth, in the case of general construction contract conditions, clauses related to the purchase of the premium of the CAR, inspection, taking over, defect repair, and defect inspection shall be supplemented.

A Study on the Development of New SRC Lining Board (신형 SRC 복공판의 개발에 관한 연구)

  • Kown Beom-Jun;Park Do-Uk;Kim Yong-Su
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.4 s.26
    • /
    • pp.172-180
    • /
    • 2005
  • The purpose of this study is to suggest a new SRC(Steel Ready mixed Concrete) lining board. The research method of this study includes problem analysis of existing lining boards a constant load test and a fatigue test. The results of this study are as follow : 1) the suggested new lining board improves the function and reduce slipperiness than existing lining boards. 2) the strength of the new SRC lining board is analyzed as superior than existing lining boards from the results of constant load test and fatigue test.

Development of Bill of Service Framework for Modular Housing Construction (모듈러 공법의 특성을 적용한 공동주택의 내역 체계 개발)

  • Hwang, Jinsub;Choi, Sanghee;Lee, Jaeseung;Kim, Yea-Sang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.5
    • /
    • pp.138-146
    • /
    • 2014
  • Modular construction is one of the arising issues in the Korean construction industry due to shorter construction period and higher productivity on site. It is also expected that modular construction market would expand rapidly because of increasing demand of small houses by nuclear families and eco-friendly construction. However modular construction cases have been limited in Korea because of little demand in the market and the construction prices are even higher that the regular reinforced concrete methods. Even worse, because there is no standard bill of services exists in the industry, it may lead to the risk of construction expenses. So, the purpose of this study is focused on the development of bill of services which reflects characteristics and process of modular construction. In order to do this, the concepts and process of modular construction, WBS and CBS are analyzed. Analyses of the case studies and experts interview were executed so that proper principles for organizing bill of service of modular construction is established. Finally according to the 3 steps of modular construction, factory manufacturing, on-site modular construction and on-site general construction, the standard bill of services were suggested with the related coding system.

Development of Intelligent Excavating System;Introduction of research center (지능형 굴삭시스템 개발;연구단 소개)

  • Seo, Jong-Won;Park, Chang-Woo;Jang, Dal-Sik
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.197-204
    • /
    • 2007
  • Nowadays, the construction industry is suffering from the decrease of labor productivity caused by the lack of skilled workers and the aging labor forces. The hazardous work conditions and safety problems still exist at the construction sites. The earthwork operation is not the exception. The number of skilled earthwork equipment operators has been rapidly reduced and the equipment needs to be operated in dangerous / hazardous work sites. Thus, through the development of intelligent excavating system, Intelligent Excavating System(I.E.S) research team tries to enhance the safety of work environment, productivity, quality, and payability of the earthwork operation. It is also expected that this research contributes to the development of fundamental construction automation technologies and to the creation a new market sector.