• Title/Summary/Keyword: 건설감리

Search Result 196, Processing Time 0.032 seconds

The Voluntary Assurance of Quality by Contractors in the Construction Phase (건설 공사단계에서 수급자 중심의 품질확보방안)

  • Cha, Sang-Ho;Lee, Sang-Beom
    • Journal of the Korea Institute of Building Construction
    • /
    • v.11 no.3
    • /
    • pp.292-300
    • /
    • 2011
  • The construction industry in Korea has seen significant improvements in quality management techniques, driven by the dramatic development of new technology through Manhattanization and enlargements, but compared with technical development, the level of building quality improvement is still lagging behind. In the meantime, as the interest in construction quality soars due to changes in user consciousness, the level of quality that is being demanded is rising. The government has reinforced quality systems by implementing responsible supervision requirements and granting overseas companies permission to enter the supervision business in Korea, and private sector companies also are attempting quality improvement through quality assurance approaches like the preliminary qualification screening system and ISO 9000 series. But currently, building constructions are done only according to the construction specifications of project owners, whose design, materials and construction methods are already decided, and do not leave any necessity or opportunity for technical developments for the quality improvement of contractors. Therefore, in this study, a work process and system improvement plan for payment regulations is proposed, with which contractors can secure quality voluntarily in the building construction phase.

A Study on the Improvement of Engineering and Construction Supervision Guarantee System in Korea (국내 설계.감리 등 용역보증제도 현황 및 개선방안 연구)

  • Lee, Yong-Hee;Choi, Jae-Ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.3
    • /
    • pp.53-61
    • /
    • 2011
  • After several collapse accidents of large structures in the early 1990s in Korea, the government enacted a law that architectural, engineering and construction firms are obliged to have insurance for projects over a certain size. Particularly, with regard to insurance in design and construction supervision works (i.e. engineering insurance), although several operation-based problems were pointed out from practitioners, still little research has been done on analyzing current regnlartory and operational state and suggesting policy alternatives. Hence, this study applies Delphi technique to solicit current operational problems and propose a series of improvements on engineering insurance based on interview surveys targeting major market participants: municipalities, engineering firms, and insurance companies. Key findings culminate in adopting guarantee limits based on credit evaluation, abrogating joint surety, covering a loss of life, increasing insurance entrance fee, extending time covered, and etc. Reaching a consensus on the proposed alternatives between the market participants will form the foundation for sound developments of construction design and engineering industry.

RI를 이용한 도로성토계기의 측정신뢰구간 예측 I

  • 전태훈;이석근;황주호;호광일;권정광;전홍배;양세학
    • Proceedings of the Korean Nuclear Society Conference
    • /
    • 1996.05d
    • /
    • pp.147-154
    • /
    • 1996
  • 외국에서는 도로건설시 성토관리용으로 '방사성동위원소(Radioisotope : 이하 RI)를 이용한 습윤밀도 및 함수량 측정장비'가 많이 사용되고 있는 추세이다. 국내에서는 1989년 제정된 건설 기술관리법 감리전문회사건립 등록기준에 밀도\ulcorner함수량 측정기의 보유가 명시되어 있고 시공성 향상 차원에서 도입될 예정이다. 그러나 국내의 토양에 맞게 제작되어지지 않았고 사용상의 방사선 관련 제약 때문에 기대만큼 실제 사용이 되지 않고 있다.$^{(1)}$ 연구발표내용은 국내에서 제작, 실험하여 만들 RI계기개발의 기초가 되는 내용이며, 만들어질 계기의 부품과 계산과정 등을 예측하는 것이다.

  • PDF

The Effect of the Performance of Firefighting Construction Supervision Personnel on the Completion Inspection of Firefighting Facility Construction in Apartments (소방공사감리원의 업무수행능력이 아파트 소방시설공사의 완공검사에 미치는 영향)

  • Kim, Sang-Sig;Kong, Ha-Sung
    • The Journal of the Convergence on Culture Technology
    • /
    • v.5 no.3
    • /
    • pp.43-54
    • /
    • 2019
  • In this study, results of completion inspection are investigated according to the performance of the firefighting construction supervision personnel and according to the necessity of clean air supply in a performance test of the firefighting construction supervision personnel. The results of the completion inspection are measured and the causes of defects in the fire protection facilities after issuance of a completion inspection certificate are analyzed. The findings of this investigation can be used to minimize the risk of apartment fires and improve the performance of firefighting construction supervision personnel. The results of this study are summarized as follows. First, the results of the completion inspection conducted by the firefighting construction supervision personnel varies according to particular occupation. The performance of fire facility supervisors from design companies and fire construction companies were significantly higher than the fire officers. Therefore, it is necessary to employ supervisors who have experience in supervising the construction of apartments, in order to improve the performance of fire construction supervision officers. Second, the analysis of the completion inspection results according to the necessity of a clean air supply for performance tests of firefighting construction supervision personnel showed that the necessity of a clean air supply was significantly higher for fire facility supervisors from design companies and fire construction companies than for the fire officers. In order to improve, the completion inspection should be carried out up until the completion date of the building. In addition, a system needs to be established to ensure that clients are not able to demand that a completion inspection certificate be issued on the construction completion date. Finally, it is found that defects of completion inspection after issuance of a completion inspection certificate affects the result of the completion inspection. The results of the completion inspections conducted by the fire facility supervisors from design companies and fire construction companies were affected significantly less by defects than that of the general contractors. Research shows that faults have occured in firefighting facilities after the issuance of a completion inspection certificate due to the client and the construction company demanding the issuance of the completion inspection certificate.

PEB SYSTEM의 접합부 도장 안전성 및 일면용접 안전성

  • Do, Byeong-Ho
    • 건축구조
    • /
    • v.14 no.2
    • /
    • pp.30-34
    • /
    • 2007
  • PEB SYSTEM의 특징인 앤드플레이트 접합부 도장 안전성과 일면용접의 안전성 등은 국내 건설업계에 종사하는 기술자, 설계자, 감리자 등의 인식부족과 PEB업체의 기술홍보 부족으로 널리 알려지지 못한 까닭에 금번에 이 사항들을 논하고자 한다.

  • PDF

Improvement of Construction Management Process for the Site Manager in Small Scale Building Construction Project (소규모 건설프로젝트에서 현장관리업무 개선방안)

  • Lee, Da-Un;Yun, Seok-Heon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.18 no.1
    • /
    • pp.81-87
    • /
    • 2018
  • Since February 2017, site managers in small architectural projects are required by the revised building act. In order to address issues for site managers and to improve project efficiency, system improving methods are surveyed and proposed in this study. The key inspection items in the existing surveillance guidance manual were investigated, and the checklist for site managers for a small to medium sized construction site was analyzed. This study also tries to propose using web-based site management systems for improvement of the utilization of checklists. It is expected that these on-site management systems, along with BIM technology, will be able to monitor the small size building construction project in real time and effectively monitor the various problems occurring on-site.

현장탐방 - 수도권고속철도(수서~평택) 터널

  • 대한기계설비건설협회
    • 월간 기계설비
    • /
    • s.311
    • /
    • pp.40-51
    • /
    • 2016
  • Rail로 세상을 연결하여 국민의 행복을 창조하기 위해 노력하는 한국철도시설공단(이사장 강영일)은 수서~평택 간 수도권 고속철도사업을 올해 안으로 완수하기 위해 노력하고 있다. 한국철도시설공단이 추진하는 수도권고속철도(수서~평택) 건설사업은 서울 강남의 수서역에서 출발하여 동탄역을 거쳐, 평택역에서 현재 운영 중인 경부고속철도와 접속하는 노선으로 총 3조7천억원이 투입됐다. 지난 2011년 착공하여 올해 말까지 완공할 계획으로, 대부분의 구간을 지하로 건설한다. 수도권고속철도가 건설되면 KTX 수서역 동탄역이 신설되어 서울 강남 강동권 및 경기 동남부 지역까지 KTX 수혜범위가 확대되고 수서에서 부산까지 2시간 2분, 목포까지 1시간 52분으로 운행시간이 크게 단축되어 이용객 증가는 물론 지역균형발전과 성장동력 확보에 기여할 것으로 예상된다. 본지는 수서역사와 율현터널 현장에서 한국철도시설공단 수도권고속철도건설단 건축설비부 신승섭 차장(기계설비 감독관)과 율현터널(제1공구) 기계설비를 시공 중인 (주)세화이엔지[대표 박현수] 윤한식 현장소장, 수서역사 기계설비를 시공 중인 (주)초록이노텍[대표 양기준] 홍승훈 현장소장, (주)서한종합건축사사무소 홍형창 기계부장(감리단)을 만나보았다.

  • PDF

A Study on Association Rule and Cost Efficiency Analysis Model Using Construction Supervision Reports (건축공사감리 문서 기반 연관규칙 및 비용효율성 분석 모델)

  • Song, Tae-Geun;Yoo, Wi Sung
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.389-390
    • /
    • 2023
  • To improve the cost performance of construction sites, various systems and standards are constantly being developed and implemented. Although legal requirements for these system and standard improvements have been increasing, the cost efficiency performance of construction sites remains stagnant. We have digitized documents generated through construction supervision work at 39 building construction sites and proposed a model that can support decision-making in cost efficiency evaluation. This model selects key keywords that are considered to be highly related to cost efficiency by identifying the patterns and relationships of keywords through associated rule analysis and social network analysis using keywords derived from documents. In addition, it is expected to be used as a decision-making aid to determine the cost efficiency of a specific building construction site by establishing a logistic regression model using core keywords. As a systematic database of construction supervision documents and an integrated system of massive data generated by digital technology are established in the future, the accuracy and reliability of the cost efficiency evaluation model are expected to be reinforced.

  • PDF

Improving Construction Site Supervision with Vision Processing AI Technology (비전 프로세싱 인공지능 기술을 활용한 건설현장 감리)

  • Lee, Seung-Been;Park, Kyung Kyu;Seo, Min Jo;Choi, Won Jun;Kim, Si Uk;Kim, Chee Kyung
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.11a
    • /
    • pp.235-236
    • /
    • 2023
  • The process of construction site supervision plays a crucial role in ensuring safety and quality assurance in construction projects. However, traditional methods of supervision largely depend on human vision and individual experience, posing limitations in quickly detecting and preventing all defects. In particular, the thorough supervision of expansive sites is time-consuming and makes it challenging to identify all defects. This study proposes a new construction supervision system that utilizes vision processing technology and Artificial Intelligence(AI) to automatically detect and analyze defects as a solution to these issues. The system we developed is provided in the form of an application that operates on portable devices, designed to a lower technical barrier so that even non-experts can easily aid construction site supervision. The developed system swiftly and accurately identifies various potential defects at the construction site. As such, the introduction of this system is expected to significantly enhance the speed and accuracy of the construction supervision process.

  • PDF

해외건설공사 수행절차(5)

  • Korea Mechanical Construction Contractors Association
    • 월간 기계설비
    • /
    • no.10 s.219
    • /
    • pp.48-50
    • /
    • 2008
  • 해외건설공사를 성공적으로 수행하기위해서는, 낙찰통보전 낙찰가능시점부터, 현장소장을 비롯한 현장준비팀을 조직 운영하여, 계약서류상의 각종 요구사항, 승인사항, 인 허가사항, 현지법,공법,계약조건, 공정계획, 인원소요계획, 장비소요계획 등을 검토 한다. 또 현장답사 등을 통하여 견적시에 계획되고 작성된 모든 내용을 검토 보완, 수정 및 Update함과 동시에,선발대를 현장에 투입해 발주자로부터 현장을 인수하고 가설공사를 시작하며 조기착공에 서두른다. 단, 현장투입 전 발주자로부터 접수한 Letter of Intent(낙찰/계약의향서)상의 착공관련 조건을 확인하거나 Notice to Proceed(착공지시서)의 접수를 확인해야 한다. 시공자의 입장에서 건설공사의 궁극적인 목표를 이익의 극대화로 볼 때, 공사초기에서의 신속한 동원이야말로 목표달성에 이르는 지름길이며, 발주자 및 감리자로부터 신뢰를 받아 공사 전반에 걸쳐 순조로운 현장운영을 가능케 하는 것이다.

  • PDF