Acknowledgement
본 논문은 국토교통부 기술혁신과 공사비산정기준 관리운영사업(과제번호: 20220032) 및 한국건설기술연구원의 주요사업(건설정책 및 건설관리 발전전략)의 지원으로 수행된 연구임을 밝히며 이에 감사를 드립니다.
Recently, the application of BIM has been continuously expanded according to various government policies, and the application performance is being analyzed in BIM projects such as roads and railways. In line with this trend, the government is making additional efforts to introduce full-scale design BIM. The BIM design in the public sector is directly related to the estimated price. However, looking at the current status of BIM introduction, there is no support system in place for calculating the estimated price. Therefore, this study intends to analyze the priority activity that is easy to develop BIM unit price among the construction standard unit Price of construction work. In this study, in order to derive the BIM-based priority activity, BIM application statements and application guidelines were analyzed. As a result of the analysis, cast-in-place concrete construction (civil engineering) and reinforced concrete construction (architecture) were deduced as suitable construction activities for the preferential application of BIM. Since the results presented in this study are a rough analysis, it is judged that additional detailed analysis is necessary for the future.
본 논문은 국토교통부 기술혁신과 공사비산정기준 관리운영사업(과제번호: 20220032) 및 한국건설기술연구원의 주요사업(건설정책 및 건설관리 발전전략)의 지원으로 수행된 연구임을 밝히며 이에 감사를 드립니다.