Critical Chain Project Management as a New Paradigm for Reducing the Project Delivery Time (프로젝트 일정 단축을 위한 새로운 경영 패러다임 Critical Chain Project Management(CCPM))

  • Jang, Seong-Yong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.68-74
    • /
    • 2007
  • Critical Chain Project Management(CCPM) is a new project management system paradigm which maintains the advantages of PERT/CPM and improves the shortcomings of it. In CCPM the task durations are determined as 50% time estimates, ie average time discarding the their contingency. CCPM determines the critical chain the constraint of a projects considering the logical precedence relationship and resource conflict resolution. Project buffer is located at the end of critical chain to absorb the variations of critical chain. The size of project buffer is usually calculated as the half of the sum of critical chain length. Also feeding buffer is inserted after each non-critical chain which feeding into the critical chain to prevent the time delay of critical chain from uncertainties of non-critical chains. Resource buffer can be utilized to improve the availability of resources of critical chain. Buffer management is a project execution and control mechanism. Buffers are classified into 3 zones. They are OK zone, Watch and Plan zone and Expediting zone. If the project status is within Watch and Plan zone, contingency plan is established. And if it changes into Expediting zone, the preplanned contingency plan are executed to recover the time delay. In CCPM the workers are asked to work with relay runner work mechanism that they work fast if possible and report their completion to project manager for the succeeding task to start as soon as possible. The task durations are not considered as the promised time schedule. The multi-tasking is prohibited.

  • PDF

Application of Critical Chain Project Management to Construction Project by a Case Study (사례연구를 통한 건설프로젝트에 CCPM의 적용)

  • Park Jeong-Hyun;Lee Young-Dae;Kim Young;Kim Sa-Myung;Park Hyeok
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.274-277
    • /
    • 2003
  • The Theory of Constraints (TOC) is an approach and a philosophy that is used to develop specific management techniques. It was first popularized by the novel, The Goal, that applied the principles to operations management. Since 1997 it has found application in two areas within project management. The first application is scheduling of a single project to reduce project duration and simplify project control. there is a further application to allocate resources that are shared by concurrent project. It is the objective of this paper to explore the fundamentals of critical chain and to pursue an application of critical chain method to construction project by a case study.

  • PDF

Toward the Application of a Critical-Chain-Project-Management-based Framework on Max-plus Linear Systems

  • Takahashi, Hirotaka;Goto, Hiroyuki;Kasahara, Munenori
    • Industrial Engineering and Management Systems
    • /
    • v.8 no.3
    • /
    • pp.155-161
    • /
    • 2009
  • We focus on discrete event systems with a structure of parallel processing, synchronization, and no-concurrency. We use max-plus algebra, which is an effective approach for controller design for this type of system, for modeling and formulation. Since a typical feature of this type of system is that the initial schedule is frequently changed due to unpredictable disturbances, we use a simple model and numerical examples to examine the possibility of applying the concepts of the feeding buffer and the project buffer of critical chain project management (CCPM) on max-plus linear discrete event systems in order to control the occurrence of an undesirable state change. The application of a CCPM-based framework on a max-plus linear discrete event system was proven to be effective.

REVOLUTIONS OF CONSTRUCTION ORGANIZATIONS TOWARDS GREEN BUILDING PRJECTS

  • Po-Han Chen;Yuan-Yuan Li
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.558-565
    • /
    • 2009
  • In recent years, the demand for green buildings is growing fast due to legislative and social pressures. Construction organizations, which play an important role in promoting building industry growth, are facing with challenges on how to adapt themselves to enhance sustainability of the buildings. In this paper, the green value chain and system frameworks, an extend application of Porter's value chain and system models, are introduced. Based on deep analysis of the green value chain and system frameworks, a revolution model for construction organizations towards green building is created. Management factors critical for a successful green building project, at the firm and project organization level, are extracted. Furthermore, external critical relationships are also identified. Fully understanding of these management factors and the model can help and enable practitioner to know what new capabilities should be deployed and developed in the long run for maximizing sustainability.

  • PDF

Application of CCPM to Construction Project (건설프로젝트에 CCPM의 적용)

  • Kim Young;Lee Young-Dae;Kim Ok-Su;Kim Sung-Hwan;Park Hyeok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.3 s.15
    • /
    • pp.95-101
    • /
    • 2003
  • The Theory of Constraints (TOC) is an approach and a philosophy that is used to develop specific management techniques. It was first popularized by the novel, The Coal, that applied the principles to operations management. Since 1997 it has found application in two areas within project management The first application is scheduling of a sing1e project to reduce project duration and simplify project control. there is a further application to allocate resources that are shared by concurrent project. It is the objective of this paper to explore the fundamentals of critical chain and to pursue an application of critical chain method to construction project by a case study.

An Optimal Scheduling Method Using Probability on the Estimation of Construction Duration (확률적 공기산정에 의한 공정계획 합리화 방안)

  • Kim Sang-Joong;Lee Jae-Soeb
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.6 s.22
    • /
    • pp.72-79
    • /
    • 2004
  • Critical Path-based project management has been applied to the construction projects with a goal of delivering projects within original costs and time estimates. These current project management methods, rarely make early finishes of construction Projects. In addition, current practices on time management seems not to take advantages of early finishes concepts due to student syndrome and Parkinson's Law, This research study applied the Theory of Constraints(n) in the estimation of construction project duration. While the TOC includes variety of management techniques, in this study, it refers to critical chain that has been used to develop the specific management technique in scheduling. The concept of critical chain is applied to this study to solve the problems associated with the current scheduling method. The efforts focus to solve the p개blems associated with current construction project scheduling methods by adopting both stochastic estimation technique and the concept of schedule buffer,

Optimal Scheduling based on Probabilitic Estimation of Construction Duration (확률적 공기산정에 의한 공정 합리화 방안)

  • Kim Sang-Joong;Lee Jae-Soeb
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.383-387
    • /
    • 2003
  • Construction project has many problem such as delay of the appointed date delivery, over budget, wether and site conditions. When several activities are influenced by the same factor, their duration may be delayed. This paper deals with the problem of construction duration estimating and schedule variation on the construction project. The theory of constraints technique for project management is referred to 'Critical Chain' technique. This paper shows optimal scheduling plan and time management technique, used probability construction duration estimating and scheduling buffer based on the critical chain project management.

  • PDF

Development of Synchro-EVM System Integrating TOC-CPM and EVM (TOC-CCPM과 EVM을 통합한 Synchro-EVM 시스템 개발 연구)

  • Lee, Do-Hern;Jang, Gil-Sang
    • Journal of the Korea Safety Management & Science
    • /
    • v.19 no.4
    • /
    • pp.291-299
    • /
    • 2017
  • Recently, many business and government organizations have benefitted by executing projects using TOC-CCPM(Theory of Constraints-Critical Chain Project Management). In parallel, Earned Value Management(EVM) metrics have also become popular. Many organizations like US government requires that all large projects measure and report project progress status using EVM. Thus, project management in business fields such as plant construction, IT development, ship building need to integrate TOC-CCPM and EVM in oder to keep and reduce the delivery date of projects for improvement of customer satisfaction and enlargement of business opportunity. This paper proposes the scheme and case of developing the Synchro-EVM system which TOC-CCPM and EVM are connected.

Resolution of Time and Worker Conflicts for a Single Project in a Max-Plus Linear Representation

  • Yoshida, Shotaro;Takahashi, Hirotaka;Goto, Hiroyuki
    • Industrial Engineering and Management Systems
    • /
    • v.10 no.4
    • /
    • pp.279-287
    • /
    • 2011
  • This research develops a framework for resolving time and worker conflicts in the Critical Chain Project Management (CCPM) method, expressed in the form of a Max-Plus Linear (MPL) system. Our previous work proposed a method for resolving time conflicts. However, in practical cases, both time and worker conflicts may occur. Hence, we propose a method for resolving both time and worker conflicts for a single project. We first consider how to detect a resource conflict. Then, we define an adjacency matrix to resolve the detected conflicts. Using the proposed method, we confirm that the resource conflict can be resolved through a numerical example.

A Study on Schedule Management in Construction Projects by CCPM (CCPM을 이용한 건설사업 일정관리에 관한 연구)

  • Park Young-Min;Kim Soo-Yong;Kim Ki-Young
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.5 s.21
    • /
    • pp.84-92
    • /
    • 2004
  • Construction work varies with the project types. However, the success of all project types depends upon three conditions i.e. schedule, quality and cost. If these three conditions are fulfilled, then project said to be successful. In this paper, scheduling of a construction Project has been dealt with the application of CCPM method. CCPM has been introduced as a new theory in construction industry in 1997 at the United States, but its application is still insufficient in domestic field due to the absence of systematic study, A simulation has been conducted in a Bridge construction project to validate the possibility of CCPM in order to complement PERT/CPM in construction field. The result of study shows that the CCPM could be effective to reduce the project time duration than existing PERT/CPM technique.