Plant project is a complex project that consists of civil engineering, building, mechanical and electronic works. The schedule management is one of important factors in plant project because the construction duration of the project is very short comparing with the other construction projects. Specially, 4D CAD system needs to visualize construction schedule information in those complex projects. This study suggests methodologies for improving 4D CAD functions by considering those project characteristics. To develop a plant 4D CAD system, this study includes to develop new functions by analyzing actual schedule information from the plant construction sites.

플랜트공사는 토목, 건축, 기계, 전기 공종들이 연동되어 작업이 진행되는 복합공종이다. 또한 일반 공사와 비교시 매우 짧은 공기에 대규모의 공사를 수행하여야 하는 공정상의 특징을 갖고 있다. 이러한 특성들로 인하여 플랜트공사에서 공정관리는 매우 중요한 요소가 되고 있다. 4D CAD에 의한 공정정보의 시각화는 이러한 복합공정에서 더욱 필요성을 갖게 된다. 본 연구에서는 플랜트공사의 특성을 고려한 4D CAD시스템 기능 구성방법론과 실제 시스템 개발을 시도한다. 이를 위하여 플랜트공사 현장의 공정작업 특성을 분석한 후 4D CAD 기능을 구성함으로써, 기존 시스템에서 시도되지 않은 플랜트공사에 특화된 공정시각화 기능구축을 시도하고 있다.

Keywords

References

  1. 유홍석 (2006), 플랜트 산업의 프로젝트 매니지먼트, 한국 플랜트학회
  2. 한국플랜트정보기술협회 (2004), 플랜트 엔지니어링 소프 트웨어 가이드, BB미디어
  3. Kiminobu Kodama (2005), UML 모델링 본질, 성안당
  4. McKinney, K., Kim, J., Fischer, M., and Howard, C. (1996). 'Interactive 4D-CAD.' Proc., 3rd Congr. in Comp. in Civ. Engrg., Jorge Vanegas and Paul Chinowsky, eds., ASCE, New York, 383-389
  5. B. Koo, and Fischer, M. (2000).'Feasibility study of 4D CAD in commercial construction'. , J. Constr. Engrg. and Mgmt., Vol. 126, No.4, pp. 251-260 https://doi.org/10.1061/(ASCE)0733-9364(2000)126:4(251)
  6. K. W. Chau, M. Anson, and J. P. Zhang (2004). 'Four-Dimensional Visualization of Construction Scheduling and Site Utilization.' J. Constr. Engrg. and Mgmt., Volume 130, Issue 4, pp. 598-606 https://doi.org/10.1061/(ASCE)0733-9364(2004)130:4(598)
  7. Zaki Mallasi and N.N. Dawood (2002).'Registering Space Requirements of Construction Operations Using Site-PECASE Model.', CIB w78 conference
  8. Zaki Mallasi (2006).'Dynamic quantification and analysis of the construction workspace congestion utilizing 4D visualization.' Automation in Construction, pp. 640-655
  9. IPIMS (2006). http://www.koper.co.kr/, KOPEC
  10. V-CPM (2007). http://www.geont.co.kr/, Geont
  11. Schedule Simulator (2006). http://www.bentley.com/, Bentley
  12. FourDscape (2006). http://www.bal4.com/, Balfour Technologies
  13. Project 4D (2006). http://www.commonpointinc.com/, Commonpoint
  14. Jet Stream Timeliner (2007). http://www.navisworks.com/, Navisworks