Improving the Ripple-Effect Metrics of Post-Construction Evaluation

건설공사 사후평가 파급효과 지표 개선방안

  • 차용운 (한국건설기술연구원 건설정책연구소 건설공사 사후평가센터) ;
  • 정서영 (한국건설기술연구원 건설정책연구소 건설공사 사후평가센터)
  • Published : 2023.05.17

Abstract

The ripple effect is analyzed in the post-construction evaluation phase, but only the qualitative analysis and simple numerical fluctuations are analyzed, thus, no reliable ripple-effect analysis has been conducted. Therefore, in this study, a focus group interview was conducted with 10 experts to propose a plan to improve the ripple effect metrics. Consequently, by linking with the policy-effect metrics of the pre-feasibility study, it is expected that the utilization of the analysis results will be improved and objective and quantitative analysis will be possible.