참고문헌
- Byambadorj, T. (2012). "A Study of Factors that Caused 'CM at Risk's Inactivity and Proposal for the System Improvement." M.S. Dissertation, Department of Architecture, Soongsil University, pp. 1-44.
- Cho, H.K. (2011). "Construction Management Services during Pre-Construction Stages." M.S. Dissertation, Department of Architectural Engineering, Sejong University, pp. 37-60.
- Han, J.H. (2019). "Risk Factors to Implement CM at Risk Pilot Project." M.S. Dissertation, Department of Construction Management, Hanyang University, pp. 19-47.
- Han, J.H., Kim, K.T., and Ahn, Y.H. (2018). "Major Risk Factors to Implement CM at Risk Pilot Project on the Public Sector." Korean Journal of Construction Engineering and Management, KICEM, 19(3), pp. 61-69. https://doi.org/10.6106/KJCEM.2018.19.3.061
- Han, T.H. (2018). "Innovation of Pre-Construction Service Based Construction Production Method." Korean Journal of Construction Engineering and Management, KICEM, 19(5), pp. 41-45.
- Han, T.H., and Park, J.H. (2017). "A Possibility of Pre-Construction Service and its Core Technologies in Domestic Construction Market." 建築, AIK, 61(5), pp. 39-46.
- Kim, J.G. (2008). "The Strategy of the General Contractor Under the Circumstances of CM at Risk." M.S. Dissertation, Department of Architectural Engineering, Dong-A University, pp. 35-50.
- Kim, J.H. (2020). "PRECON." MID, pp. 113-234.
- Kim, J.H. (2010). "An Analysis about Factors Affecting Inactiveness of CM at Risk at Korean Construction Industry." M.S. Dissertation, Department of Construction Management, Hanyang University, pp. 13-39.
- Koh, S.H. (2018). "Comparison Analysis of BIM Use and Levelin the Domestic and Overseas BIM Projects according to Project Delivery System." M.S. Dissertation, Department of Construction Management, Hanyang University, pp. 5-28.
- Koo, S.K. (2017). "Risk Factor Assessment for Guaranteed Maximum Price Contract in CM at Risk." M.S. Dissertation, Department of Construction Management, University of Seoul, pp. 38-94.
- Lee, C.J., Lee, S.H., and Ahn, Y.H. (2017). "Benchmarking of US General Contractor's Pre -construction Services for a CM at Risk Project to Improve Contractor's Competitiveness." Journal of the Korea Institute for Structural Maintenance and Inspection, JKSMI, 21(5), pp. 9-18.
- Lee, K.D. (2015). "A Study on the Analysis of main Barriers for the Activation of CM at Risk in the Domestic Construction Industry." M.S. Dissertation, Department of Architectural Engineering, Kyungpook National University, pp. 47-58.
- Park, H.K. (2011). "A Study on the Effect of Pre-Detecting Errors Using BIM in the Pre- Construction Phase." M.S. Dissertation, Department of Architectural Engineering, Yonsei University, pp. 50-75.
- Park, K.M., and Kim, C.D. (2016). "Improvement through Analysis of Current Open Book Policy for the Korean CM at Risk." Korean Journal of Construction Engineering and Management, KICEM, 17(2), pp. 3-11. https://doi.org/10.6106/KJCEM.2016.17.2.003
- Park, S.J. (2020). "Improving the Performance of Construction Projects Introducing CM at Risk." M.S. Dissertation, Department of Construction Management, Hanyang University, pp. 29-40.
- Shin, S.H. (2004). "A Plan for Application of CM at Risk to the Public Construction Sector in Korea." M.S. Dissertation, Department of Construction Management, University of Seoul, pp. 35-107.
- Son, K.N. (2018). "Importance Analysis of Obstacle Factors on the CM at Risk Projects using AHP Method." M.S. Dissertation, Department of Construction Management, Hanyang University, pp. 15-67.