Simulation Modeling for Productivity Analysis of Concurrent Construction Method of External Insulation Finishing System in Apartment

공동주택용 외단열 적층시공 공법의 생산성 분석을 위한 시뮬레이션 모델 개발

  • 김민주 (고려대학교 건축사회환경공학과) ;
  • 김태훈 (고려대학교 건축사회환경공학과) ;
  • 임현수 (고려대학교 건축사회환경공학과) ;
  • 조훈희 (고려대학교 건축사회환경공학과) ;
  • 강경인 (고려대학교 건축사회환경공학과)
  • Published : 2015.11.14

Abstract

Traditional External Insulation Finishing System(EIFS) is applied to apartment construction by performing structural framework and insulation finishing work sequentially. Separate execution of the three works increases construction cost and duration. Concurrent construction method of EIFS, which performs framework and insulation finishing work simultaneously, is introduced in order to solve these problems. However, the introduced method is exposed to the risk of construction delay caused by bottlenecks due to interacting processes and resources. Therefore, this paper presents a simulation model suitable for estimating work productivity of the concurrent construction by considering predecessor and successor processes to optimize resource allocation and minimize construction delay.

Keywords