• 제목/요약/키워드: (WBS)Work Breakdown Structure

검색결과 96건 처리시간 0.026초

규칙(Rule) 과 CBR 기법을 활용한 프로젝트 일정관리 모듈 구현에 관한 연구 (A Study on Project Management Scheduling Module Development using the Rule and CBR)

  • 신호균;김영준;전승호
    • 한국디지털정책학회:학술대회논문집
    • /
    • 한국디지털정책학회 2004년도 춘계학술대회
    • /
    • pp.343-354
    • /
    • 2004
  • A Project planning is one of the most important processes that determines success and failure of the project. Scope management for project planning is also essential job in system integration project. However project planning is very difficult because lots of factor and their relationships should be considered. Therefore project planning of SI project has been done by project manager s own knowledge and experiences. It is necessary to develop an algorithm of WBS(Work Breakdown Structure) identification & document selection along to project's specificity in project management system using AI technique. This study also present method (ODW model) to cope with the limitations of the existing study that has uniformly customizing the methodology by only project complexity. We propose PPSM(Project planning support module) that apply Rule for determination of route map and document level, and CBR for WBS identification.

  • PDF

차세대 첨단 도시철도시스템 기술개발사업의 업무분류체계(WBS) 구성에 관한 연구 (Work Breakdown Structure for advanced urban transit system)

  • 박성혁;오세찬;여민우
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2005년도 추계학술대회 논문집
    • /
    • pp.921-927
    • /
    • 2005
  • Concurrent engineering is considered in the 21st century product development and H&D. Moreover, advancements in IT and advanced system engineering technology enables to produce high-quality article and shorten the period of R&D. The paper propose work breakdown structure(WBS) based on the product data management(PDM), WEB based system engineering technique, to introduce and operate advanced system engineering technique. We will manage systematically all data produced in advanced urban transit system project based on the proposed WBS. Besides, we provide strategic information for improving efficiency of R&D in advanced urban transit system project. Futhermore, we manage data such as images, design drawings, documents as well as numerical data, and will establish PDM system for sharing the data.

  • PDF

경량전철시스템 작업분류구조 및 부품분류구조 구성 (The Configuration of Work Breakdown Structure and Part Breakdown Structure for Light Railway Transit System)

  • 목재균;이우동;이병송;최규형
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2000년도 춘계학술대회 논문집
    • /
    • pp.71-77
    • /
    • 2000
  • The system is defined as groups which are operative, dependentive, configurational of all each others. In oner to develop the AGT system efficiently, the system engineering process has to be organized It will be started by the configuration of WBS and PBS. A WBS is a method of naming and organizing all of the wok elements to be done for a projects. It completely defines the projects, is normally prepared in an hierarchical during design and project execution. A number, or alpha-numeric identification, is assigned to every WBS elements. Also a hierachy of system physical components should be established. It named to PBS, which is a method of naming and organizing all of the physicals elements to be done far a projects. Therefore we will propose the WBS and PBS to fit for AGT system in this reports.

  • PDF

농촌시설물 시공 및 유지관리 정보화 시스템 구축을 위한 작업분류체계 구축에 관한 연구 -비닐하우스, 유리온실, 축사를 중심으로- (A Study on the Work Breakdown Structure of Agricultural Facilities for Developing a Construction and Maintenance Information System -Focused on Vinyl house, Glass greenhouse, Cattle shed-)

  • 최오영;김태희;김재엽;김광희;최응규
    • 한국건축시공학회지
    • /
    • 제9권4호
    • /
    • pp.147-155
    • /
    • 2009
  • 최근 들어 농촌에서는 농업규모의 증가, 기술적 복합성 증가, 대량 생산으로 시설물이 점차 다양화, 대형화, 복잡화 되고 있다. 또한 농업의 국제 경쟁력을 갖추기 위해 새로운 관리기술이 필요시 되고 있는 실정이다. 따라서 본 연구는 농촌시설물을 관리할 수 있는 정보시스템 구축을 위한 분류체계를 설정하고자 한다. 시설물에 대한 분류체계 및 코드부여 작업을 통해 PCM(조달-시공-유지관리)정보시스템 구축을 할 수 있을 것이다. 연구의 내용은 국내 건설정보 분류체계의 시설물(Facilities), 공간(Spaces), 부위(Elements), 공종(Works), 자원(Resources)의 5가지 자료를 분석하였으며, 농촌시설물에 적합한 항목들을 도출하였다. 농촌시설물 중 가장 높은 비율을 차지하는 비닐하우스, 온실, 축사 순으로 위계를 설정하여 연구를 진행하였으며, 그 결과, 비닐하우스는 프레임 공간과 시설물 마감공간으로 구분하여 자재코드를 부여하였다. 온실의 경우는 창호의 형태에 따라 코드를 부여하였으며, 축사는 H-beam축사, Pipe축사로 구분지어 코드를 부여하였다. 본 연구에서 설정된 분류코드는 향후 조달 시공 유지관리 시스템의 기초 데이터로 활용 될 것으로 사료된다. 시스템이 구축되면 제품의 부품화와 모듈화를 통해 전문가의 도움 없이 농민이 직접 설치 시공 할 수 있으며, 유지관리 및 교체부품의 정확한 구분으로 인해 폐기물을 최소할 것으로 판단된다.

해양레저 산업의 통합 정보 시스템 구축에 관한 연구 (A Study on Integrated Information System for Marine Leisure Industry)

  • 김용섭;김대진
    • 한국해양환경ㆍ에너지학회지
    • /
    • 제16권1호
    • /
    • pp.17-24
    • /
    • 2013
  • 해양레저 산업의 후발주자인 국내 해양레저 산업이 국내 시장 및 세계시장에 경쟁력을 가지기 위해서는 기획, 설계, 계획과 준비 등 제품 개발 및 제조의 각종 업무에 소요되는 시간과 비용을 단축시켜 높은 수준의 시장 적응력을 확보해야 한다. 위 사항들을 만족하기 위해서는 해양레저 산업 전반을 관리 할 수 있는 통합 시스템 구축이 절대 적으로 필요한 상황이다. 유관 산업 시스템간의 유기적 연결고리를 찾아서 요구되는 통합 정보를 확보하고 이를 단순 순차적 정보의 흐름이 아닌 통합적 정보 흐름과 객체 지향적 정보 분류체계를 확보하는 것이 주요 연구 핵심 사안이다. 이를 위하여 다른 유사 산업에서 실재 정보 체계를 활용한 사례 및 산업생산에 적용된 제품수명주기관리(PLM), 제품 데이터 관리(PDM), 가상 생산(DM)과 같은 방법론을 검토 하고 이를 구성 및 적용하여 실질적으로 활용되고 있는 정보 체계 및 작업분류체계(WBS)의 사례를 연구하여 비교 한다. 이를 통하여 해양레저산업을 위한 기본적인 작업분류체계 구성을 추진하며 실재 업체에서 현재 활용중인 정보를 입력, 대입을 통하여 실증적으로 검증하고 해양 레저 산업의 고유한 영역을 추가하여 해양레저 작업 분류 체계(MLWBS)를 완성한다. 본 해양레저 작업 분류 체계를 바탕으로 여러 가지 정보체계 및 제품, 설계, 엔지니어링, 생산, 구매, 영업, 마케팅, AS, 고객지원 등에 다양한 형태의 활용이 가능 하도록 할 수 있을 것이다.

건축 WBS 위계 분석을 통한 소방 IFC 스키마 확장 방법론에 관한 연구 (Methodology of Fire Safety IFC Schema Extension through Architectural WBS Hierarchy Analysis)

  • 김태훈;원정혜;홍순민;추승연
    • 한국BIM학회 논문집
    • /
    • 제12권4호
    • /
    • pp.70-79
    • /
    • 2022
  • As BIM(Building Information Modeling) technology advances in architecture around the world, projects and industries using BIM are increasing. Unlike previous developments that were limited to buildings, BIM is now spreading to other fields such as civil engineering and electricity. In architecture, BIM is used in the entire process from design to maintenance of a building, and IFC(Industry Foundation Classes), a neutral format with interoperability, is used as an open BIM format. Since firefighting requires intuitive 3D models for evacuation and fire simulations, BIM models are desirable. However, due to the BIM model, which was developed centered on building objects, there are no objects and specific properties for fire evacuation in the IFC scheme. Therefore, in this study, when adding a new object in the firefighting area to the IFC schema, the IFC interoperability is not broken and the building WBS(Work Breakdown Structure) is analyzed with a hierarchical system similar to the IFC format to define the scope for a new object and the firefighting part within of the building WBS to derive a firefighting HBS(Hierarchy Breakdown Structure) with the extension of the object-oriented IFC file. And according to HBS, we propose an IFC schema extension method. It is a methodology that allows BIM users to instantly adapt the IFC schema to their needs. Accordingly, the methodology derived from this study is expected to be expanded in various areas to minimize information loss from IFC. In the future, we will apply the IFC extension methodology to the actual development process using HBS to verify that it is actually applicable within the IFC schema.

하이테크 공장의 효율적 건설 사업비 분석 및 예측을 위한 WBS·CBS 기반 건설정보 분류체계 구축 (Establishment of WBS·CBS-based Construction Information Classification System for Efficient Construction Cost Analysis and Prediction of High-tech Facilities)

  • 최성훈;김진철;권순욱
    • 한국콘텐츠학회논문지
    • /
    • 제21권8호
    • /
    • pp.356-366
    • /
    • 2021
  • 국가 경제를 이끌고 있는 하이테크 산업은 일반 건축물에 비해 투자비 규모가 크고 공사 기간이 짧으며 지속적인 투자가 필요한 특성으로 인하여 정확한 공사비 예측과 빠른 의사결정은 효율적인 비용 및 공정 관리를 위한 중요한 요소이다. 국외의 경우, 1980년부터 건설정보 분류체계 표준화를 시행하고 지속적인 발전을 이루어, 체계적으로 프로젝트 전 생애 주기 정보를 수집·활용하는 등 건설 생산성을 향상시키고 있다. 반면, 국내의 건설 현장에서는 건설정보 분류체계의 표준화를 위한 시도들이 있었으나, 표준화 주체의 부재, 건설사별 비용 및 공정관리 방식의 차이로 인한 지속적인 표준화 및 체계화가 이루어지는 데 어려움을 겪고 있다. 특히 하이테크 산업의 경우, 큰 규모, 수많은 공종, 복잡한 공사, 보안 등의 문제로 인하여 하이테크 공장 건설을 위한 건설정보 분류체계 표준화·체계화 수준이 매우 낮다. 따라서 본 연구의 목적은 국내 건설된 관련 프로젝트 데이터를 수집·분류·분석을 통하여 하이테크 공장 건설에 적합한 건설정보 분류체계를 구성하는 데 있다. 본 연구를 통해 분류·분석된 WBS(Work Breakdown Structure)·CBS(Cost Breakdown Structure)를 기반으로 계층적 구분을 통한 코드체계를 제안하였고, WBS와 CBS를 연계를 통한 건축물의 비용 모델을 입체화 및 활용 방법을 제시하였다. 이를 통하여, 일반적인 건설정보 구분 체계인 일 방향의 트리구조를 벗어나 상호 관계성을 기반으로 한 정보 분류체계가 가능하여, 공사 기간 단축 및 비용 절감 등 효과를 극대할 수 있을 것이다.

4D객체 활용에 의한 건설공사 리스크 인자별 중요도 시각화 기법연구 (Visualizing Method of 4D Object by Weight of Construction Risk Factors)

  • 강인석;박서영;김창학;문현석
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2006년도 정기학술발표대회 논문집
    • /
    • pp.571-573
    • /
    • 2006
  • 본 연구에서는 리스크관리 인자별 중요도와 4D 객체 시각화방법론을 통한 리스크관리 정보의 시각화 모델을 제안한다. 리스크관리 프로세스 모델은 WBS(Work Breakdown Structure)와 RBS(Risk Breakdown Structure)를 통해 구성되며, RBS에서 분류된 리스크 인자는 퍼지 분석기법을 통해 중요도(Weight)가 분석된다. 이 중요도는 4D 시각화를 위한 건설공사 객체(Object)의 속성 데이터로 지정된다. 또한 Object의 4D 시각화를 위한 방안으로는 4D 시뮬레이션기법이 활용되며, 등급별로 구분된 리스크 인자의 중요도와 4D 시뮬레이션을 통해 직접적인 건설공사 부위별 리스크관리 수준 확인과 부위별 리스크 인자의 시각화가 가능하도록 하는 방법론을 제시한다.

  • PDF

항공기용 연료계통 압력조절밸브의 FMEA를 적용한 신뢰성 설계 (Reliability Design Using FMEA for Pressure Control Regulator of Aircraft Fuel System)

  • 배보영;이재우;변영환
    • 한국항공운항학회지
    • /
    • 제17권1호
    • /
    • pp.24-28
    • /
    • 2009
  • The reliability assessment is performed for Pressure Control Regulator of Aircraft Fuel System using reliability procedure which consists of the reliability analysis and the Failure Modes and Effects Analysis(FMEA). The target reliability as MTBF(Mean Time Between Failure) is set to 5000hr. During the reliability analysis process, the system is categorized by Work Breakdown Structure(WBS) up to level 3, and a reliability structure is defined by schematics of the system. Since the components and parts that have been collected through EPRD/NPRD. The predicted reliability to meet mission requirements and operating conditions is estimated as 4375.9hr. To accomplish the target reliability, the components and parts with high RPN have been identified and changed by analyzing the potential failure modes and effects. By changing the configuration design of components and parts with high-risk, the design is satisfied target reliability.

  • PDF

작업분류체계 기반 소방 객체 IFC 정보 모델링 확장 방안 연구 (Extension of IFC information Modeling for Fire Safety based on WBS)

  • 원정혜;김태훈;추승연
    • 한국BIM학회 논문집
    • /
    • 제13권2호
    • /
    • pp.37-46
    • /
    • 2023
  • The main objective of this study is to propose a method to enhance building safety using the Industry Foundation Classes (IFC) schema in Building Information Modeling (BIM). To achieve this goal, a fire object relationship diagram is created by using the Model View Definition (MVD) and Property Set (Pset) methodology, as well as the Work Breakdown Structure (WBS) based object relationship analysis. The proposed method illustrates how to represent objects and tasks related to fire prevention and human safety during a building fire, including variables that are relevant to these aspects. Furthermore, the proposed method offers the advantage of considering both the IFC object hierarchy and the project work hierarchy when creating new objects, thereby expanding the attribute information for fire safety and maintenance. However, upon confirmation via an IFC viewer after development, a problem with the accuracy of mapping between attributes and objects arises due to the issue of proxy representation of related object information and newly added object information in standard IFC. Therefore, in future research, a mapping method for fire safety objects will be developed to ensure accurate representation, and the scope of utilization of the fire safety object diagram will be expanded. Furthermore, efforts will be made to enhance the accuracy of object and task representation. This research is expected to contribute significantly to the technological development of building safety and fire facility design in the future.