Analysis of Performance and Economical Efficiency through Cycle Simulation for Power Saving BIP(Block Ice Plant)

절전형 제빙시설 사이클 모사를 통한 성능 및 경제성 해석

  • 강종호 (인하대학교 기계공학과 대학원) ;
  • 김남진 (인하대학교 기계공학과 대학원) ;
  • 이재용 (인하대학교 기계공학과 대학원) ;
  • 김종보 (인하대학교 기계공학과)
  • Published : 2001.06.01

Abstract

Domestic ice making companies make effort to obtain products and neglect to introduce low cost product improvements with energy savings. The work presented here is an implementation of ice making method to improve both energy efficiency and productivity. In this present investigation, several ice making cycles are proposed for higher efficiency in the system. COP(Coefficient of Performance), ice making time and electric energy consumption are evaluated and compared with the conventional system. Results shows that COP is improved with more efficient use of time for ice making and electric consumption. Therefore, this can offer an opportunity for more efficient use of energy and higher productivity in ice making.

Keywords

References

  1. Journal of Refrigeration engineering and Air Conditioning v.16 no.2 Korean Association of Refrigeration
  2. Proceeding of the KSME 2000 Fall Annual Meeting B Cycle Simulations for Power Saving BIP design
  3. Handbook of Air-Conditioning, Refrigeration and Sanitary Engineering v.3 no.2
  4. American Society of Heating, Refrigeration and Air-Conditioning Engineers Thermophysical Properties of Refrigerants
  5. Refrigeration & Air conditioning(2nd ed.) Stoecker;Jones