Causal Loop Diagram for the Relation Between Degree of Field Safety Management and Productivity Based on Effectiveness Metrics : Focusing on Plumbing work in Mega Project

작업효율 지표 기반 안전관리행위 - 생산성 인과 모델 구축 - 메가 프로젝트 배관공사 중심으로 -

  • Chae, Yeon (Department of Architecture, Seoul National University) ;
  • Park, Moonseo (Department of Architecture, Seoul National University) ;
  • Cho, Jongwoo (Department of Architecture, Seoul National University) ;
  • Lee, Jinsol (Department of Construction Science, Texas A&M University) ;
  • Joo, Seonu (Samsung Electronics Co. Construction Planning Group) ;
  • Hong, Yeongmin (Department of Architecture, Seoul National University)
  • 채연 (서울대학교 건축학과) ;
  • 박문서 (서울대학교 건축학과) ;
  • 조종우 (서울대학교 건축학과) ;
  • 이진솔 (Texas A&M University 건축학과) ;
  • 주선우 (삼성전자 건설기획그룹) ;
  • 홍영민 (서울대학교 건축학과)
  • Received : 2020.11.04
  • Accepted : 2021.02.01
  • Published : 2021.03.31

Abstract

Unsafe working environments slow down working speed in that it takes a lot of time to respond in case of an accident, greatly reducing the productivity of construction work. Therefore, proper safety management that does not impede the productivity of construction works is a very important factor for successful construction project. However especially in mega project, the mutual effects of safety management and productivity are complex. Therefore, this study establishes a causal model between safety management and productivity influencing factors based on effectiveness metrics, and analyzes the effect of increased site congestion due to excessive personnel input, irregular safety measures and inefficient change of work schedules. The result of this study, is expected to contribute to enhancing the competitiveness of the construction industry as the basis for establishing a safety management plan that can secure appropriate productivity.

안전하지 못한 환경은 작업속도를 지연시키고, 사고 발생 시 대응에 많은 시간을 소요하게 하여 건설공사의 생산성을 크게 저하시킨다. 반면, 지나친 안전관리를 오히려 생산성 저해 요인으로 지적하는 연구도 존재한다. 따라서 건설공사의 생산성을 저해하지 않는 적절한 안전관리는 성공적 공사 수행에 매우 중요한 요인이나, 안전관리와 생산성 상호 간 미치는 영향이 복잡하기에 이에 대한 연구가 부족한 실정이다. 이에 본 연구는 시스템 다이내믹스를 활용하여 안전 관리와 생산성 영향 요인 간의 인과 모델을 구축하고, 효율성 지표를 통한 생산성 측정 및 분석을 진행한다. 이를 통해 과다 인원 투입으로 인한 현장 혼잡도 증가, 비정기적 안전 조치 및 비효율적 초과근무가 실제 작업에 투입되는 시간에 미치는 영향을 분석한다. 안전관리와 생산성의 상호 영향성에 대한 기초 연구인 본 연구의 결과물은, 적정 생산성 확보 가능한 안전관리 방안 수립의 기반으로서 건설산업 경쟁력 제고에 기여할 수 있을 것으로 기대한다.

Keywords

References

  1. Ahn, S.H., Yu, J.H., and Kim, C.D. (2008). "The Work Condition Management Method for Improvement of Work Efficiency." Journal of the Architectural Institute of Korea Structure and Construction Section, 24(4), pp. 183-190.
  2. Ahn, H.S. (2005). "A Study on the Improvement of the Safety Organizations for Construction Projects." Journal of the Architectural Institute of Korea Structure and Construction Section, 21(9), pp. 137-144.
  3. Ahn, S.J., Kim, T.H., and Kim, J.M. (2019). "An Analysis of Factors Affecting the Safety of Tower Crane in Construction Site." Proceedings of the Korean Institute of Building Construction Conference, pp. 44-45.
  4. Ahn, S.J., and Song, S.H. (2010). "Integrated Safety Risk Management System on Construction Site Using System Dynamics Approach." Journal of the Korea Safety Management and Science, 12(3), pp. 1-11.
  5. Charles, D. (2006). Handbook of OSHA Construction Safety and Health, 2nd ed, CRC Press, Florida.
  6. Cho, Y.W., Seo, J.H., and Yang, K.M. (2008). "A Study on Management System Design of Plant Evaluation for Safety and Productivity." Journal of the Korea Safety Management and Science, 10(1), pp. 197-204.
  7. Choi, B.J., Lee, H.S., Park, M.S., Kim, H.S., and Hwang, S.J. (2013). "4D BIM based Workspace Planning Process in Building Construction Project." Korean Journal of Construction Engineering and Management, KICEM, 14(5), pp. 175-187. https://doi.org/10.6106/KJCEM.2013.14.5.175
  8. Chung, B.H., and Kim, S.D. (2006) "Improvement Plan and Analysis of Construction Safety Management for Risk Management." Journal of the Korea Institute of Building Construction, 6(4), pp. 53-60. https://doi.org/10.5345/JKIC.2006.6.4.053
  9. De Macro A., Rafele C., and Thaheem M. (2016). "Dynamic Management of Risk Contingency in Complex Design-Build Projects." Journal of Construction Engineering and Management, 142(2), pp. 1-10.
  10. Dozzi, S.P., and Abourizk, S.M. (1993). Productivity in Construction (NRCC-37001). Ch.2, National Research Council Canada.
  11. Georgy, M.E., Chang, L., and Zhang, L. (2005). "Engineering performance in the US industrial construction sector: A publication of the american association of cost engineers." Cost Engineering, 47(1), pp. 27-36.
  12. Ha, G.J., Ha, M.S., and Yi, D.R. (2019). "A Study on the Effective Management Methods of Craftsmen through Job Environment and Productivity Analysis of Construction Craft Workers." Journal of the Architectural Institute of Korea Structure and Construction, 35(12), pp. 173-180.
  13. Hasanzadeh S., and Jesus M. (2020). "Productivity-Safety Model: Debunking the Myth of the Productivity-Safety Divide through a Mixed-Reality Residential Roofing Task." Journal of Construction Engineering and Management, 146(11), pp. 1-16.
  14. Hass, C., O'Connor, J.T., Tucker, R.L., Eickmann, J., and Fagerlund, W. (2000) "Prefabrication and Preassembly Trends and Effects on the Construction Workforce. Report No. 10." Center for Construction Industry Studies, University of Texas at Austin, Austin.
  15. Hu Y., Chan A., Le Y., and Jin R. (2015). "From Construction Megaproject Management to Complex Project Management: Bibliographic Analysis." Journal of Management in Engineering, 31(4), pp. 1-11.
  16. Jeon, Y.D., and Lee, J.S. (2001). "A Calculation Method on the Loss of Labor Productivity due to Change Orders." Journal of the Architectural Institute of Korea Structure and Construction, 18(8), pp. 91-98.
  17. Kang, J.Y., and Park, H.S. (2009). "Development of a Construction Performance Causal Map Using System Dynamics." Journal of the Korea Institute of Building Construction, 9(2), pp. 63-68. https://doi.org/10.5345/JKIC.2009.9.2.063
  18. Kim, B.S., Lee, Y.S., Hong, J.S., and Kim, J.J. (2008). "Development of the Strategy for Construction Production Improvement by System Thinking." Korean Journal of Construction Engineering and Management, KICEM, 9(6), pp. 156-163.
  19. Kim, J.Y., Choi, J.H., and Lee, S.H. (2011). "Factors Affecting the Losses of Domestic Construction Productivity and Strategies for Avoiding Them." Journal of the Architectural Institute of Korea Structure and Construction, 27(2), pp. 113-124.
  20. Kim, K.T. (2009). "A Study on the Implementation of USN Technologies for Safety Management Monitoring of Architectural Construction Sites." Journal of the Korea Institute of Building Construction, 9(4), pp. 103-109. https://doi.org/10.5345/JKIC.2009.9.4.103
  21. Kim, T., and Han, H. (2017). "A study on Change and Direction of Safety and Health Awareness of Construction Administration." GRI Review, 19(1), pp. 69-90.
  22. Kim, T.W., Lee, H.S., Park, M.S., and Yu, J.H. (2011). "Productivity Management Methodology Using Productivity Achievement Ratio." KSCE Journal of Civil Engineering, 15(1), pp. 23-31. https://doi.org/10.1007/s12205-011-0983-5
  23. Kim, W.B., Park, S.I., Lee, R.H., and Seo, J.W. (2018). "A Case Study on the Application of Machine Guidance in Construction Field." Journal of Korean Society of Civil Engineers, 38(5), pp. 721-731. https://doi.org/10.12652/Ksce.2018.38.5.0721
  24. Kwak, S.M. (1995). "Policy Analysis of Hanford Tank Farm Operations with System Dynamics Approach." Doctoral Thesis, MIT, Cambridge, MA, pp. 34-36.
  25. Lim, J.Y., Han, K.K., and Kim, S.K. (2008). "A Study of Client' s Role for Safety Management at Construction Sites." Journal of the Korea Institute of Building Construction, 8(5), pp. 75-83. https://doi.org/10.5345/JKIC.2008.8.5.075
  26. Lim, H.L., Lee, Y.D., Kim, J.H., and Kim, J.J. (2010). "A Study on Safety Management and Improve Method through Analysis of Disaster Cases in Construction,." Proceeding of Proceedings of Fall Annual Conference of the Korea Institute of Building Construction, 10(2), pp. 163-166.
  27. Pyo, Y.M., Bae, S.Y., Ryu, H.H., and Lee, S.B. (2005). "The Study on the Analyses of Factors Decreasing Construction Labor-Productivity Using AHP Method." Proceedings of the Korean Institute of Building Construction Conference, pp. 141-147.
  28. Shou W., Wang J., Wu P., and Wang X. (2020). "Value adding and non-value adding activities in turnaround maintenance process: classification, validation, and benefits." Production Planning & Control, 31(1), pp. 60-77. https://doi.org/10.1080/09537287.2019.1629038
  29. Son, C.B., and Lee, D.C. (2002). "An Analysis on the Factors Decreasing Productivity of Building Construction." Journal of Architectural Institute of Korea, 18(12), pp. 125-132.
  30. Sterman, J.D. (1992). "System Dynamics Modeling for Project Management." Sloan School of Management, (Aug., 2003).
  31. Thomas, H.R., and Daily, J. (1983). "Crew Performance Measurement via Activity Sampling." Journal of Construction Engineering and Management, 109(3), pp. 309-320. https://doi.org/10.1061/(ASCE)0733-9364(1983)109:3(309)
  32. Um, I.S., Lee, H.C., and Kang, J.Y. (2003). "Operational Efficiency Scheme of Mailing Center for Automation." Proceedings of the Korean Operations and Management Science Society Conference, pp. 999-1006.
  33. Xu, N., Liu Q., Ma L., Deng Y., Chang H., Ni G., and Zhou Z. (2020). "A Hybrid Approach for Dynamic Simulation of Safety Risks in Mega Construction Projects." Advances in Civil Engineering, 2020, pp. 1-12.