Proceedings of the Korean Institute of Building Construction Conference (한국건축시공학회:학술대회논문집)
- 2014.05a
- /
- Pages.72-73
- /
- 2014
The Study on Integrated ACS and Lift Car System for Early Beginning of Windows Work in Tall Building Construction
초고층 창호공사 조기착공을 위한 ACS-Lift Car 연계 시스템 기초연구
- Published : 2014.05.29
Abstract
Recently the concurrent construction method of framework and windows work has been applied for early beginning of exterior finishing works in tall building construction. However, the conventional method makes difficulties in auto-climbing of gang-form and climbing work of lift car since the removal of ACS(auto climbing system) should be preceded for operation of lift car up to the top floor. This study propose a concept model of integrated ACS and lift car system to resolve these problems and begin windows works early in tall building construction.