Proceedings of the Korean Institute of Building Construction Conference (한국건축시공학회:학술대회논문집)
- 2015.11a
- /
- Pages.66-67
- /
- 2015
A Comparative Analysis on the Work Importance of Customized and Expansion Remodeling Project
맞춤형 및 증축형 리모델링 공사의 업무중요도 비교·분석
- Published : 2015.11.14
Abstract
This study compared and analyzed the job importance that site managers perceived by dividing the study scope into customized and expansion remodeling projects and deriving the job descriptions from previous studies. As a result, a total of 7 construction stages and 53 job descriptions were derived. As job importance in customized remodeling projects, removal and demolition works were the most important, followed by preliminary survey, and repair and reinforcement works. In addition, as job importance in expansion remodeling projects, preliminary survey is the most important, followed by civil engineering work, and repair and reinforcement works. It is considered that the job importance of the remodeling projects derived in this study will contribute to improving their job efficiency in the future.
Keywords