A study on the improvement in decision making analysis for the selection of tunnel construction method

터널건설공법 선정을 위한 의사결정기법의 개선방안 연구

  • Published : 2002.12.01

Abstract

Recently, for the purpose of choosing reasonable and economical construction, the decision making analyses, such as VE (Value Engineering) and LCC (Life Cycle Cost), are generally performed. But, these methods have some limitations for the application to subway tunnel construction method. So, the AHP (Analytical Hierarchy Process) analysis is applied to determine relative importance for obtaining objectivity in quantitative analysis. And, the LCSC (Life Cycle Social Cost) method is developed to account for the social loss and risk by tunnel construction. From the case of the subway ${\bigcirc}{\bigcirc}$ lot, those methods are very useful to decision making analysis. And, in that case, both quantitative and quantitative analysis appraisement, the drilling and blasting method is evaluated useful alternative proposal in comparing with the cut and cover method.

지하철 터널의 합리적인 건설공법 채택을 위해 최근 건설공법의 선정에 적용되고 있는 VE 및 LCC기법의 문제점을 분석하여 개선안을 도출하고자 정성적인 분석에 있어서 AHP기법을 통한 가능한 여러 대안들간의 상대적 중요도를 결정하는 방식으로 객관성을 확보하고자 하였다. 또한, 정량평가에 있어서는 경제적인 터널구조물 건설을 목적으로 설계단계에서 기존 LCC 기법에서 고려하지 못하는 건설공사에 따른 사회적 손실을 비용으로 환산하는 LCSC 평가기법을 제안하였다. 실제 지하철 ${\bigcirc}{\bigcirc}$공구에 적용사례를 통해 그 효용성을 검증하였으며, 검토결과 해당 공구에서는 정성평가 및 정량평가 항목 모두에서 개착공법 보다는 터널공법의 채택이 합리적인 대안으로 평가되었다.

Keywords