원자력 발전소 고압터빈의 교축여유(Throttle Margin) 최적화 연구

Study on Optimization of Throttle Margin in High Pressure Turbine of Nuclear Power Plant

  • 고우식 (한국전력공사 전력연구원)
  • 투고 : 2010.05.27
  • 심사 : 2010.07.12
  • 발행 : 2010.08.31

초록

In the present study, optimization of throttle margin for high pressure turbine to be retrofitted or partially modified for power uprating or life extension in nuclear power plant, has been performed to increase the electrical output. Throttle margin for high pressure turbine is required to maintain all the time the rated power by opening more of governor valves whenever inlet pressure is decreased due to the tube plugging of steam generator. If throttle margin of high pressure turbine is too much compared to remaining lifetime, loss of electrical output due to pressure drop of governor valves is inevitable. On the contrary, if it is too little, the rated power operation can not be accomplished when inlet pressure of high pressure turbine is dropped after many years operation. So, throttle margin for high pressure turbine in nuclear power plant is compromised considering for the degradation of steam generator, governor valve capacity, manufacturing tolerance of high pressure turbine, future plan of power uprating, and remaining lifetime of power plant.

키워드

참고문헌

  1. 고우식, 김계연, 이우광, 2006.7, "OO 1,2호기 터빈 교체 타당성 기술검토 용역 보고서", 한국전력공사 전력연구원.
  2. 고우식, 김계연, 이우광, 2007.8, "가동원전 출력증강 기술개발 터빈-발전기 분야 보고서", 한국전력공사 전력연구원.