• Title/Summary/Keyword: 가설교량

Search Result 102, Processing Time 0.027 seconds

Risk Analysis of Suspension Bridge by a Linear Adaptive Weighted Response Surface Method (선형 적응적 가중 응답면기법에 의한 현수교의 위험도 분석)

  • Cho, Tae Jun;Kim, Lee Hyeon;Cho, Hyo Nam
    • Journal of Korean Society of Steel Construction
    • /
    • v.20 no.1
    • /
    • pp.93-104
    • /
    • 2008
  • study deals with the reliability assesment for the 5-year phases of a suspension bridge construction in Korea. The main objectives of this study are; (1) the evaluation of the reliability of a suspension bridge by considering an ultimate limit state for the fracture of main cable wires, (2) the determination of the critical phases among 28 construction stages for the deck erection, and (3) the evaluation of the reliability of the limit state for the erection control during construction stages. The research and the design of the suspension bridge have been focused on the state of construction mainly based on empirical data. Based on the recent survey of the distribution of accidents in Korean railways, over 80% of the accidents related to the uncertainties in human error, planning, design, materials and loads during construction have ben reported before the completion of construction. While many researches have evaluated the safety of bridges, the uncertainties in the construction phases have not been well treated in a guidelines or a specifications. An improved adaptive response surface method is used for the risk assessment in the construction phases of the target suspension bridge.

Behavior Due to Construction Step in Steel Deck Bridge by Large Block Construction Method (대블록시공법에 따른 강상판교의 시공단계별 거동)

  • Lee, Seong-Haeng;Kim, Kyoung-Nam;Hahm, Hyung-Gil;Jung, Kyoung-Sup
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.14 no.2
    • /
    • pp.97-105
    • /
    • 2010
  • The displacements of steel deck bridge due to construction step are measured, and three dimensional analysis with full modeling is carried out to compare with the measured results. Three dimensional structural analyses considering construction step by large block construction method are accomplished with verified model. The conclusions are as follows. 1. Comparing the data of grid analysis with the result of 3D full modeling in steel deck bridge, the design method using grid analysis has a limit for describing the displacements of curved bridge. The analysis of 3D full modeling has been proved as more accurate method. The differentiation of results in two methods is about 10%~20%. 2. It is verified that the maximum displacement of during construction is 1.7 times larger than the displacement of final construction. 3. The bridge behavior considering the construction step is somewhat different from that of final stage in whole structure and the displacement and stress during construction is larger than that of final construction. Therefore, it needs the reasonable structural design considering the construction step to get economical efficiency and a high competitive construction.

Techniques of Optimizing the Launching Nose under Conditions of Minimizing the Launching Bending Moment (압출가설시 발생하는 휨모멘트의 최소화 조건을 통한 압출노즈의 최적설계)

  • Choi, Hang Yong;Suh, Suk Koo;Oh, Myung Seok;Oh, Sae Hwan
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.4A
    • /
    • pp.487-495
    • /
    • 2008
  • The behavior of nose-deck system during launch was examined by three dimensionless launching parameters, such as the relative flexural stiffness, the relative nose weight, and the relative nose length. The techniques of optimizing the launching nose were illustrated and equations of relationship between relative nose weight and relative nose length were derived under minimum conditions of the launching negative and positive moment. Equations of maximum positive and negative moment were suggested under the conditions. The optimum design method of the launching nose was proposed in launched continuous girder bridges. It was found that the ideal launching nose was to design that with the relative nose weight of 0.167 and the relative nose length of 0.836 to minimize absolute values of the positive and negative moment during launch.

Development of Displacement Estimation Technique for Bridges Located under Poor Measurement Circumstances (계측이 어려운 환경에 가설된 교량의 변위 추정 기술 개발)

  • Jeon, Junchang;Lee, Heehyun
    • Journal of the Korean Society for Railway
    • /
    • v.19 no.6
    • /
    • pp.755-764
    • /
    • 2016
  • In this paper, to verify the field application of a displacement estimation technique based on the relationship between displacement and strain, static and dynamic field load test are performed on three-span continuous real bridge structures. The superstructure types of the test bridges are IPC girder highway bridge and steel box girder AGT bridge. LVDTs and strain gauges are attached to them; then, the responses due to test vehicle are measured. To obtain the displacement-strain relationship of the test bridges, the bridges are modeled as grillage system with 6 DOFs for the purpose of structural analyses. Static and dynamic displacements, which are estimated using both the calculated displacement-strain relationship and the measured strain signal, agree well with the values measured by LVDT. This study demonstrates that the displacement estimation technique using the strain signal can be effectively applied to the displacement measurement of bridge structures that cross rivers/roads/railways or have high clearance.

A Study for the Water Rising Effect on Flood Water Level by Debris (유송잡물에 의한 홍수위 상승 영향분석 - 삽교천의 선우대교를 중심으로 -)

  • Cho, Yong-Ho;Jeong, Sang-Man;Han, Kyu-Ha;Shin, Kwang-Seob
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.7 no.5
    • /
    • pp.179-186
    • /
    • 2007
  • This paper has investigated a rise of water level in upstream and downstream of bridge, which is caused by accumulation of debris in a bridge. The debris has been classified into several types in terms of size. The rise of water level which has been caused by installation and removal of sheet pile that is used to block water in a bridge has been analyzed using HEC-RAS model. According to the analysis, it has turned out that the debris has no influence on the rise of water level in ordinary water flow. In addition, sheet pile has little impact on the rise of water as well. Even though the impact of sheet file has turned out trivial in flood flow just like the ordinary water flow, it's been simulated that the maximum water level difference between upstream and downstream of bridge turned out more than 1.0meter because of debris in 80-year or more flood frequency. When the rise of water level in upstream from the cross section of the bridge was investigated based on 100-year flood frequency, besides, it has turned out that it had an influence up to 17.84km distance because of the effect of debris.

Behavior and Improvement of Construction Crack occurred on Anchorage of PSC-edge Girder Rahmen Bridge (PSC-Edge 거더 라멘교의 정착부에 발생한 시공 균열 거동과 개선)

  • Ok, Jae-Ho;Yhim, Sung-Soon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.20 no.5
    • /
    • pp.569-576
    • /
    • 2019
  • PSC-Edge Rahmen Bridge makes low thickness and long span by introducing prestressed force to the edge girder and reducing positive moment. In the bridge, diagonal tension cracks occurred in the direction of $45^{\circ}$ to outer side of the girder after the temporary bent supported on the lower part of the upper slab and the secondary strand is tensioned on the girder. Researches on stress distribution and burst crack behavior of pre-stress anchorage has been conducted, it is difficult to analyze an obvious cause due to difference between actual shape and boundary condition. This study performed 3D frame analysis with additional boundary condition of temporary bent, the maximum compression stress occurred in the girder and there was a limit to identify the cause. It performed 3D Solid analysis with LUSAS 16.1 and the maximum principal tensile stress occurred at the boundary between the girder and the slab. As analyzing required reinforcement quantity at obtuse angle of the girder with the maximum principal tensile stress and directional cosine, reinforcement quantity was insufficient. Additional bridges have increased reinforcement quantity and extended area and crack was not occurred. It is expected that cracks on the girder during construction could be controlled by applying the proposed method to PSC-Edge Rahmen Bridge.

Estimating Design Wind Speeds for a Long Span Bridge in a Complex Terrain (주변지형을 고려한 장대교량 설계풍속 산정)

  • Lee, Seok-Yong;Kim, Yoon-Seok;Lee, Seung-Woo;Kwon, Ho-Chul;Kim, Seog-Cheol;Cho, Kyung-Hak
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2010.04a
    • /
    • pp.429-431
    • /
    • 2010
  • 태풍 및 지형에 대한 컴퓨터 시뮬레이션과 기상관측자료에 대한 분석을 통해 장대교량의 가설위치에서 발생할 수 있는 풍환경을 분석하고 설계풍속을 산정하였다. 설계풍속의 산정은 내풍 설계를 위한 하중을 결정하는 과정으로 내풍설계의 기본이 되는 부분이다. 풍환경 분석 과정은 Monte Carlos(이하 MC) 태풍 시뮬레이션 분석, Gumbel 극치분석, CFD 지형효과 분석으로 구성된다. MC 태풍시뮬레이션 분석을 통해 태풍시기(6~10월)의 재현주기별 강풍발생빈도를 도출하였다. Gumbel 극치분석을 통해 인근의 기상관측자료로부터 전년도에 대한 재현주기별 강풍발생빈도를 도출하였다. CFD 지형효과 분석을 통해 분석대상지역의 주변지형으로 인한 풍속증감효과를 분석하였다. 각 결과를 종합하여 보수적인 재현주기별 설계풍속을 산정하였다.

  • PDF

Uncertainty and Updating of Long-Term Prediction of Prestress in Prestressed Concrete Bridges (프리스트레스트 콘크리트 교량의 프리스트레스 장기 예측의 불확실성 및 업데이팅)

  • 양인환
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.17 no.3
    • /
    • pp.251-259
    • /
    • 2004
  • The prediction accuracy of prestress plays an important role in the quality of maintenance and the decision on rehabilitation of infrastructure such as prestressed concrete bridges. In this paper, the Bayesian statistical method that uses in-situ measurement data for reducing the uncertainties or updating long-term prediction of prestress is presented. For Bayesian analysis, prior probability distribution is developed to represent the uncertainties of creep and shrinkage of concrete and likelihood function is derived and used with data acquired in site. Posterior probability distribution is then obtained by combining prior distribution and likelihood function. The numerical results of this study indicate that more accurate long-term prediction of prestress forces due to creep and shrink age is possible.

A Study on the Weld Performance of High Strength Steel considering the Fabrication (제작을 고려한 고강도강재의 용접성능에 관한 연구)

  • Kyung, Kab Soo;Hong, Sung Wook;Park, Yong Jin
    • Journal of Korean Society of Steel Construction
    • /
    • v.14 no.5 s.60
    • /
    • pp.647-656
    • /
    • 2002
  • High-strength steel in steel bridges is the key to achieving cost-efficiency because it facilitates lightweight construction and rationalizes structure. The future of high-strength steel is bright, with its use projected to expand. As such, it is necessary to evaluate precisely various factors affecting the process of fabricating high-strength steel, i.e., welding heat, strain hardening, and weldability and performance of the welded joints. This study therefore performed the maximum hardness test and y-groove weld crack test using welding processes such as SAW, FCAW, and GMAW, in order to investigate the welding performance and characteristics of welded Joints or high-strength steel produced in Korea such as SM570, POSTEN60, and POSTEN80. In addition, a series of welding tests was carried out to estimate the tensile strength, bending characteristics, absorbed energy, and hardness in welded joints.

사장교의 설계

  • 김우종;조경식
    • Computational Structural Engineering
    • /
    • v.6 no.3
    • /
    • pp.5-11
    • /
    • 1993
  • 본문에서는 서해대교 사장교 설계의 경험을 기초로 사장교의 거동원리와 구조해석시 유의해야 할 몇가지 사항들에 대해서 기술하였다. 특히 강합성사장교의 주형해석시 바닥판과 강형의 모델링, 가설방법과 순서에 따른 명확한 이해와 이에 따른 구조계의 이상화, 시간경과에 따른 재료성질의 보다 엄밀한 구현 등이 설계에 미치는 영향과 중요성을 강조하였다. 사장교는 기존의 현수교에 비해 주형의 강성을 효율적으로 사용할 수 있고 미관이 탁월할 뿐 더러 주위환경에 따라 가설방법과 구조계를 변화시킬 수 있는 적응성이 뛰어나다. 이와 같은 측면 때문에 사장교는 현대 중.장대교량을 대표하는 형식으로 점차 그 영역을 넓혀가고 있다. 국내에서도 올림픽대교를 비롯한 몇개의 사장교가 건설되었으며 이와 같은 경험을 바탕으로 순수 국내기술에 의해 세계에서 10위권에 드는 장대사장교인 서해대교가 설계되기에 이르렀다. 이와 같은 경험의 조각들이 모여 국내 토목설계의 비약을 이룰 수 있는 전환점이 될 것임을 믿어 의심치 않는다.

  • PDF