Plan of BIM-based Quantity Take-off for Nuclear Power Plant Decommissioning

BIM을 활용한 원전 해체 물량산출 방안

  • Jung, In-Su (Construction Policy Research Institute, Korea Institute of Civil Engineering and Building Technology(KICT)) ;
  • Won, Ji-Sun (ICT Convergence and Integration Research Institute, Korea Institute of Civil Engineering and Building Technology(KICT))
  • 정인수 (한국건설기술연구원 건설정책연구소) ;
  • 원지선 (한국건설기술연구원 ICT융합연구소)
  • Received : 2015.08.12
  • Accepted : 2015.09.11
  • Published : 2015.09.30

Abstract

Nuclear power plant decommissioning has attracted attention according to the shutdown decision of Kori 1 which is Korea's first nuclear power plant. Nuclear power plant decommissioning is the one who never experienced ever in our country. So, its process is difficult and time-consuming. In addition, it is difficult to determine the decommissioning quantity. This study proposed the plan that can be used in quantity take-off for nuclear power plant decommissioning using BIM technology being utilized in recent construction industry. As a result, we suggested the method of BIM-based quantity take-off such as the selection decommissioning method and process, setting up of BIM modeling environment, establishment of OBS & WBS, integrated BIM modeling, the definition of quantity property. The proposed plan can be utilized usefully from when permanent stopping nuclear power plant occurs intensively. Furthermore, the overseas nuclear power plant decommissioning project order also are expected through technology securement based on this plan.

우리나라 최초의 원자력발전소인 고리 원전 1호기의 폐쇄가 결정됨에 따라 원전 해체가 화두가 되고 있다. 원전 해체는 우리나라에서 한번도 경험해 보지 못한 일로 해체 과정도 어렵고 시간도 많이 소요된다. 그 일부분인 해체물량 또한 파악이 어렵다. 본 연구에서는 최근 건설산업에 많이 활용되고 있는 BIM 기술을 원전 해체 물량산출에 활용할 수 있는 방안을 제시하였다. 그 결과, 원전 해체 공법선정 및 공정 확립, BIM 모델링 환경 준비, 작업분류체계 구축, 객체분류체계 구축, BIM 통합모델 작성, BIM 객체에 물량 속성 배분 등의 방안을 제시하였다. 제시한 방안은 영구정지 대상 원전이 집중적으로 발생하는 시기부터 유용하게 활용될 수 있다. 이에 기반한 기술확보를 통해 나아가 해외 원전 해체 사업 수주에도 유리하게 작용할 것으로 기대된다.

Keywords

References

  1. In-Su Jung, Woo-Jung Kim, "Analysis of the Possibility of Required Resources Estimation for Nuclear Power Plant Decommissioning Applying BIM", Transactions of the Korean Nuclear Society Spring Meeting, 2014.
  2. In-Su Jung, Woo-Jung Kim, "Direction for the Estimation of Required Resources for Nuclear Power Plant Decommissioning based on BIM via Case Study", Transactions of the Korean Nuclear Society Spring Meeting, 2014.
  3. CIC(Cooperative Research Centre for Construction Innovation), "National Guidelines for Digital Modeling", 2009.
  4. NIBS(National Institute of Building Science), "United States National Building Information Modeling Standard", 2007.
  5. U.S. General Service Administration(GSA), "BIM Guide Overview", 2003.
  6. buildingSMART Korea Website, Available From : http://www.buildingsmart.or.kr (accessed August., 10, 2015)
  7. Chang-Hee Lee, Seong-Ah Kim, Sangyoon Chin, "An Index for Measuring the Degree of Completeness of BIM-based Quantity Take-Off", Korean journal of construction engineering and management, v.12 no.6, pp.79-92, November, 2011. DOI: http://dx.doi.org/10.6106/KJCEM.2011.12.6.79
  8. Jae-Choul Shin, Ju-Hwan Hwang, Sang-Gyu Lee, Si-Won Lee, "BIM based Reliability Analysis and Automated Quantity Calculation", Korean Society of Hazard Mitigation, vol. 12, no.3, pp. 49-55, June, 2012. DOI: http://dx.doi.org/10.9798/KOSHAM.2012.12.3.049
  9. Jae-Woo Park, Gi-Wook Ha, Won-Hwa Hong, "A Study on Database Construction of C&D Waste Using BIM on the Demolition Stage", Proceeding of Annual Conference of the Architectural Institute of Korea, v.33 no.2, pp.345-346, October, 2013.
  10. Chang-Hak Kim, "Development of Integrated Computer System for Quantifying and Managing of Demolition Waste", Korean journal of construction engineering and management, v.12 no.1, pp.133-140, 2011. DOI: http://dx.doi.org/10.6106/KJCEM.2011.12.1.133
  11. Korea Hydro & Nuclear Power Co., "A study on the mid to long term planning for domestic NPPs decommissioning", pp. 121-131, 2011.