Jilin province has a rich variety of agricultural and sideline products. The circulation of agricultural products needs the support of cold chain logistics. The development of cold chain logistics in Jilin province is lagging behind, which leads to waste of agricultural products and decrease of farmers' income. As a result, this article from the perspective of cold chain logistics development, extracted the influence factors of fresh agricultural products cold chain logistics development in Jilin province, using the analytic hierarchy process (AHP) on the degree of restriction factors, weight analysis found that agricultural products cold chain logistics costs, information technology application and market-based degree of cold chain logistics is the three main factors for the development of Jilin province agricultural cold chain logistics, and puts forward the development plan, in order to guide the development direction of Jilin agricultural cold chain logistics.
Journal of the Korean Data and Information Science Society
/
v.24
no.3
/
pp.557-569
/
2013
Risk management activity for successful defense R&D project should be done anticipatorily and consistently over the entire project period and there should be a priority for management depending on importance of the risk factors. In this study, we verified the reliability and validity through factor analysis for the risk factors selected by the Delphi technique. We also obtained the relative importance of risk factors with analytic hierarchy process (AHP) and decided to prioritize for comparison of domestic and overseas research. According to the study, we found that it is important to settle the requirements and to classify the scope of R&D. It is also considered significant to have reasonable schedule for completion and secure the necessary resources in the early stage of project. Unlike previous studies, it appeared the technical factors are critical elements as well for defense R&D project.
KSCE Journal of Civil and Environmental Engineering Research
/
v.33
no.3
/
pp.917-926
/
2013
This study presents the feasibility of fuzzy multi-criteria decision making (MCDM) techniques for the robust prioritization of projects. It is applied to water resources planning problem. Results from weighted sum method (WSM), analytic hierarchy process (AHP), revised analytic hierarchy process (R-AHP), and TOPSIS are compared with those from Fuzzy WSM, Fuzzy, AHP, Fuzzy R-AHP, and Fuzzy TOPSIS. For the calculation, all weights on criteria and the normalized data were obtained from the same investigation. As a result, the rankings from four MCDM techniques are slightly different while those from fuzzy MCDM show the comparatively consistent ranking. Therefore, it is desirable to use fuzzy MCDM technique when MCDM is used for the prioritization problem, since fuzzy MCDM can include the uncertain variability of input data and weighting values on criteria.
This study develops composite indicators that is capable of estimating QOS (Quality of Service) of pedestrians by enhancing estimation for Level of Service in present transporting spaces for pedestrians that merely concerns quantitative indicators such as pedestrian flow rate, pedestrian stoppage. This paper conducts survey questionnaire to collect data. It utilizes AHP(Analytic Hierarchy Process) and ANP(Analytic Network Process). The main results show that: first, ANP is better analytic methods than AHP due to the fact that pedestrians feel repetition when they judge level of service. Second, qualitative factors such as pedestrian behaviors, maintenance, scenary for pedestrians and environments should be considered. Importance of qualitative factors is higher in residential area than other areas. I expect that using qualitative indicators and quantitative indicators is appropriate in order to estimate pedestrians' QOS.
The main purposes of this study were eliciting the planning contents and indices that is necessary to consider the physical part of public space, the side of service users and coherent side for improving public service. After then it analyzed the importance in both civil servants and practical officials side. For this public space planning topics and indicators by FGI (Focus Group Interview) derived through and through expert questionnaires Analytic hierarchy (AHP: Analytic Hierachy Process) were analyzed by conducting importance. A result, the priority of public space as a park planning index was found in the case of privately owned public space, public pedestrian pathways, public open space, public facilities land, the park is located, and the most important characteristics of the road, if the public transport association the most important thing is derived. In order to enhance the public good public space and location for easy access to the consideration of whether the plan should be. Therefore this work will be the fundamental materials to make some of farther policies related with the development of public interest of private-public spaces.
Korean Journal of Construction Engineering and Management
/
v.14
no.3
/
pp.157-166
/
2013
Unlike conventional BTO(Build-Transfer-Operate) projects, this BTL project aims at fixing the financial deficiencies of the government and expanding infrastructure through private capital. It allows the government to attract private capital for the construction of public facilities such as schools and social welfare agencies for whom private users don't need to pay, thereby bolstering national finance. BTL projects are causing a variety problems in progress. Therefore, we are required a practical approach to can improving a variety problems. In this study, we were derive the problem areas as follow. First, research data on the problem of domestic BTL projects, Second, high-performing foreign data analysis than domestic. And, we were analyzed to systematic management method for problem areas by using affinity techniques, matrix comparison analysis, AHP technique. Results of this study are expected provide management standards through real problem areas and the analyzing of relatively importance.
Purpose: This paper is for the improvement of the fire gate performance that occurs between the construction company and the residents. A survey was conducted on experts in the construction to prepare the causes and measures for the suit. Method: The application of the Analytic Hierarchy Process(AHP) resulted in the following conclusions. Results: TIn the 2nd tier, 28percent of the "strengthening standards for installation of fire prevention zones" included in the "institutional strengthening of stnadards" of the 1st tier had higher importance. In the 3rd tier, "strengthening the installation standards by floor area" and "strengthening the standard of fire-resistant structures" showed high importance. Conclusion: The results suggest that detailed legal criteria for detailed installation criteria with varying site conditions are needed.
The purpose of this research is to derive and evaluate priorities for critical factors that must be determined before an enterprise adopts a cloud computing service. AHP analysis techniques were used to reflect decisions made by experts as research methods. AHP is a decision-making technique that expresses complex decision-making problems hierarchically and derives the best alternatives through pairwise comparison between the items of the hierarchy. Compared to the existing statistical decision making techniques, the decision making process is systematic and simple, making it easy to understand. In addition, the procedure is also reasonable by providing an indicator to determine the consistency of the decision maker in the analysis process. The analysis results of this research showed that security was the first priority, reliability was the second priority, and economic efficiency was the third priority. Among the factors in the first-priority security items, the access control rights and the safety factors of external threats are the most important factors. Research results can be used as a guideline in future practice, and it is necessary to evaluate, compare and analyze the satisfaction of companies that have adopted cloud computing services in the future.
The main tasks of commander and staffs in ground operations are a continuation performing the process of making decisions in various situations. Since the current decision-making process is largely dependent on qualitative methods, it is difficult to integrate with the decision-making tools associated with the 4th Industrial Revolution. The purpose of this study is to suggest the process of deriving the relative importance of the evaluation factors using the AHP with focusing on assessing the avenues of approach in IPB related to the ground operation plan. The most important aspect of IPB is the evaluation of the avenues of approach. Evaluation factors include target accessibility, observation and seasons, concealment and cover-up, ease of maneuverability, and ease of transition to adjacent access roads. The existing methods are the comparison method with evaluation factors and the analysis with the advantages and disadvantages. However, it has been criticized that they regard evaluation factors as equal importance. The results show that target accessibility has the highest score related with priority when considering the criteria.
This study aimed to develop priorities alternatives based on relative rather than absolute assignments on clothing evaluative criteria. The relative comparison approach includes much redundancy and is thus less sensitive to judgemental errors common to techniques using absolute assignments. By deriving evaluative criteria for consumers in choosing clothing, and considering their relative important or value in the priority of evaluation elements. When the consumer selects clothing, it requires multi-criteria decision making exercise and needs to make trade-offs between different alternatives. With an application of the AHP's hierarchical structuring and pair-wise comparisons, this study will determine the weight and priorities of evaluation factor in clothing evaluative criteria in choosing cloth, which will eventually lead to improve management. Items for the setting priority were decided as 'symbol', 'practicality', 'economy', 'vogue', and 'aesthetic' by council. The data for this research were collected from respondents of 108 females in Busan. Data were analyzed by frequency and AHP. As the results, 'economy' was decided as a most important item. And 'a fashionable color' evaluated as that of first priority in the totality evaluation elements.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.