• Title/Summary/Keyword: 거푸집 공사

Search Result 152, Processing Time 0.034 seconds

Development of an Activity-Based Conceptual Cost Estimating Model for P.S.CBox Girder Bridge (대표공종 기반의 P.S.C 박스 거더교 개략공사비 산정모델 개발 -상부공사 중심으로-)

  • Cho, Ji-Hoon;Kim, Sang-Bum
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.197-201
    • /
    • 2008
  • Conceptual cost estimates for domestic highway projects have generally been conducted using governmental unit-price references. Inaccuracies in governmental unit-price data has repeatedly addressed in the Korean construction industry which often lead to poor decision making and cost management practices. Thus, needs for developing a better way of conceptual cost estimating has been widely recognized. This research is considered as the first step in developing such model using real-world cost data based on actual construction activities. The data analyzed in this paper includes 41 P.S.C (Prestressed Concrete) Box bridges which broke into 4 categories based on construction methods such as I.L.M(Incremental Launching Method), M.S.S(Movable Scaffolding System), F.S.M(Full Staging Method), and F.C.M(Free Cantilever Method). Actual design documents; including actual cost estimating documents, drawings and specifications were carefully reviewed to effectively break down cost structures for PSC girder bridges. Among more than 40 cost categories for each P.S.C girder bridge type, 7 of them were identified which accounted for more than 95% of total construction cost (ILM: 99.47%, MSS: 99.22%, FSM: 98.18%, and FCM: 98.12%). In order to validate the clustering of cost categories, the variation of each cost category has been investigated which resulted in between -1.16 % and 0.59%.

  • PDF

Analysis of Factors for Improvement of Economic Feasibility of Construction Cost to Spread Application of OSC Construction Method for Apartment Housing (공동주택 OSC공법 적용 확산을 위한 공사비 분야 경제성 개선 요인 분석 - PC 부재 설계, 제작, 운송, 시공을 중심으로 -)

  • Yun, WonGun;Shin, Eun-Young;Kang, Tai-Kyung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.6
    • /
    • pp.55-63
    • /
    • 2021
  • Recently, as the problem of the traditional on-site labor-intensive construction production method has been raised due to changes in construction work labor and site conditions, the OSC method is gradually spreading as an alternative to this. Even in apartment houses, the application of the PC method is expanding centered on the underground parking lot, but the high cost structure is a problem compared to the conventional formwork method. In this study, factors affecting the calculation of construction cost in the economic evaluation, which are the core of determining the construction method for apartment buildings, are derived through domestic and foreign literature review and expert advice, the importance was analyzed through an opinion survey targeting industry experts. The measures to reduce construction cost were mainly derived from the improvement of the design and manufacturing process. It is expected that the factors affecting the construction cost and improvement measures of the PC method derived from this study will serve as a direction for technology development to spread the application of the PC method for apartment houses in the future.

A Study on the Structural Behavior of the Composite Slab with New-Shaped Deckplate (신형상 데크플레이트를 이용한 합성슬라브의 구조적인 거동에 대한 연구)

  • Huh, Choong;Moon, Tae Sup
    • Journal of Korean Society of Steel Construction
    • /
    • v.9 no.3 s.32
    • /
    • pp.341-350
    • /
    • 1997
  • The objective of this study is to investigate the structural behavior of the composite slabs with the new metal deckplate. The new deckplate can be used as structural member with topping concrete. So several experiments of this structural test and the fire resistance test were done. From this experiments. slabs with new metal deckpklate were verified as composite slabs. In this paper, this verifications were compared with the international design methods. For experiment. 49 specimens were made. the main parameters are deckplate thickness (1.2mm. 1.6mm) depth of topping concrete(85mm. 90mm). support condition(simple, 2-span), shear reinforcment(studs), span(2.7m, 3.0m, 3.3m. 3.6m. 3.9m) and shear span(L/3, L/4, L/7). We analyzed the structural behavior of composite slab throughout the moment-curvature relationship which is obtained with the program using the computer language. Turbo C. From this development for slab system, the reinforced concrete or steel structure building may be easy, economical for construction, And informations about the structural behavior of composite slabs will be utilized to established korea standard.

  • PDF

Compressive Strength Development Properties of Concrete using Sodium based Accelerating Admixtures (나트륨계 기반 조강형 혼화제를 사용한 콘크리트의 압축강도발현 특성)

  • Song, Yeong-Chan;Lee, Tae-Gyu;Kim, Yong-Ro;Seo, Chi-Ho
    • Journal of the Korea Institute of Building Construction
    • /
    • v.18 no.3
    • /
    • pp.259-266
    • /
    • 2018
  • In recent years, the early strength of concrete is important in order to shorten the time of form removal at the construction site. The purpose of this study is to analyze the moment of form removal as investigating the amount of cement contents and the physical properties and strength of the concrete according to types of admixture in the curing temperature of $10^{\circ}C$ for concrete of 21 to 27 MPa. As a result, it was found that compressive strength of concrete could not be secured 5 MPa by 36 hours even if the amount of cement contents were increased to $360kg/m^3$ with plain admixture. Also, it was confirmed that the strength improvement rate was excellent when using the accelerating agent with polycarboxylic acid type, and the moment of compressive strength of 5 MPa was estimated at 30 hours.

A Study on the Development of an Automated Freeform Fabrication System and Construction Materials (자동화 적층 시공 시스템 및 재료 개발에 관한 연구)

  • Jeon, Kwang Hyun;Park, Min-Beom;Kang, Min-Kyung;Kim, Jung-Hoon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.4
    • /
    • pp.1665-1673
    • /
    • 2013
  • Recently, the interest and demand on free formed structure providing aesthetic value as well as functionality has been increasing. Formwork has numerous advantages such as high strength, convenience, accuracy and good quality of surface roughness. Nevertheless, it increases construction cost and period to build complex shapes. For these purpose, deposition construction systems such as Contour Crafting and Concrete Printing have been developed with active collaboration between university and industry by applying the rapid prototyping technology to the construction industry in USA and England. Since there has been no related research in Korea, the possibility of spin-off technology and its fusion cannot be expected. In this paper, design elements including mechanical system and control system related to automatic deposition construction system prototype for constructing a free curved structure without mold are described. As for an appropriate material for the system, fiber reinforced mortar was selected by experiments on compressive strength, fluidity, viscosity and setting time. By performing transfer and extrusion experiments, the possibility of the development of deposition construction system was demonstrated. Based on this research results, it is required to keep the automatic deposition construction system improve and extend it into the new application area in construction industry.

Conceptual Cost Estimate Method of Public Office Building Structural Frame Work by Regression Analysis (회귀분석을 통한 공공청사 골조 공사의 개산견적 방안)

  • Jo, Yeong-Ho;Choi, Hyun-Jun;Kim, Jung-Won;Yun, Seok-Heon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.20 no.2
    • /
    • pp.147-153
    • /
    • 2020
  • It is important to estimate the optimal construction cost at the early stage of the project. In this regard, conceptual cost estimate is an important factor for estimate optimal construction cost. However, domestic conceptual cost estimate are only used as cost per unit area according to the building type, and it's accuracy is not high. Hence, the purpose of this study is to calculate the approximate quantity and cost for reinforcing bars, concrete, and formwork by presenting a regression formula based on the total floor area of the common work items in the frame work. In order to verify the accuracy and validity of the regression formula presented in this study, a comparative analysis was performed by applying the regression formula and the traditional approximate quantity take-off method to real cases. As a result, the estimated error rate of the traditional method was -102~+55%, and exceeded the estimated conceptual cost estimate accuracy range of -50~+100% suggested by AACE(American Association of Cost Engineering). On the other hand, the error rate of the regression formula method presented in this study was -6.4~+11.62%. This can be used not only for conceptual cost estimate range of accuracy, but also for detailed estimates. However, it is necessary to analyze the factors that affect the unit price as well as quantity in order to calculate the appropriate cost.

Analysis of Seasonal Importance of Construction Hazards Using Text Mining (텍스트마이닝을 이용한 건설공사 위험요소의 계절별 중요도 분석)

  • Park, Kichang;Kim, Hyoungkwan
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.41 no.3
    • /
    • pp.305-316
    • /
    • 2021
  • Construction accidents occur due to a number of reasons-worker carelessness, non-adoption of safety equipment, and failure to comply with safety rules are some examples. Because much construction work is done outdoors, weather conditions can also be a factor in accidents. Past construction accident data are useful for accident prevention, but since construction accident data are often in a text format consisting of natural language, extracting construction hazards from construction accident data can take a lot of time and that entails extra cost. Therefore, in this study, we extracted construction hazards from 2,026 domestic construction accident reports using text mining and performed a seasonal analysis of construction hazards through frequency analysis and centrality analysis. Of the 254 construction hazards defined by Korea's Ministry of Land, Infrastructure, and Transport, we extracted 51 risk factors from the construction accident data. The results showed that a significant hazard was "Formwork" in spring and autumn, "Scaffold" in summer, and "Crane" in winter. The proposed method would enable construction safety managers to prepare better safety measures against outdoor construction accidents according to weather, season, and climate.

Experimental Study on the Compressive Strength of yLRC Composite Columns (yLRC 합성기둥의 압축강도에 관한 실험 연구)

  • Kim, Hyung Geun;Kim, Myeong Han;Cho, Nam Gyu;Kim, Sang Seup;Kim, Sang Dae
    • Journal of Korean Society of Steel Construction
    • /
    • v.21 no.5
    • /
    • pp.545-552
    • /
    • 2009
  • An experimental study was performed on the yLRC composite column. Its external surface was manufactured with y-shape steel sheets and L-shape steel angles, and concrete was poured inside in the field. This composite column has improved the section capacity due to the composite action of steel and concrete, and provides good efficiency in reducing the terms of construction works because of its abridged formworks. The stub column specimens (three small and three large specimens) were tested through concentrical axial loading, and the effect of the width-to-thickness ratio of the steel angle on the column axial strength was examined. The axial strength and behavior of the composite columns were analyzed, and a formula for predicting the axial load capacity was proposed.

Effect of Alkali Activators on Early Compressive Strength of Blast-Furnace Slag Mortar (고로슬래그 모르타르의 초기 강도에 대한 알칼리자극제의 영향)

  • Moon, Han-Young;Shin, Dong-Gu
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.9 no.3
    • /
    • pp.120-128
    • /
    • 2005
  • In the construction industry, due to the cost rise of raw material for concrete, we have looked into recycling by-products which came from foundry. When using the Ground Granulated Blast-Furnace Slag(SG), it is good for enhancing the qualities of concrete such as reducing hydration heat, increasing fluidity, long-term strength and durability, but it has some problems : construction time is increased or the rotation rate of form is decreased due to low development of early strength. In this study, therefore, to enhance the early strength of SG mortar, we used some alkali activators(KOH, NaOH, $Na_2CO_3$, $Na_2SO_4$, water glass, $Ca(OH)_2$, alum. This paper deals with reacted products, setting time, heat evolution rate, flow and the strength development of SG cement mortar activated by alkali activators. From the results, if alkali activators were selected and added properly, SG is good for using as the materials of mortar and concrete.

Mold Woodworking Tools and musculoskeletal disorders of the correlation analysis (형틀 목공이 사용하는 작업공구와 근골격계 질환의 상관관계 분석)

  • Kwark, Dong-Jin;Park, Jung-Lo;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.11a
    • /
    • pp.5-7
    • /
    • 2012
  • Repeated using carpentry workers work at working tools because of occupational low back pain, such as musculoskeletal disorders, occupational diseases are on the rise. For this purpose, through the analysis of musculoskeletal disorders and work tools and studies are underway to improve the working conditions of the workers. However, existing previous studies may not reflect the working tools used for carpentry worker dies when working at a construction site that Therefore, in this study, the work in the form of construction, one of the jobs of worker dies classified according to the working tools of musculoskeletal disorders correlated to analyze. The results of this study are as follows. working tools of a total of seven different dies used in the installation process. Musculoskeletal disorders, waist / drill such correlation was very strong. Also showed that a total of three of the tools used in the formwork dismantling cutter musculoskeletal disorders of the arm / elbow and a very strong correlation.

  • PDF