• Title/Summary/Keyword: 가치흐름맵핑

Search Result 7, Processing Time 0.02 seconds

Feasibility Study in Construction Materials using Value Stream Analysis - Focused on Mechanical Works - (가치흐름분석을 통한 건설자재의 공장화생산 타당성 검토 - 건축공사의 기계설비 공사를 중심으로 -)

  • Seo Chang-Yong;Kim Chang-Duk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.389-392
    • /
    • 2002
  • Local Mechanical work is researched which spending unnecessary labors and time due to unnecessary material accumulation and fabricated on site. Accordingly, this study analyzes the work process of mechanical equipments by Lean Production principles. Value Stream Analysis(VSA) uncovers waste factor of the existing method and manufactory production method using Value Stream Mapping(VSM). In the results, this study presents improvement of the existing method problems and negative factors of manufactory production.

  • PDF

Waste Elimination in Construction Process using Value Stream Analysis - Focused on Waste Elimination of Re-bar Works (가치흐름 분석을 통한 건설프로세스의 낭비제거 방안)

  • Mun Jeong-Mun;Kim Chang-Duk;Park Dong-Sik
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.416-421
    • /
    • 2001
  • The domestic reinforcement concrete works have mainly worked the process of re-bar fabrication/assembly on site and re-bar works affected by structural safety, durability, and schedule with form work. Accordingly, This study analyzes the process of re-bar fabrication/assembly on site to apply lean production principles to construction Value Stream Analysis(VSA) is analyzed into value-adding activity and non-value-adding activity on construction process through value analysis and Value Stream Mapping(VSM). In the results, non-value-adding activity generates waste such as the activity steps, labors, equipments, materials, time, and so on. Additionally, push-driven production is investigated making low productivity from the overproduction and so on. To resolve the problems in the process, The purpose of this paper eliminates waste factor through maximizing the value-adding activity generating value added and minimizing non-value adding activity. Particularly, it makes flow production and pull-driven production through minimizing work-in-process(WIP ).

  • PDF

A Process Improvement in Building Constructions using Value Stream Analysis - Focused on slab works - (가치흐름 분석을 통한 건설공사의 공정개선방안 - 슬래브 공사를 중심으로 -)

  • Lee Hyung-Soo;Yoon You-Sang;Suh Sang-Wook;Jang Chan-Hee
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.527-530
    • /
    • 2002
  • The purpose of this study is to present an improvement of the form work process. The current slab form work has waste factor by unnecessary process and not complete integration with the finishing process. Therefore the study used value stream analysis methodology for effective improvement of slab form work process. The main contents of the study are as follows; 1) Understanding of non-value adding activities in existing slab form work process 2) Process integration by value stream mapping 3) Effect analysis of time-cost reduction. The study recommends that, as a future research, development of tool and technique for the non-value adding activities are eliminated in building construction.

  • PDF

A Study on the Improving Life-up and Procurement Work Flow for Effectiveness of Resources increase in the Building Construction (건설공사의 자원 효용성 증대를 위한 조달 및 양중 작업흐름 개선에 관한 연구)

  • Lee Hyung-Soo;Yoon You-Sang;Suh Sang-Wook
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.442-445
    • /
    • 2003
  • The purpose of this study is to present an improved lift-up & procurement work flow for effectiveness of resources increase in building construction. The current lift-up & procurement work flow has some waste factors; complicated information system, connection lack with process and decision-making delay. Therefore the study applied the value stream mapping methodology for improvement of current lift-up & procurement work flow. The main contents of the study are as follows; 1) A problem of current work flow were analyzed through current state mapping(CSM). 2) An improved work flow was suggested through future state mapping(FSM). 3) An improvement effect analysis of information system and lift-up planning The study recommends that continuous improvement of lift-up & procurement work flow and efficient management of information in building construction.

  • PDF

A Study on Development Framework of Lift-up and Procurement System for Effective Resource Management in the Building Construction (건설공사의 자재관리 효율화를 위한 조달 및 양중시스템 기반구축에 관한 연구)

  • Lee Hyung-Soo;Yoon You-Sang;Suh Sang-Wook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.1 s.17
    • /
    • pp.133-139
    • /
    • 2004
  • The purpose of this study is to present an improved lift-up &procurement work flow for effective resource utilization in building construction. The current lift-up &procurement work flow has some waste factors; complicated information system, connection lack with process and decision-making delay. Therefore the study applied the value stream mapping methodology for improvement of current lift-up &procurement work flow. The main contents of the study are as follows; 1) Problems of current work flow were analyzed through current state mapping(CSM). 2) An improved work flow was suggested through future state mapping(FSM). 3) An improvement effect analysis of information system and lift-up planning was investigated. The study recommends continuous improvement of lift-up &procurement work flow and efficient management of information in building construction as a future research.

The Improvement of Curtain Wall Design Process using Value Stream Mapping Tools (VSM기법을 활용한 커튼월 공사의 설계 프로세스 개선)

  • Kim, Chang-Duk;Lee, Sang-Hyuk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.5
    • /
    • pp.128-137
    • /
    • 2006
  • This paper is to develop curtain wall process life-cycle system in high-rise buildings in order to establish effective cooperation communication channels among the diverse constituents. This paper is to provide a base toward a curtain wall life-cycle management system to support decision making and the effective flow in light of information and materials. The four objectives of the research are 1) the analysis of the current curtain wall life-cycle process, 2) the analysis and development of the curtain wall design process As-Is model, and 3) the Muda analysis of the design process As-Is model and the suggestion of the improvements, 4) the development of curtain wall design To-Be model and comparative analysis of the improvement in terms of value streams. This research indicates the wastes decrease (or the values increase) from 6.7% up to 100% in different decision criteria through the improvement by the comparative analysis between the As-ls and To-Be curtain wall design process. This research suggests the potential improvement by VSM and a curtain wall life-cycle management system in curtain wall construction for diverse constituents be significant.

Development of the procurement system for Just-in-Time Building Construction (건설공사 적시생산(Just-ln-Time)을 위한 조달시스템 개발 - 콘크리트 타설 공사를 중심으로 -)

  • Shin Bong-Soo;Kim Chang-Duk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.6 s.22
    • /
    • pp.235-244
    • /
    • 2004
  • The effective management of major construction resources is the key to the success in high-rise residential building construction projects. It is even more important and challenging as well especially in CBD(central business district) area under tight project duration since little leeway in interface between construction trades, severe constraints in staging n and heavy demands for lifting among construction resources. In order to meet high demands among major construction resources, highly effective construction resource management information system is required This research develops and provides a system which selects and disseminates these information from each phase of procurement transportation, lift-up and storage for major construction resources This research applies the Kanban system, well recognized material information system technique in automobile manufacturing industry, in concrete work processes. It develops concrete procurement information system utilizing VSM(Value Stream Mapping) and also applies the model in actual super-high rise residential building construction project in order to analyze the benefit of the research model.