Abstract
This study aims to make improvements to the standard estimation process used to estimate reasonable costs for construction work, and to suggest a work crew based estimation using a new cost estimation model. In addition, work crew shift combination and construction process were systematically organized in order to improve the estimation technique and the construction capability of the cement liquid waterproofing work for apartment buildings. In addition, in terms of manpower and productivity, analyses were performed on the cement liquid waterproofing work for apartment buildings with net areas between $84-85m^2$ and $125-184m^2$, and the results were then compared with those calculated using the conventional work-crew based estimation method. Through this study, when the results of this study and those calculated by the conventional method were compared, for apartments with the net area of $84-85m^2$, the differences between specialists were shown to be 1.91 times to 2.13 times on average, while they were 8.82 times to 9.52 times between normal workers on average. For apartments with the net area of $125-184m^2$, the differences betweenspecialists were shownto be 1.89 times to 2.07 times on average, and 8.57 times to 9.38 times on average between normal workers.
본 연구에서는 건설공사의 합리적인 공사비 산정을 위하여 기존 표준품셈의 문제점을 개선하고, 새로운 적산 모델을 도입한 작업조 기반 표준품셈을 제안하고자 한다. 그리고 공동주택 시멘트 액체방수 공사를 대상으로 건설공사의 적산기술과 시공능력을 향상할 수 있도록 작업조구성과 시공프로세스를 체계화하였다. 또한 공동주택에서 욕실부분 시멘트 액체방수 공사를 대상으로 전용면적 $84{\sim}85m^2$, 전용면적 $125{\sim}184m^2$의 노무량 및 생산성을 분석하고 현행 표준품셈과 작업조 기반 품셈의 특징을 비교 분석하였다. 본 연구를 통하여 공동주택 시멘트 액체방수 공사의 현행 표준품셈과 작업조 기반 품셈을 서로 비교하였을 때, 전용면적 $84{\sim}85m^2$에서는 방수공은 평균 1.91~2.13배, 보통인부는 평균 8.82~9.52배의 차이가 있었다. 그리고 전용면적 $125{\sim}184m^2$에서는 방수공은 평균 1.89~2.07배, 보통인부는 평균 8.57~9.38배의 차이가 나타났다.