• Title/Summary/Keyword: 건물해체

Search Result 72, Processing Time 0.027 seconds

A Prospect of Explosives Demolition Based on Comparative Analysis of Demolition Cost. (해체공사비 비교분석을 통한 발파해체 공법의 전망)

  • Cho Tae-Wan
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.4 s.20
    • /
    • pp.130-138
    • /
    • 2004
  • The demolition works of high building in korea are expecting to increase rapidly in the near future, and its general demolition methods can be divided into mechanical demolition method and explosive demolition method. The selection of the right demolition method relies on many variable elements according to environmental and geographical elements. But, generally, the most important element of those is a economical profit. Accordingly, This study estimates each demolition cost dividing into mechanical demolition method and explosive demolition method of high building in city. And the estimating of the demolition cost makes it possible to do comparative analysis for the economical efficiency of each method more objectively than any other selective elements. Also, the analysis for the economical efficiency helps to forecast the activated time of the explosive demolition method in domestic.

Development of Protection Techniques for Explosive Demolition of RC Pillar (철근콘크리트 기둥 발파해체를 위한 방호기술 연구)

  • Chang Ha Ryu;Byung Hee Choi;Yang Kyun Kim
    • Explosives and Blasting
    • /
    • v.20 no.4
    • /
    • pp.17-28
    • /
    • 2002
  • Safety concern is one of the most important parameters in the design of building demolition by explosive blasting, Accidents were sometimes reported due to the flying chips of fragmented materials In building demolition work in urban area. Laboratory experiments were performed to investigate the failure behavior of reinforced concrete pillars under blast loading and to develop an effective protection technique. Sixteen reinforced concrete pillars were constructed. The failure behavior and the flying chip velocities were observed by means of a high-speed camera. Protection scheme was designed and the effects of several protection materials were investigated. Two kinds of non-woven fabrics and wire net were tested as protection materials. The results showed that reinforcing bar was one of the important factors to determine specific charges, and that mesh size of wire net and tied-up method affected the protection of flying chips. Control of gas effects is also a key to the control of flying chips. It was recommended to use both wire net and non-woven fabrics as primary and secondary protection materials. Such protection scheme was successfully applied to the explosive demolition of apartment buildings.

Application of New Connecting System of Wood Structures Using Bamboo Connector (대나무 접합물을 이용한 목조건물의 새로운 접합 시스템의 적용예)

  • Inoue, Masafumi;Park, Kang-Geun
    • Journal of Korean Association for Spatial Structures
    • /
    • v.6 no.2 s.20
    • /
    • pp.7-12
    • /
    • 2006
  • 최근 환경문제에 대한 해결책으로 목조건물의 해체 및 목재의 재사용에 대한 관심이 높아지고 있다. 목조건물을 접합철물에 의해서 접합할 경우에는 건물의 해체시에 철재를 사용하지 않아 목부재의 절단이 매우 용이하고 목재의 재사용이 용이하도록 하는 장점을 가지고 있다. 대나무의 높은 인성은 목재 접합부의 강도와 안정성 확보를 가능하게 해주고 있다. 대나무 접합물은 2005년 일본 Aichi 세계박람회에서 Japan pavilion Nagakute 전시관 건물이 대나무 접합부를 사용한 목조건물이다.

  • PDF

Development of Remote Controlled Demolition Equipment and Its Demolition Method for High-Rise Buildings (고층건물을 위한 원격제어 해체전용 장비 및 공법 개발)

  • Park, Jong-Hyup;Hong, Dae-Hie;Seo, Young-Soo;Kim, Hyo-Jin;Hong, Seok-Hee
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2008.04a
    • /
    • pp.957-960
    • /
    • 2008
  • The purpose of this study is to explore a safe, advanced, and environment-friendly demolition equipments and their operation methods. As an initial achievement, the capacity of the existing equipments have been evaluated through technical discussions and demonstrations with some experts in the related industry. From these evaluations, it was concluded that a haptic based remote control with force feed-back mechanism and sensor fusion functions would be the most appropriate to the demolition equipments. Therefore, a novel haptic device that is adequately designed for the demolition equipments is proposed in this paper. Top-down demolition method is also proposed, which is very effective in the demolition of high-rise buildings.

  • PDF

Case Study on the Explosive Demolition of the KOGAS Office Building in Bundang District (한국가스공사 분당사옥 발파해체 시공사례)

  • Kim, Sang-min;Park, Keun-sun;Son, Byung-min;Kim, Ho-jun;Kim, Hee-do;Kim, Gab-soo
    • Explosives and Blasting
    • /
    • v.36 no.4
    • /
    • pp.48-61
    • /
    • 2018
  • This case study is concerned with the project of the explosive demolition for the KOGAS office building located in Bundang district in Seongnam city. Since the office building was a kind of long-span beam structures, a mechanical demolition method using jacking support systems was considered in the beginning of the project. With consideration of the excessive reinforcement cost, uncertainty of safety, and prolonged construction period, however, the original plan was later changed to use an explosive demolition method. For the purpose of protecting nearby buildings and facilities during the collapse process, the explosive initiation sequence was elaborately designed to bring down the building structure towards its front left corner. A total of over 550 electronic detonators (Unitronic 600) was used to sequentially initiate the explosives installed at appropriate columns in the first, second, and fifth floors. To diminish dust production, water bags of small and large sizes were respectively installed at each column and on the floors to be blasted. As such, every effort was exercised to mitigate overall noise, dust, and shock vibrations that could be generated during the explosive demolition process for the office building.

A Case Study on Explosives Demolition of Central Library (중앙 도서관 발파해체 시공사례)

  • Park, Keun-Soon;Kim, Sang-Hoon
    • Explosives and Blasting
    • /
    • v.26 no.2
    • /
    • pp.77-91
    • /
    • 2008
  • According as demand for superannuated building increases recently, much researches about demolition method of construction are going on. This case study executed to center library building located in Dankook University. Explosives demolition method applied Progressive Collapse. Explosives demolition main blasting floors are 2, 4floor, assistance blasting floor is 1 floor. In the nearest distance (150 m), Vibration measurement result were 0.0302 cm/sec (PPV). Change was not in measurement value is crack gauge which install beforehand.

Case Study on the Explosive Demolition of DCRE Incheon Plant (디씨알이 인천공장 발파해체 시공사례)

  • Kim, Sang-Min;Park, Keun-Sun;Kim, Ho-Jun;Kim, Hee-Do;Kim, Gab-Soo;An, Kyung-Ro
    • Explosives and Blasting
    • /
    • v.37 no.1
    • /
    • pp.34-47
    • /
    • 2019
  • This case study is concerned with the project of the explosive demolition for the DCRE Incheon plant located in Hakik district in Incheon city. The building was severely aging due to the high temperature and sea winds of hundreds of degrees emitted by chimney-shaped steel structures inside the building. Due to this, the concrete of the column and the beam fell off and rusted rebar were exposed, and some of the slabs were severely damaged, making it difficult for workers to access the structure. Therefore, it is not possible to apply a mechanical demolition method in which heavy equipment enters the interior of the building, and an explosive demolition method was applied to allow the building to be demolished without dismantling the internal facilities of the building. The order of blasting proceeded in the order of (1) building ${\rightarrow}$ (2) chimney 2 ${\rightarrow}$ (3) chimney 1. A total of 406 electronic detonators (Unitronic 600) was used to sequentially initiate the explosives installed at appropriate in building and chimneys.

지능형 건물(IB:Intelligent Building)의 계획과 운영관리⑦

  • Lee, Sun-Hyeong;Im, Sang-Chae
    • Electric Engineers Magazine
    • /
    • v.244 no.12
    • /
    • pp.21-28
    • /
    • 2002
  • 건축분야에서 자원, 에너지 절약을 고려할 때 건설공사, 건물해체, 철거에 따른 에너지소비문제도 중요하지만, 계획단계와 건물의 유지, 운용 단계에서도 에너지절약 대책 또한 매우 중요하다. 건물의 방의 배치, 레이아웃, 디자인이라는 감각적인 성능 평가 뿐만 아니라 에너지, 자원절약의 관점에서도 평가도 중요하며 그 때문에 매력있는 에너지절약 시책과 실적 데이터의 정비가 필요하다.

  • PDF