The Conceptual Framework of Concurrent Construction Method for EIFS in Apartment (공동주택용 외단열 적층시공 공법 개념모델 개발)

  • Lim, Hyunsu;Kim, Taehoon;Cho, Hunhee;Kang, Kyung-In
    • Journal of the Korea Institute of Building Construction
    • /
    • v.15 no.4
    • /
    • pp.413-423
    • /
    • 2015
  • Exterior Insulation and Finishing System(EIFS) is recognized as a promising alternative for energy reduction as energy reduction ratio of apartment is to be increased from 40% to 60% in 2017. However, EIFS is not actively applied to apartment because additional construction costs and duration are required for the current existing construction method of EIFS. Therefore, this study proposes a conceptual framework for concurrent construction method of EIFS which can reduce construction costs and duration by working sequentially from frame work to exterior insulation finishing work, and then verify the method's feasibility by analyzing a case study. It has been proven from the analysis that concurrent construction method of EIFS reduces 6.7% of construction duration and 13% of construction costs compared with the conventional exiting method. The proposed method is expected to contribute to invigorated application of EIFS to apartment.

Simulation Modeling for Productivity Analysis of Concurrent Construction Method of External Insulation Finishing System in Apartment (공동주택용 외단열 적층시공 공법의 생산성 분석을 위한 시뮬레이션 모델 개발)

  • Kim, Min Ju;Kim, Taehoon;Lim, Hyunsu;Cho, Hunhee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.11a
    • /
    • pp.68-69
    • /
    • 2015
  • Traditional External Insulation Finishing System(EIFS) is applied to apartment construction by performing structural framework and insulation finishing work sequentially. Separate execution of the three works increases construction cost and duration. Concurrent construction method of EIFS, which performs framework and insulation finishing work simultaneously, is introduced in order to solve these problems. However, the introduced method is exposed to the risk of construction delay caused by bottlenecks due to interacting processes and resources. Therefore, this paper presents a simulation model suitable for estimating work productivity of the concurrent construction by considering predecessor and successor processes to optimize resource allocation and minimize construction delay.

  • PDF

A Preliminary Study to Develop the Construction Method for Working Exterior Simultaneously with Vertical Structural Work (공동주택용 외단열 적층시공 공법 개발을 위한 기초연구)

  • Cui, Jun-Long;Kim, Taehoon;Lim, Hyunsu;Cho, Hunhee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.11a
    • /
    • pp.73-74
    • /
    • 2014
  • A construction method allowing exterior insulation working to be carried out simultaneously with vertical structural work through modification of the temporary vertical system form could be a breakthrough to invigorate exterior insulation construction in high-rise apartments. Therefore, the purpose of this study, as a preliminary study for developing such a method, was to derive significant engineering characteristics (E.C) using QFD which can reflect the users' need for E.C. Based on this result, a construction method will be developed in further research.

  • PDF