• Title/Summary/Keyword: Integrated BIM-based Standard Breakdown Structure

Search Result 4, Processing Time 0.016 seconds

A Development of Unified and Consistent BIM Database for Integrated Use of BIM-based Quantities, Process, and Construction Costs in Civil Engineering

  • Lee, Jae-Hong;Lee, Sung-Woo;Kim, Tae-Young
    • Journal of the Korea Society of Computer and Information
    • /
    • v.24 no.2
    • /
    • pp.127-137
    • /
    • 2019
  • In this study, we have developed a calculation system for BIM-based quantities, 4D process, and 5D construction costs, by integrating object shape attributes and the standard classification system which consist of Cost Breakdown System(CBS), Object Breakdown System(OBS) and Work Breakdown System(WBS) in order to use for the 4 dimensional process control of roads and rivers. First, a new BIM library database connected with the BIM library shape objects was built according to the CBS/OBS/WBS standard classification system of the civil engineering field, and a integrated database system of BIM-based quantities, process(4D), and construction costs(5D) for roads and rivers was constructed. Nextly, the process classification system and the cost classification system were automatically disassembled to the BIM objects consisting of the Revit-family style elements. Finally, we added functions for automatically generating four dimensional activities and generating a automatic cost statement according to the combination of WBS and CBS classification system The ultimate goal of this study was to extend the integrated quantities, process(4D), and construction costs(5D) system for new roads and rivers, enabling the integrated use of process(4D) and construction costs(5D) in the design and construction stage, based on the tasks described above.

A measure for activating BIM by actual application analysis of integrated utilization process of quantity, process(4D), and construction cost(5D) in view of life-cycle

  • Lee, Jae-Hong;Kim, Tae-Young
    • Journal of the Korea Society of Computer and Information
    • /
    • v.25 no.12
    • /
    • pp.1-15
    • /
    • 2020
  • In this paper, we propose a novel method for converting the existing 2D processes in the design and construction phase of civil engineering, to the future BIM-based processes. First, we compare and analyze the actual application processes of the outputs of the existing 2D method and the outputs of the 3D BIM method, for the whole process of BIM design of earthworks and road structures and integrated utilization of quantity, process(4D) and construction cost(5D), in view of life-cycle. The proposed method acquire the outputs of the design phase integrating IFC international common standard file information and CBS/OBS/WBS standard classification scheme information, and acquire the outputs of the construction stage by using an integrated utilization module for quantity, process(4D) and construction cost(5D). Ultimately, we intend to commercialize the step by step technologies for BIM design and construction in civil engineering by using the proposed method.

A Study on Applying Information Framework for BIM Based WBS -Focusing on Civil Construction- (BIM기반의 WBS 구축을 위한 정보프레임워크 도입방안 연구 -토목사업의 적용을 중심으로-)

  • Nam, Jeong-Yong;Jo, Chan-Won;Park, So-Hyun
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.18 no.11
    • /
    • pp.770-777
    • /
    • 2017
  • Building information modeling (BIM) has been receiving attention as an integrated information model instead of CAD since the 2000s. BIM technology was first used in the architectural field and was later introduced to the civil engineering field. However, the government announced a plan for the application of BIM to 20% of all SOC projects from 2020, so the adoption of BIM technology is expected to accelerate. In order to successfully adopt BIM, a systematic structure should be supported for integrated design information and implementation technology. Also, it is important to establish the relationship between information systems because many complicated factors are intertwined in the construction industry. In this study, we propose a framework for constructing integrated information through identifying the information relations for introducing BIM in the civil engineering industry. We applied this framework to a bridge project to confirm its effectiveness. This study can be applied to the integrated management of the construction process and costs by introduction of a work breakdown structure (WBS) to BIM. In addition, this study is expected to contribute to the adoption of BIM in the civil engineering field through the proposal of information system standardization in this field.

A Standardized BIM Framework for Supporting Life-cycle Business Process for Port & Harbour Facilities (항만시설의 생애주기 업무 지원을 위한 BIM 표준 프레임워크 구축)

  • Moon, Hyoun-Seok;Won, Ji-Sun;Shin, Jae-Young
    • Journal of KIBIM
    • /
    • v.8 no.4
    • /
    • pp.49-59
    • /
    • 2018
  • Recently, the application of BIM for port & harbour facilities has been increasing, as it is widely applied to the infrastructure field both at domestic and abroad. However, the port and harbour projects still have very poor facilities information management system and the application level of BIM is very low compared to other facilities. Even if BIM is applied for those project, it is very difficult to determine in advance what information is needed without an accurate understanding of the business process. The purpose of this study is to develop a BIM framework for port & harbour facilities and to examine its applicability. To do this, we structured the classification of the port & harbour facilities and constructed object-based classification system based on ISO12006-3 standard. We also derived the BIM framework requirements from the viewpoint of process, standard, interface, and information, and confirmed the linkage of the BIM object classification system in the framework item. The applicability of the BIM framework for inspection process cases of port & harbour was examined. Accordingly, this study can solve requirement setting method, which is the non - procedural and non - systematic project information, in the BIM application process of the port & harbour project with the BIM framework. In addition, the framework is expected to be integrated into the system to play a key role in the selection of project objectives, and the ability to clearly identify the information requirements required by the BIM manager to perform the project.