Construction Cost Estimate Modeling of Roundabout at Preliminary Design Stage in Jeju (제주도 내 회전교차로의 초기공사비 예측모델 개발)

  • An, Jin-Hong;Lee, Dong Wook
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.34 no.4
    • /
    • pp.1299-1306
    • /
    • 2014
  • Recently, there are many roundabouts installation works which are ordered to provide convenient transportation to road users as well as to eliminate traffic accidents and traffic delays. This study propose an approximate construction cost estimation model for early stages of roundabout construction. The model is designed considering the conditions of the early stage roundabout construction sites in Jeju. The regression equation of approximate construction cost was derived through regression analysis of 25 design data of roundabout construction in Jeju, and it was analyzed to have a high prediction accuracy. Finally, results verifies high prediction accuracy of the derived regression equation. Difference between the estimation cost and the design cost was only 2.3%, 3.7%, and 5.8% that verifies the high accuracy of the proposed approximate construction cost estimation model.

Development of an Approximate Cost Estimating Framework for River Facility Construction at Planning Stage (하천시설물 공사의 기획단계 개략공사비 산정체계 개발)

  • Shin, Jung Min;Woo, Sungkwon;Lee, Si Wook;Kim, Ok Ki
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.3D
    • /
    • pp.371-381
    • /
    • 2008
  • The systematic methodology for estimating construction cost approximately at planning and pre-design phase of a river facility construction project has not yet been established because of its unique characteristics including its relatively small project size in terms of cost. This research suggests a 4-level cost information structure and identifies critical factors affecting construction cost as a result of thorough analysis of accumulated historical cost data of river facility construction projects. Also, this research presents the framework of the approximate cost estimating methodology for river facility construction project a planning stage.

Preliminary Construction Cost Prediction Model Based on Module for Modernized Hanok (초기 기획단계의 신한옥 공사비 예측 모델 - 모듈(칸) 기반의 목공사 개략 물량 산출 중심으로 -)

  • Kang, Seunghee;Jung, Youngsoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.3
    • /
    • pp.48-56
    • /
    • 2020
  • Prediction of construction cost in the planning stage that provides basic information for feasibility study, budgeting, and planning is an important factor for successful project execution. In this study, a prediction model was developed for the purpose of improving the accuracy of estimating the construction cost of Hanok in the planning stage. The cost of this model is estimated by two methods. First, the cost of wood work, which accounts for the largest portion of the total construction cost, is estimated by calculating the approximate quantity under various conditions (structure type, roof type, plane type, etc.). Second, the cost of the rest work sections except the wood work is estimated by using the unit cost model. The predictive model was verified by two case projects, and the error rate of total construction cost was -4%(case 1) and -6%(case 2). These results showed an error rate in the range that can be applied to practice in the planning stage.

Quantity-based Early Cost Estimation Model for Road Construction Projects (대표물량 기반의 도로공사 설계단계의 개략공사비 예측모델)

  • Kim, Du Yon;Kim, Byungil;Yeo, Donghoon;Han, Seung Heon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.29 no.3D
    • /
    • pp.373-379
    • /
    • 2009
  • Cost estimation in the early phase enables government to plan public budgeting more efficiently by providing information about construction cost. However, cost estimation in the early phase is difficult to predict because only a little information can be utilized. The cost estimation method now being used by the government is calculated by length of the road multiplied by unit cost per length and shows high error rate because it cannot reflect the unique characteristics of each project. As the project is being proceeded, level of available information also changed. So, reflecting available information of a project is important. This paper divided early phase into two parts : planning phase and early design phase, and developed cost estimation model considering level of available information of each phase. Total 143 cases are utilized to find influencing variables and develop cost estimation model and model validation is done by adopting required accuracy level. This cost estimation model reflecting level of available information can be applied to public budgeting, feasibility test, and comparison between routes.

BIM System Development for Conceptual Design and Pre-Feasibility Study of Cable-Stayed Bridge (BIM 기반 사장교의 개념설계 및 예가분석 시스템 개발)

  • Chun, Kyoung-Sik;Park, Won-Tae
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.10
    • /
    • pp.7204-7210
    • /
    • 2015
  • This paper has developed the system for supporting the approximate construction cost and the quantity estimation based on 3D model information in the pre-project planning phase of 3-span continuous cable-bridge with 2-pylons. First of all, we'd analyzed the design information (structural design report, blueprint and quantity) of the existing cable-stayed bridges and derived the design variables of cable-stayed bridges. We developed the BIM wizard that generates a cable-stayed bridge model parametrically based on derived design variables. The principle material quantities of cable-stayed bridge are calculated directly from 3-dimensional bridge model built by using the BIM wizard. Then, we can estimate the construction cost in relation to its quantities and unit cost of cable-stayed bridge. In a result, we have established the system that the construction cost can be estimated more specific than the conventional method (construction estimates per meter or square meter). We hereby will be able to review various alternatives as soon as possible in bidding process.

Analysis of the Factors Influencing the Demolition Costs (건축물 해체공사비 변동 영향요인 분석)

  • Shin, Dong-Wook;Cho, Kyu-Man;Lee, Ung-Kyun;Kim, Tae-Hoon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.18 no.5
    • /
    • pp.499-506
    • /
    • 2018
  • The number of demolition work is rapidly increasing because the middle- and high-rised buildings constructed over the rapid industrialization and urbanization have been deteriorated in social and structural aspects. However, theoretical approaches or studies related to the demolition cost prediction are still insufficient. Thus, this study derived and analyzed important factors affecting the fluctuation of the building demolition costs. 14 factors was derived through literature reviews and experts' interview, and the importance of each factor was analyzed to the each work(temporary work, structure demolition, and waste disposal) and the entire demolition work by using descriptive analysis. The survey results showed that the demolition costs was greatly influenced by environmental properties of the site. The results of this study can be used as a basis for estimating the approximate cost of the demolition work.

Development of a model for an equation for estimating construction costs based on the resource-based cost estimating system for TBM (TBM 공법의 자원기반 적산 방식에 의한 개산 공사비 예측 식 모델 개발)

  • Han, Seung-Hee;Park, Hong-Tae
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.14 no.3
    • /
    • pp.1474-1480
    • /
    • 2013
  • This study attempted to estimate construction costs in accordance with the resource-based cost estimation (unit cost price) system by diameter for TBM method, and analyzed the direct cost and the total cost. Based on such figures, this study performed a regression analysis and proposed a model for an equation for estimating construction costs. model for the resource-based cost estimation (unit cost price) system classified by diameter for TBM method proposed by this study can be effectively applied to business planning, preliminary investigation, feasibility study, construction cost estimations in the early design stages.

A Conceptual Investment Cost Estimation Using by Cost Indices for the Train Control Facility of High-speed Rail Project (원가지수를 이용한 고속철도 설비의 개략적 투자비 추정기법)

  • Lee, Young-Joo;Lee, Yong-Eok;Jang, Seong-Yong
    • Journal of the Korean Society for Railway
    • /
    • v.14 no.2
    • /
    • pp.194-202
    • /
    • 2011
  • Most of Orders of Magnitude estimate are based on historical data. This data is converted to the current price using by the cost index method mainly. This method, however, is rarely utilized or only for one-time use due to the lack of data and the complex escalation calculation method. This paper present a typical process on the conceptual investment cost estimation using by Cost Indexes based on the actual case for the Train Control facility of High-speed rail project. The result is expected to serve as both an easy way for Order of Magnitude estimate and a standard guideline for computerized modeling.

Development of an Approximate Cost Estimating Model for Bridge Construction Project using CBR Method (사례기반추론 기법을 이용한 교량 공사비 추론 모형 구축)

  • Kim, Min-Ji;Moon, Hyoun-Seok;Kang, Leen-Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.3
    • /
    • pp.42-52
    • /
    • 2013
  • The aim of this study is to present a prediction model of construction cost for a bridge that has a high reliability using historical data from the planning phase based on a CBR (Case-Based Reasoning) method in order to overcome limitations of existing construction cost prediction methods, which is linearly estimated. To do this, a reasoning model of bridge construction cost by a spreadsheet template was suggested using complexly both CBR and GA (Genetic Algorithm). Besides, this study performed a case study to verify the suggested cost reasoning model for bridge construction projects. Measuring efficiency for a result of the case study was 8.69% on average. Since accuracy of the suggested prediction cost is relatively high compared to the other analysis methods for a prediction of construction cost, reliability of the suggested model was secured. In the case that information for detailed specifications of each bridge type in an initial design phase is difficult to be collected, the suggested model is able to predict the bridge construction cost within the minimized measuring efficiency with only the representative specifications for bridges as an improved correction method. Therefore, it is expected that the model will be used to estimate a reasonable construction cost for a bridge project.

Tunnel Cost Estimating Model Based on Standard Section and Cost Variance Index (I) - Analysis Of Critical Cost Factors - (표준단면을 이용한 터널 공사비 예측모델 개발 (I) - 공사비 영향요인 분석 -)

  • Cho, Jeongyeon;Kim, Kyong Ju;Kim, Kyoungmin;Kim, Sang Kwi
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.5D
    • /
    • pp.665-675
    • /
    • 2008
  • The objective of this paper is to provide an approximate cost estimating model for tunnel that can be utilized both in quick construction cost estimating for design alternatives, and in evaluating efficiently the cost effects according to the environmental changes during design and construction stage. To meet this requirement, this study analyzes critical cost factors influencing tunnel construction costs. The cost factors include 7 elements such as rock drilling method, advancing method, type of detonator, loader capacity, unit weight and soil volume change factor, length of tunnel. This paper investigates the cost variance according to the change of the cost factors. The result is expected to be used in formulating approximate tunnel cost estimating model.