References
- Cohen, I., Mandelbaum, A., and Shtub, A. (2004), Multiproject Scheduling and Control: A process-based comparative study of the Critical Chain Methodology and Some Alternatives, Project Management Journal, 35(2), 39-50.
- Goldratt, E. M. (1990), Theory of Constraints, North River Corp., Great Barington, MA.
- Goto, H. (2010), Modelling methods based on discrete algebraic systems. In: Goti, A. (ed.), Discrete Event Simulations, Sciyo, Rijeka, Croatia, 35-62.
- Heidergott, B. (2006), Max-Plus Linear Stochastic Systems and Perturbation Analysis, Springer, New York, NY.
- Heidergott, B., Jan Olsder, G., and van der Woude, J. W. (2006), Max Plus at Work: Modeling and Analysis of Synchronized Systems, Princeton University Press, Princeton, NJ.
- Herroelen, W., Leus, R., and Demeulemeester, E. (2002), Critical chain project scheduling: do not oversimplify, Project Management Journal, 33, 46-60.
- Kasahara, M., Takahashi, H., and Goto, H. (2009), On a buffer management policy for CCPM-MPL representation, International Journal of Computational Science, 3(6), 593-606.
- Leach, L. P. (2005), Critical Chain Project Management, Artech House, Boston, MA.
- Takahashi, H., Goto, H., and Kasahara, M. (2009), Toward the application of a critical-chain-projectmanagement- based framework on max-plus linear systems, Industrial Engineering and Management Systems, 8(3), 155-161.
- Truc, N. T. N., Goto, H., Takahashi, H., and Yoshida, S. (2011), Enhanced framework for determining time buffers in the MPL-CCPM representation, International Journal of Information Science and Computer Mathematics, 4(1), 1-18.
- Truc, N. T. N., Goto, H., Takahashi, H., Yoshida, S., and Takei, Y. (2012), Critical chain project management based on a max-plus linear representation for determining time buffers in multiple projects, Journal of Advanced Mechanical Design, Systems, and Manufacturing, 6(5), 715-727. https://doi.org/10.1299/jamdsm.6.715
- Tukel, O. I., Rom, W. O., and Eksioglu, S. D. (2006), An investigation of buffer sizing techniques in critical chain scheduling, European Journal of Operational Research, 172(2), 401-416. https://doi.org/10.1016/j.ejor.2004.10.019
- Yoshida, S., Takahashi, H., and Goto, H. (2010), Modified max-plus linear representation for inserting time buffers, Proceedings of the IEEE International Conference on Industrial Engineering and Engineering Management, Macau, China, 1631-1635.
- Yoshida, S., Takahashi, H., and Goto, H. (2011), Resolution of time and worker conflicts for a single project in a max-plus linear representation, Industrial Engineering and Management Systems, 10(4), 279- 287. https://doi.org/10.7232/iems.2011.10.4.279
Cited by
- A Practical 1 Page Contextual Diagram for Monitoring Multiple Projects: An Empirical Study of an IT Organization vol.17, pp.5, 2016, https://doi.org/10.7472/jksii.2016.17.5.121