• Title/Summary/Keyword: Public Secter

Search Result 3, Processing Time 0.02 seconds

Improvement contract sum adjustment method caused by price fluctuation (물가변동에 의한 계약금액 조정방안 개선 기초연구)

  • Cho Hun-Hee;Seo Jang-Woo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • v.y2004m10
    • /
    • pp.83-86
    • /
    • 2004
  • Index adjusted ration method has been widely utilized in public construction secter for contract sum adjustment by price fluctuation. In this method. the Production Price Index are used for calculating the base ratio. but the PPI can't reflect the property of construction project in respect of the selected item and weight structure. In this research we prove the problem of using the index adjusted ration method in contract sum adjustment by price fluctuation. and improve it by using the construction cost index. which has the property of construction project. And the result. we figure out the difference between the PPI and CCI by $6.7\%$ in maximum value.

  • PDF

Performance Analysis of Pre-Construction Phase of CM at Risk Project in Public Sector (공공부문 시공책임형 CM 사업의 시공이전단계 성과분석)

  • Park, Bo-sung;Kim, Ok-kyue
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.2
    • /
    • pp.97-105
    • /
    • 2021
  • The CM at Risk project, which started with the aim of strengthening the global competitiveness of the domestic construction industry through innovation of ordering system, is being implemented in the form of pilot projects in the public sector. However, it seems that it is necessary to enact related laws and regulations to move to the formal ordering system, and the performance analysis of the project is still insufficient. In this paper, the effectiveness and reliability of the project were verified through the performance analysis of the Pre-Construction Service of the four pilot projects currently being implemented. The results of the study were analyzed in five areas including Team Building, Design Book, Construction Period, VE, and BIM. Through the interview survey, the problems were confirmed and improvement plans were presented. The results of this study are expected to be used as basic data for the legalization of ordering system to be implemented in the future.

A Study on the Practices of Landscape Planning & Design Services in Korea (조경계획.설계 기술용역의 수행실태에 관한 조사연구)

  • 권오준;심경구;김유일;고동완
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.21 no.4
    • /
    • pp.113-129
    • /
    • 1994
  • This study is designed to analyze the trends of professional services in Landscape Architecture during the past 5 years(1987-1991) in Korea. The data were collected from 1,117 projects from 56 engineering and landscape architecture firms. The findings are summarized as follows: 1) The projects have been increased annually by 19 percent in numbers and by 47 percent in money terms. 2) The main sources of projects are local governments and corporations. However the private sector comprise 31 percent in projects number and 46 percent in money terms. 3) The public park and tourism site development comprise a half of the projects. Recently recreational forest, golf, amusement and large housing site development have increased very rapidly. 4) In terms of workscope they are devided by 'complex' project which include extensive engineering works and 'simple' project which contain mostly planting design. The former include receational project with average 5 or 6 months contract period, and the later include housing and building site design with 2 or 3 months period. 5) Two types of consulting firms are typical. One is comprehensive engineering firms with urban planning section and few landscape section. The other is specialized professional firms with urban planning or landscape architecture. 50 percent of the project was done by comhensive engineering firms and 60 percent was done by urban planning section. The implication of these findings are broad: Firstly, We have to meet the demands in private secter mostly in recreation and leisure related projects. Secondly, landscape architects and project managers need more professional skills and coordination ability to deal with 'complex' projects. Thirdly, to enhance the quality of professional services it is required to have enough work time and higher service fee through legal and institutional enforcements.

  • PDF