참고문헌
- Akhund, M,A., Khoso, A. R., Pathan, A.A., Imad, H. U., &Siddiqui, F. (2018). Risk attributes, influencing the time and coust overrun in joint venture construction projects of Pakistan. Enginnering, Technology & Applied Science Research, 8(4), 3260-3264. https://doi.org/10.48084/etasr.2203
- Choi, H.M. (2018). A Study on the Joint Venture Contract by the Joint Implementation Method of Step by Step Contract Dispute Cause and Resolution, Master Thesis, Korea University.
- Hong, S.C., & Park, C.S. (1997). An Effective Operation and Management Scheme for Construction Joint-Venture Contract. Journal of Architectural Institute of Korea, 13(6), 383-392.
- Hwang, S.H. (2014). A Study on the Unconstitutionality of the regional quota of the Construction Joint Contract System, Ph.D. Dissertation, Kwangwoon University.
- Jeong, S.J. (2015). Improvements of Joint-Venture contract System with a Prime Contractor, Master Thesis, University of Seoul.
- Jung, K.S. (2010). A Legal Study on The Joint Venture, Master Thesis, Kwangwoon University.
- Kim, C.S. (2015). A Legal Study on the Construction Claims, Ph.D. Dissertation, Hoseo University.
- Kim, H.S. (2021). A Study on joint venture. Ph.D. Dissertation, Hanyang University.
- Kim, J.T. (2013). A Study on the Joint Venture Contract for the Public Construction, Master Thesis, Hanyang University.
- Kim, K.H. (2013). A Study on Joint-Venture Contracts of Construction Industry in Korea, Master Thesis, Hanyang University.
- Kim, M.S. (2003). Operation status and problems of the joint contract system. Journal of Construction Economy, 28-41
- Ku, J.C. (2016). A Study on solution of the disputes between the construction joint ventures and the interested parties, Master Thesis, Kwangwoon University.
- Lee, J.W., Kim, W.S., Choi, M.I., Kim, Y.H., & Hyun, C.T. (2001). A Study on the Improvement of Joint-Venture Methods for the Design-Build in the Domestic Building Construction, Journal of Architectural Institute of Korea, 21(2), 639-642.
- Lee, S.M. (2001). Efficiency of Joint Contract Operations, Construction & Economy Research Institute of Korea 1-145.
- Lee, K.O. (2019). A study on the improvement plan of taxation system of joint contract -Focused on joint construction contract-, Ph.D. Dissertation, Sungkyunkwan University.
- Lee, M.J., Kim, J.T., Ji, S.G., Park, W.Y., & Seo, J.W. (2013). Study on the Joint Venture Contract of Problems and Resolution -Focusing on the Joint Implementation Method-, Journal of Korean Society of Civil Engineers, 65-68
- Lim, E.S., Choi, E.K., & Cho, Y.H. (2003). The Study on the analyzing the problems occurred at construction site due to compulsory local joint contract, Journal of Architectural Institute of Korea, 23(1), 431-434.
- Park, S.H., Lee, J.K., Yang, C.H., Lee, J., & Kang, Y.K. (2021). Derivation of Design Elements for Connection through Urban Underground using FGI Method, Journal of Korean Society of Road Engineers, 23(2), 129-136.
- Park, S.K. (2010). A Study on Efficiency of the Joint Contract among Local Constructors for the public Procurement Works, Master Thesis, Kyung Hee University.
- Seo, M.S., & Kim, M.H. (2002). A Study on the Effective Operation Model of Joint-Venture Contract - With a Focus on the Example of Domestic Construction Industry, Journal of Korea Institute of Construction Engineering and Management, 3(1), 103-111.
- Seo, S.S. (2013). A Study on the Legal Relationships of Construction Joint Ventures, Master Thesis, Sungkyunkwan University.
- Shim, K.H. (2008). A Study of Taxation of Joint Construction, Master Thesis, Chung-Ang University.
- Yang, S.Y. (2012). A Study on Revitalization Plan for Joint Venture Contract System with Prime Contractor of Construction, Master Thesis, Korea Aerospace University.
- Yin, R.K. (2011). Case Study Research : Design and Methods 5th Edition. Hankyungsa.