• Title/Summary/Keyword: 간섭체크

Search Result 19, Processing Time 0.028 seconds

Integrity Evaluation for 3D Cracked Structures(I) (3차원 균열을 갖는 구조물에 대한 건전성 평가(I))

  • Lee, Joon-Seong
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.13 no.8
    • /
    • pp.3295-3300
    • /
    • 2012
  • Three Dimensional finite element method (FEM) was used to obtain the stress intensity factor for subsurface cracks and surface cracks existing in inhomogeneous materials. A geometry model, i.e. a solid containing one or several 3D cracks is defined. Several distributions of local node density are chosen, and then automatically superposed on one another over the geometry model. Nodes are generated by the bubble packing, and ten-noded quadratic tetrahedral solid elements are generated by the Delaunay triangulation techniques. To examine accuracy and efficiency of the present system, the stress intensity factor for a semi-elliptical surface crack in a plate subjected to uniform tension is calculated, and compared with Raju-Newman's solutions. Then the system is applied to analyze interaction effects of two dissimilar semi-elliptical cracks in a plate subjected to uniform tension.

A Proposal of BIM Work Process to Support Construct-ability Analysis from Practitioners Viewpoint (현장실무자 관점에서의 시공성 검토 지원을 위한 BIM 업무프로세스 제안)

  • Kim, Dae-Sung;Choi, Hye-Mi;Kim, Ju-Hyung
    • Journal of the Korea Institute of Building Construction
    • /
    • v.14 no.6
    • /
    • pp.561-569
    • /
    • 2014
  • In construction site, BIM is used in part of construct-ability review and design mistake checking. However, in a current domestic construction site, except public order project, most of work in private order project has been processing based on 2D work. As an expert resists to certain point in introduction of new technique, it may be shown in the introduction of BIM. For this, We need to analysis construct-ability of introducing BIM, work field of introducing and operational capability about present domestic construction engineers. Therefore, this study solves the problem of existing construct-ability analysis, and it visualizes the various information and objects for an effective job performance. Furthermore, construct-ability analysis by BIM that can use an intergrated management is theoretically examined and practical field-application priority among conclusions is proposed through a survey targeting on the hand-on worker. Therefore, this study suggests a factor supplying for a business-centric introduction plan and support condition.

A Study on the Establishment of Design and Construction Process Standardization through Building BIM Application Case (건축물 BIM 적용사례를 통한 설계 및 시공프로세스 표준화 수립에 대한 연구)

  • Jeong, Hee-woong
    • Journal of the Korea Institute of Building Construction
    • /
    • v.22 no.4
    • /
    • pp.347-358
    • /
    • 2022
  • In order to satisfy the extraction and use of information such as estimates and processes required in the design and construction stages of BIM, which is an expectation of overall construction operation for the design and construction stage of domestic buildings, it is insufficient to supply and apply mobile technologies or terminals. In this paper, standardization of BIM-based processes from the design stage to the construction stage is proposed as an efficient construction system method through mobile-based simulation and test-bed case analysis review. The current status and potential of BIM application were identified through theoretical review of BIM and case studies at home and abroad. In addition, the overall flow of the project and the direction of effective process construction were investigated through each process by 3D, 4D, and 5D execution stage and the role of each collaborator. 4D building process BIM simulation system using mobile was implemented by applying a visualization engine that simulates process information, object information connection module, and related object information. Therefore, it was possible to minimize the possibility of re-construction of the BIM design and construction process model through the visualization of 2D drawings based on the 3D model of the building and the review of errors and interferences in the drawings. In addition, in the implementation of simulation for each process of the construction process through mobile devices, it was possible to support construction progress and process management according to the optimal option selected by the user.

CAD/CAM System for 5-Axis Machining of Marine Propeller (프로펠러 5축 가공을 위한 CAD/CAM 시스템)

  • Jae-Woong Youn;Jong-Hwan Park
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.35 no.2
    • /
    • pp.51-62
    • /
    • 1998
  • In this paper, a CAD/CAM system for 5-axis machining of model propeller is introduced. This system has been developed under the environment of personal computer and Windows NT. In order to enhance the productivity, existing text-based design S/W was integrated into this graphic-based system. Non-Uniform Rational B-Spline method is used to represent the sculptured surface of propeller blades and hub using point data, and surface blending between blade and hub is realized in this system. For 5-axis machining of sculptured surface, tool/work collision and interference are checked and inverse kinematic analysis is performed to make NC data. In addition, tool and workpiece are animated on the PC monitor by preparing NC verification module. Finally, optimal cutting conditions are determined empirically and those cutting conditions are integrated into this S/W so that the whole process from design to machining can be done automatically.

  • PDF

A Study on the Development of the BIM Process for Improvement of the BIM Application Ability of the Construction Industry (건설산업의 BIM 적용능력 제고를 위한 BIM 프로세스 개발에 관한 연구)

  • Kim, Ji-Won;Lee, Min-Cheol;Choi, Jeong-Min;Ock, Jong-Ho
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.738-743
    • /
    • 2008
  • Recently BIM is utilized to improve productivity for Life Cycle Cost of construction projects. Therefore, the establishment of BIM process by each construction project is a necessary element. However, cases and the pertinent researches that BIM process by each project is established are still not enough in Korea. The study proposed construction of BIM process through how to set up BIM application, how to organize a BIM team, how to set up a family and modeling method in the early stage. To achieve the purpose, the study examined application ability of BIM process by carrying out basic setting and modeling work through pilot study model, examination of the amount of materials and information interchange with IFC. The study attempted making a foundation of domestic BIM guideline construction through the above examination.

  • PDF

Portable system module for wireless based on mountain climbing safety using 447 MHz band FSK (447MHz 대역 FSK방식을 이용한 무선 통신 기반 산행 안전을 위한 휴대 시스템)

  • Lim, Jae Don;Kim, Jung Jip;Jung, Hoekyung
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.23 no.11
    • /
    • pp.1428-1433
    • /
    • 2019
  • Interest in mountain accidents among the technical trends of disasters in Korea is increasing continuously. When accidents occur, the most common methods are location tracking and accident reporting using smartphones, and rescue activities are being carried out by using them. In this paper, we proposed an improvement of wireless safety system for mountain climbing safety using 447 FSK. Using the 447 MHz band transmitter / receiver, it accumulates position coordinates and data through position transmission and rescue signal transmission in case of anomalies. If a sender is out of the threshold of the set area range, a danger warning notification can be generated to quickly exit the danger zone. Provide services. In addition, it is considered that the health condition of the sender is continuously checked and the receiver is warned when the specified threshold is exceeded, so that it is possible to respond to the sender's disaster.

A Study on the Development of Diagnosing System of Defects on Surface of Inner Overlay Welding of Long Pipes using Liquid Penetrant Test (PT를 이용한 파이프내면 육성용접부 표면결함 진단시스템 개발에 관한 연구)

  • Lho, Tae-Jung
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.10
    • /
    • pp.121-127
    • /
    • 2018
  • A system for diagnosing surface defects of long and large pipe inner overlay welds, 1m in diameter and 6m in length, was developed using a Liquid Penetrant Test (PT). First, CATIA was used to model all major units and PT machines in 3-dimensions. They were used for structural strength analysis and strain analysis, and to check the motion interference phenomenon of each unit to produce two-dimensional production drawings. Structural strength analysis and deformation analysis using the ANSYS results in a maximum equivalent stress of 44.901 MPa, which is less than the yield tensile strength of SS400 (200 MPa), a material of the PT Machine. An examination of the performance of the developed equipment revealed a maximum travel speed of 7.2 m/min., maximum rotational speed of 9 rpm, repeatable position accuracy of 1.2 mm, and inspection speed of $1.65m^2/min$. The results of the automatic PT-inspection system developed to check for surface defects, such as cracks, porosity, and undercut, were in accordance with the method of ASME SEC. V&VIII. In addition, the results of corrosion testing of the overlay weld layer in accordance with the ferric chloride fitting test by the method of ASME G48-11 indicated that the weight loss was $0.3g/m^2$, and met the specifications. Furthermore, the chemical composition of the overlay welds was analyzed according to the method described in ASTM A375-14, and all components met the specifications.

A Qualitative Case Study on the Application of Spatial Design in the One-Person Housing Space by Combining BIM Design Technology (BIM 설계 기술을 융합한 1인 주거공간디자인 사례연구)

  • Kim, Ji Eun;Park, Eun Soo
    • Korea Science and Art Forum
    • /
    • v.37 no.2
    • /
    • pp.101-112
    • /
    • 2019
  • Regardless of the size, the role and meaning of the space required for human daily life are the same. Especially, as the spatial design is small and the size is small, the careful design and problem solving are needed to enable comfortable and convenient life even in a narrow space. The purpose of this study is to design a convergence model that utilizes the advantages of BIM, which can simulate actual design based on a new one-person housing space design plan optimized for one person. This study applied the BIM design technology to one-person housing 2D design, and the suitability examination and the space optimization design of the interior design were carried out. As a result of the study, utility of space improvement, consideration of housing environment, interference check, application of eco-friendly housing system, and MEP design item were derived. Therefore, BIM space design in interior space has been confirmed as a way to overcome limit and inefficiency of 2D design which is applied to actual space by various space design elements. Based on the results of this study, the One-person housing space model, which is applied to the study, is a pure creation designed based on various one-person housing of social and cultural peculiarities derived from previous research. This design example was applied to BIM technology to confirm the detailed and practical design possibility.

Quantity Estimation Method for High-Performance Insulated Wall Panels with Complex Details Using BIM Family Libraries (BIM의 패밀리 라이브러리를 이용한 복잡한 상세를 갖는 고단열 벽체 판넬의 물량 산출 방법)

  • Mun, Ju-Hyun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.24 no.4
    • /
    • pp.447-458
    • /
    • 2024
  • This study investigates the effectiveness of Building Information Modeling(BIM) software, specifically SketchUp and Revit, in reducing errors during quantity take-off(QTO) for complex building elements. While 3D modeling offers advantages, existing software may not fully account for manufacturing discrepancies, such as variations in concrete cover thickness and reinforcing bar radius. To address this limitation, this research proposes a BIM-based QTO method for high-insulation wall panels with intricate details. The method utilizes a BIM family library, focusing on key parameters like concrete cover thickness and inner radius of shear reinforcement. A case study compared the cross-sectional details of a wall panel modeled in Revit with the actual manufactured specimen. The analysis revealed a 12% reduction in modeled concrete cover thickness and a 1.27 times larger modeled inner radius of the shear bar compared to the real-world values. The proposed method incorporates these manufacturing variations into the Revit model of the high-insulation wall panel. Software like Navisworks facilitates the identification and correction of any material interferences arising from these adjustments. Furthermore, the method employs a unit wall concept(1m2) to account for the volume of various materials, including insulation and splice sleeves at joints. This allows for the identification of a similar existing family within the BIM library(e.g., "Double RC wall with embedded insulation") that reflects the actual material quantities used in the wall panel. By incorporating these manufacturing-induced variations, the proposed method offers a more accurate QTO process for complex high-insulation wall panels. The "Double RC wall with embedded insulation" family within the Revit program serves as a valuable tool for material quantity estimation in such scenarios.