References
- Barlow, R. E. and Hunter, L. C.(1960), 'Preventive MaintenancePolicies,' Operations Research, Vol. 9,pp. 90-100
- Brown, M. and Proschan, F. (1983),'Imperfect Repair,' J. of AppliedProbability, Vol. 20, pp. 851-859 https://doi.org/10.2307/3213596
- Canfield, R. V. (1986), 'CostOptimization of Periodic PreventiveMaintenance,' IEEE Trans. Reliability,Vol. 35, pp. 78-81 https://doi.org/10.1109/TR.1986.4335355
- Chan, P. K. W. and Down, T. (1978),'Two Criteria for PreventiveMaintenance,' IEEE Trans. Reliability,Vol. 35, pp. 272-273
- Charles, A., Floru, I., Azzaro-Pantel,C., Pibouleau L. and Domenech S.(2003), 'Optimization of preventivemaintenance strategies in amultipurpose batch plant: applicationto semiconductor manufacturing,'Computers & Chemical Engineering,Vol. 27, No. 4, pp. 449-467 https://doi.org/10.1016/S0098-1354(02)00216-8
- Fontenot, R. A. and Proschan, F.(1984), 'Some Imperfect Maintenance Model' in Reliability Theory andModels, AP, New York
- Lai, K. K., Leung, K. N. F., Tao, B.and Wang, S. Y.(2000), 'Practices of preventive maintenance andreplacement for engines: A casestudy,' European Journal ofOperational Research, Vol. 124, No. 2,pp. 294-306 https://doi.org/10.1016/S0377-2217(99)00382-3
- Lie, C. H. and Chun, Y. H. (1986),'An Algorithm for Preventive Maintenance Policy,' IEEE Trans. Reliability, Vol. 35, pp. 71-75 https://doi.org/10.1109/TR.1986.4335352
- Murthy, D. N. P. and Nguyen, D. G.(1981), 'Optimum Age-Policy withImperfect Preventive Maintenance,'IEEE Trans. Reliability, Vol. 30, pp.80-81 https://doi.org/10.1109/TR.1981.5220976
- Nakagawa, T. (1979), 'Optimal PolicyWhen Preventive Maintenance IsImperfect,' IEEE Trans. Reliability,Vol. 28, pp. 331-332 https://doi.org/10.1109/TR.1979.5220624
- Nakagawa, T. (1980), 'A Summaryof Imperfect Preventive MaintenancePolicies with Minimal Repair,'R.A.I.R.O. Operations Research, Vol.14, pp. 249-255
- Nakagawa, T. (1986), 'Periodic andSequential Preventive MaintenancePolicies,' J. of Applied Probability,Vol. 23, pp. 536-542 https://doi.org/10.2307/3214197
- Nakagawa, T. (1988), 'SequentialImperfect Preventive MaintenancePolicies,' IEEE Trans. Reliability, Vol.37, No. 3, pp. 295-298 https://doi.org/10.1109/24.3758
- Park, D. H., Jung, G. M. and Yum,J. K.(2000), 'Cost Minimization forPeriodic Maintenance Policy of aSystem Subject to SlowDegradation,' Reliability Engineeringand System Safety, Vol. 68, pp.105-112 https://doi.org/10.1016/S0951-8320(00)00012-0