Journal of Digital Convergence (디지털융복합연구)
- Volume 10 Issue 10
- /
- Pages.339-345
- /
- 2012
- /
- 2713-6434(pISSN)
- /
- 2713-6442(eISSN)
DOI QR Code
Backlog Factoring : Extension of Task Factoring for Reuse in Scrum Method
백로그 팩토링 : 스크럼 방법에서 재사용을 위한 태스크 팩토링의 확장
- 김지홍 (가천대학교 컴퓨터공학과)
- Received : 2012.10.27
- Accepted : 2012.11.20
- Published : 2012.11.30
Abstract
Despite agile methods and software reuse being distinct approaches, there has been a growing amount of research on combining these approaches. Although Scrum is one of the most popular agile methods, reuse has not been actively supported. In this paper, we identify a new type of reusable Scrum assets, simplify the backlog process and propose a backlog factoring technique by extending task factoring to support reuse in the Scrum method. In addition, we can apply the proposed technique and show prototyping of backlog reuse in e-business applications.
애자일 방법과 소프트웨어 재사용 기술은 서로 다른 접근방법이지만 통합을 통하여 상호 보완하려는 여러 연구가 나타나고 있다. 애자일 소프트웨어 개발 방법 가운데 가장 높은 인기와 사용에도 불구하고, 스크럼에서의 재사용 지원이 부족하다. 본 연구는 기존의 태스크 팩토링 기술을 스크럼 방법에 확장하여 스크럼 재사용 자산을 식별하고 이를 단순화하여 스크럼에서의 재사용이 지원되는 백로그 팩토링 기술을 제안하였다. 아울러, 제안된 기술을 전자 상거래 응용에 적용하여 백로그 재사용의 프로토타이핑을 보일 수 있었다.
Keywords