초록
With the increase use of electromagnrtic distance measuring equiment, is is required that we need to study the higher dimensional applications and detail technical methods. The purpose of this paper is to improve the accuracy of ocean construction surveying and computer programming for determining of horizontal position of a quadrilateral by measuring line on traverse surveyng, trigulation and trilateration. Aa long distance measurements with high accuracy became possible by the apperance of EDM distance measuring instruments, we induced correct adjustment equation through angle condition and area conditionequation. After that we compared and experimental model. From its a result of the practical applicationto quadrilateral, it has been found that its triangulation and traverse surveying algorithms provide better accuracy than trilateration.