• Title/Summary/Keyword: 감리인

Search Result 645, Processing Time 0.039 seconds

A Study on Schemes to Case Analysis and Cope with Online Game Crimes (온라인 게임범죄의 사례분석과 대응방안)

  • Yoo Yong-Bong
    • The Journal of the Korea Contents Association
    • /
    • v.6 no.9
    • /
    • pp.85-97
    • /
    • 2006
  • Schemes to case analysis and cope with on-line game crimes net supervision system, a real name confirmation process, and a self-examination system to check by themselves if they are addicted to on-line games with a view to prevent the addiction. In addition, this study found that general precuations should comprise measures to change the awareness of the users of the internet and to establish their ethical senses because most on-line garners are not aware that their actions are a crime and believe their crimes are not disclosed to the outsiders.

  • PDF

A Review of the Improvement of Construction Management (CM) System and the CM Policy for the Public Construction Works (공공사업의 CM제도 개선 및 정책방향)

  • Jang Kie-Chang
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.207-212
    • /
    • 2002
  • The Construction Management(CM) System in Korea is systematized both in name and reality by being prescribed in Construction Industry Act('97) and Construction Management Act('01) through various discussions considering reformation of construction industry structure and enhancement of construction technology competitiveness. Specially in the public construction works, CM Pilot Project is promoted by central government for the activation of CM system introduced for efficiency of public construction project. The promotion of Pilot Project is not only the settlement and activation of CM system but also the process to embody and diversify the CM system. Now we should develop various CM application type such as Owner type, PM type and type for private capital project in doing so. And with this efforts, we could expect that CM system should play an important role to enhance the efficiency of public construction works and should affect private construction sector.

  • PDF

Data Model for Document Exchange of Construction Projects (건설 프로젝트 문서교환을 위한 데이터모델)

  • An Sun-Ju;Son Bo-Sik;Lee Hyun-Soo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.569-572
    • /
    • 2003
  • A construction process involves many designers, engineers, contractors, consulting engineers and government officials. Thus, it is essential to promote collaboration among such participants through of effective document exchange. There have been efforts to Improve efficiency of document exchange through Web. Also XML/EDI is recommended by its method. So the purpose of the research was to establish the data model for document information management in document exchange for construction participants using web-based XML/EDI. This research proposed a method of modeling document information for systemic management of document information that exchanged by XML/EDI in central and explained concept of application document information that stored in database. This research classified construction document according to its information relation.

  • PDF

양송시기(兩宋時期)의 의정사(醫政史)에 관한 연구

  • Park, Hyeon-Guk;Kim, Jae-Cheol;Kim, Gi-Uk
    • Journal of Korean Medical classics
    • /
    • v.19 no.3
    • /
    • pp.65-99
    • /
    • 2006
  • 송대통치자희환의약병중견의학적발전. 축소궁정의료궤구(縮小宮廷醫療机構), 각확대평민의료여의약유관적자선궤구이개선백성의료조건적정책방향흔진보적. 장의적엄범지수집, 교정(校訂), 편찬(編纂), 반포이수존의학문헌(頒布以收存醫學文獻), 병차위의학적전파화보급작출봉헌. ${\ulcorner}$내경(內經)${\lrcorner}$, ${\ulcorner}$상한(傷寒)${\lrcorner}$ 등기초이론적연구방면상야운용(等基礎理論的硏究方面上也運用), 금원시기성위료학술쟁론적기출, 저시송대의정상최성공적정책(這是宋代醫政上最成功的政策). 유정부엄구약물, 수정본초병건립제약공창화약점(修訂本草幷建立製藥工廠和約店), 전매약물(專賣藥物), 개혁제형, 이발전'성약'(以發展'成葯'), 통일용약적규범등(統一用藥的范等), 저양적조시향약물적발전화의약적민중화흔대적영향. 의약교육방면상(醫藥敎育方面上), 재태의국화국자감리건립적'의학'교육제도유흔다건공, 궤구적예속, 전과(專科) 적분과(的分科), 고시제도(考試制度), 학교관리등도적료신경험(學校管理等都積了新驗), 의학상이'삼사법'(醫學上以'三舍法') '공액'위려의학교육적조시('貢額'爲勵醫學敎育的措施), 저치득긍정적(這値得肯定的). 송대의학교육상야유과착(宋代醫學敎育上也有過錯). 비여(譬如), 인제도적존폐이유실교육적연속성(因制度的存廢而有失敎育的連續性), 이방애의약교육경금적척축화계승(以妨碍醫藥敎育經驗的積蓄和繼承), 불단결핍잠력, 상실동력이차몰건립전문약학교육(喪失動力而且沒建立專門藥學敎育). 대부분수요의정궤구적건립(大部分需要醫政机構的建立). 단시유례속관사흔옹제적문제, 인위피상부소속궤관소견체소이불구통일적지도화협조, 최고의정궤구'한임의관원'야몰유통제의약궤구적권한(最高醫政机構'翰林醫官院'也沒有統制醫藥机構的權限), 직책중복(職責重複), 인원과잉(人員過剩), 의관원본신이야유흔다과잉리인원, 부구엄격적관리제도. 인비송대의관관리방면상강락료총효율(因比宋代醫官管理方面上降落了總效率).

  • PDF

A Process Model of Eco-friendly Demolition Work for Wall Type Aged Housing Remodeling (친환경 리모델링 철거공사 프로세스 모델 (벽식구조 노후 공동주택을 대상으로))

  • Hwang, Young-Gyu;Kim, Ki-Hyun;Kim, Kyung-Ra;Han, Ju-Yeoun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.6
    • /
    • pp.204-215
    • /
    • 2008
  • Demolition work is a precedence activity that is performed earlier than other remodeling activities. And demolition work is one of the critical path activities. So, demolition work is needed for systematic plan and management. However, contractors of the remodeling project established a rough plan and did not consider recycling wastes, safety of workers and structural stable of building. To improve this problem, a eco-friend process model of remodeling project is needed to be established. The process model is composed of five phases; 1) survey and analysis of general condition of demolition work, 2) prepare documents of demolition work 3) establishing demolition work plan, 4) demolition and inspection, 5) post-demolition management. Especially, demolition documents are based on establishing WBS, selecting the equipment and method, waste management and structure reinforcement. A process model of eco-friend demolition work is developed by using IDEF0 method.

Identifying the perception on the introducing of Construction Management(CM) in the civil infrastructure project delivery system (사회간접자본 프로젝트의 CM제도 활성화방안에 대한 인식분석 연구)

  • Jang, Won-Suk;Lee, Sang-Uk;Lee, Dong-Eun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.1
    • /
    • pp.91-100
    • /
    • 2013
  • Current environment in civil and construction industry has changed to actively adopt construction management (CM) in various areas. While it is found that exemplary CM projects have been carried out in many civil engineering sectors, concrete system framework has not been suggested due to ambiguous boundary between CM and supervision system, unclear perception of CM's role, and inexperienced organization and regime. This paper investigated the challenges faced in civil and construction industry, and analyzed the strategy that could improve the current immature CM system by conducting questionnaire survey from experts in various construction sectors. The results could provide valuable information that can involve diverse opinions and view points in project participants.

A study on Deployment of the Optimized WBS and Effective Small and Medium Enterprise Informatization System using Standardized PSDM (표준화된 PSDM을 사용한 최적의 WBS 및 효과적인 중소기업 정보화 시스템 구축에 관한 연구)

  • Yoon, KyungBae;Kwon, HeeChoul
    • The Journal of the Institute of Internet, Broadcasting and Communication
    • /
    • v.14 no.6
    • /
    • pp.199-205
    • /
    • 2014
  • We would like to study and develop the optimized WBS(Work Breakdown Structure) considering project's range, schedule, cost and human resources management with defining phased work in main task and preceding and escorting relationships for effective small and medium enterprises' informatization through standardized PSDM(Production System Development Methodology). For more systemic and effective system built-up, it introduces production information with WBS study which is appropriate for the small and medium enterprises with setting up management items for enhancing system's reliability, quality, productivity, smooth communication among the participated enterprises such as the small and medium enterprises, IT enterprises, and supervision enterprises, and operational support including maintenance of the built system. This study is purpose of helping a lot of the small and medium enterprises and IT enterprises to build up the systems more effective and reliable within planned schedule using the standardized methodology.

Introduction to CM Experience from Incheon International Airport (IIA) Construction Project (인천국제공항건설 사업관리 경험)

  • Park, Dae-Won
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.20-25
    • /
    • 2004
  • On July $18^{th}$, 2003, Incheon International Airport Corporation(lIAC) signed the Construction Management Service Contract with KIDS consortium (composed of Kun-Won Eng., ITM Corp, Do-Hwa Eng, Space Croup) for the $2^{nd}$ phase construction protect consists of landfill, $\#3$ runway, remote Concourse, IAT, BHS, cargo terminal, etc scheduled to be finished by the end of 2008. KIDS dispatched qualified engineers to the Construction Management Division of IIAC for providing technical assistance to IIAC members to pursue project goals in tulle. within budget with appropriate quality level to build one of leading hul] airports for the Northeast Asia legion in the $21^{st}$ century. The work scope covers upgrading various project procedures and related computer programs, cost and schedule control, design supervision for building design including support systerns such as HVAC, fire protection, elevators and escalators, boarding bridges, electrical and communication systems, and technical support for IAT/BHS, QA/QC, field test and inspection, start-up and commissioning, etc. The purpose of this paper is to introduce the major activities of the Construction Management Services performing at the IIA project for your reference.

  • PDF

The Study of Quality Control in Engineering on the Turnkey Project(Focus on Change Orders at the Construction Phase) (턴키공사 설계품질관리에 관한 연구(시공단계의 설계변경을 중심으로))

  • Lee Yong-Jin;Lee Teck-Wn;Kim Jin-Young;Han Choong-Hee;Kim Sun-Kuk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.2 no.3 s.7
    • /
    • pp.58-66
    • /
    • 2001
  • Turnkey project, also called Design-Build project, has been expanding and diversifying its business into the Korean market. However, it has been experiencing numerous difficulties due to a large number of change orders on the public turnkey project. Change order during the construction phase impact on time deliveries, budget and quality on a turnkey project. In preparation for this, the government has to improve the awarding procedure and general conditions for turnkey projects. Contractors should also cooperate with their co-working partners and establish a standardized procedure, which provides change order control for efficient implementation on the construction site.

  • PDF

A Study on the Case of Application of a Process at the Construction Stage of the Color Planning at the Construction Site of Muju Taekwondo Park (무주 태권도원 현장 색채계획 시공단계 프로세스 적용사례연구)

  • Yun, Gye-Yeong
    • Korean Institute of Interior Design Journal
    • /
    • v.22 no.5
    • /
    • pp.320-327
    • /
    • 2013
  • In order to maintain and protect professionalism in color planning, the present study examined the process at the time of realization of color through color inspection and supervision in the actual construction site and suggested plans for improvement. Reflecting the characteristics that the governing body of the construction site is not a private person but an organization, the present study aims to provide institutional measures so that the supervisor of color construction at the actual site of construction can propose concerns related to proper construction at the right time, and the matters cannot be decided from the perspective of a layman. The institutional measures are proposed through the case of application of a process at the construction stage of the color planning at the construction site of Muju Taekwondo Park. First, the process clarified where the responsibility lies by specifying special conditions concerning color inspection on the field guide and color contract. Second, the sample for building materials was selected after obtaining it from a company capable of supply and is appropriate for the planned unit cost so that it could play an important role in realizing colors at the stage of basic design. Third, the process of construction was ensured not by temporary selection of colors but by continuous approval of colors in consideration of the conditions of construction site through letter of approval of color at each stage and point of time. Fourth, coordination of various color elements of other fields including landscape, interior, and electricity ensured construction of the whole structure in one color concept. Fifth, color inspection through the mock up of the site will minimize erroneous construction and reconstruction and prevent decrease in productivity. Sixth, this study also suggested more comfortable and positive color environment through evaluation by experts and users. The researcher of this study expects that color experts actively participate in the stage of construction to contribute to improvement of the color environment.