Abstract
Heavy equipment is a very important factor for successful construction implementation. Also, the cost for heavy equipment is a major part of construction cost. Therefore, the estimation of equipment cost is a critical job in the construction planning phase. A formula for production rates shown in 'Standard Unit Labor' has been used to estimate construction equipment capability per hour and cost. Although the performance of equipment has been improved, the efficiency rates in the formula are not updated lately. Therefore, this research performed several site visits to measure construction equipment working time and then calculates the efficiency rates for hydraulic backhoe, loader, and dump truck. The results show that the measured efficiencies of backhoe and loader are higher than current ones and vice versa for dump truck. This research proposes the needs for a standardized calculation formula and systematic and long-term data collection and measurement for updating efficiency rates for heavy equipment.
건설기계는 건설사업의 성공적인 수행을 위한 중요한 요인이다. 그리고 건설기계에 소요되는 비용이 건설공사비에서 차지하는 비중이 크다. 따라서 건설기계 비용의 산정은 건설계획 단계에서 중요한 업무이다. 이를 위해서 우리나라는 표준 품셈에 제시된 건설기계 시공능력 산정식을 이용하여 건설기계의 시간당 작업량을 계산하는 방식을 활용하고 있다. 그러나 건설기계의 성능은 개선되고 있으나 시공능력 산정식에서 활용되고 있는 작업효율은 이를 반영하지 못하는 실정이다. 이에 본 연구는 유압식 백호, 로우더, 덤프트럭을 대상으로 현장실사를 통해 작업효율을 실측하였다. 그 결과 백호와 로우더는 현재 활용중인 작업효율보다 현장실사 값이 높게 나타났으며, 덤프트럭은 낮게 나타났다. 본 연구결과를 바탕으로 건설기계의 작업효율 표준 산정식에 대한 정의가 수립되어야 하며, 체계적이고 장기적인 조사를 거쳐 작업효율의 개정이 필요할 것으로 사료된다.