References
- Lee KC. Program management of the Incheon International Airport construction project(phase1). Korean Journal of Construction Engineering and Management. 2020 Jun;21(3):9-13.
- Back MC, Yoon YD. Introduction to program management of the USFK base relocation project. Korean Journal of Construction Engineering and Management. 2019 Jun;20(3):9-13.
- Yoo KH. Program management of the Sejong city construction. Korean Journal of Construction Engineering and Management. 2020 Jun;21(3):14-8.
- Han JK, Chin SY, Kim YS. An analysis on delay factors of major trades in apartment housing projects. Journal of the Architectural Institute of Korea. 2003 Mar;19(3):163-70.
- Ji KC, Yu JH, Kim CD. The root cause analysis process for schedule delay in construction. Korean Journal of Construction Engineering and Management. 2006 Oct;7(5):138-48.
- Lee HC, Lee JH, Go SS. A study on the priority analysis of work delay factors in steal-frame work using FMEA. Korean Journal of Construction Engineering and Management. 2009 Jan;10(1):91-101.
- Lim GJ, Son CB. An analysis on the delay influence factors in apartment construction site. Journal of the Architectural Institute of Korea Structure & Construction. 2017 Sep;33(9):43-50. https://doi.org/10.5659/JAIK_SC.2017.33.9.43
- Ahn SH, Yu JH, Kim CD. An analysis on work delay factors in apartment house construction. Korean Journal of Construction Engineering ans Management. 2007 Dec;8(6):159-66.
- Lee HC, Lim SY, Yeo SK, Go SS. A study on the work delay factors of reinforced concrete work in apartment house construction. Journal of the Korea Institute of Building Construction. 2009 Apr;9(2):55-61. https://doi.org/10.5345/JKIC.2009.9.2.055
- Park CW, Yun SH. A case study on reason analysis for schedule delay of apartment house. Journal of the Korea Institute of Building Construction. 2009 Feb;9(1):89-94. https://doi.org/10.5345/JKIC.2009.9.1.089
- Lee SH, Kim YM, Kim JH, Kim JJ. Analysis of delay factors based on importance of construction subject-classified in apartment finishing works. Journal of the Korea Institute of Building Construction. 2011 Feb;11(1):73-81. https://doi.org/10.5345/JKIC.2011.02.1.073
- Ryu HG, Yu JH, Lee HS. A method of calculating schedule delay considering lost productivity. Journal of the Architectural Institute of Korea Structure & Construction. 2002 Oct;18(10):117-24.
- Kim YJ, Hong JS, Kim KR, Shin DW. An analysis method for the concurrent delay using delay section concept. Journal of the Architectural Institute of Korea Structure & Construction. 2004 Jun;20(6):141-8.
- Koo JM, Lee JS. Construction delay analysis method considering productivity. Journal of the Architectural Institute of Korea. 2004 Apr;20(4):147-54.
- Lee JS. Delay analysis using learning effect and linear scheduling in construction. Journal of the Architectural Institute of Korea Structure & Construction. 2008 May;24(5):185-92.
- Kim YJ, Kim TK, Jo DS, Lee HK. A study on substantiation methodology for extension of time in international mega-project claims. Korean Journal of Construction Engineering and Management. 2015 May;16(3):165-76. https://doi.org/10.6106/KJCEM.2015.16.3.165
- Kim SG, Kwon SW. Case analysis on application of project delay analysis method in domestic construction project. Korean Journal of Construction Engineering and Management. 2019 Nov;20(6):98-106. https://doi.org/10.6106/KJCEM.2019.20.6.098