• Title/Summary/Keyword: ACS(Auto Climbing System)

Search Result 6, Processing Time 0.021 seconds

The Study on Integrated ACS and Lift Car System for Early Beginning of Windows Work in Tall Building Construction (초고층 창호공사 조기착공을 위한 ACS-Lift Car 연계 시스템 기초연구)

  • Lee, Dongyoon;Lim, Hyunsu;Cho, Hunhee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.05a
    • /
    • pp.72-73
    • /
    • 2014
  • Recently the concurrent construction method of framework and windows work has been applied for early beginning of exterior finishing works in tall building construction. However, the conventional method makes difficulties in auto-climbing of gang-form and climbing work of lift car since the removal of ACS(auto climbing system) should be preceded for operation of lift car up to the top floor. This study propose a concept model of integrated ACS and lift car system to resolve these problems and begin windows works early in tall building construction.

  • PDF

Development of Corner-Supported Auto Climbing Formwork System (강합성코어벽을 활용한 코너지지형 거푸집시스템 개발)

  • Hong, Geon-ho;Shim, Woo-Kyung
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.35 no.7
    • /
    • pp.171-178
    • /
    • 2019
  • Auto Climbing Formwork System (ACS) for construction of high-rise building is a construction method for automatically lifting the formwork system supported by the anchor on the pre-constructed concrete wall. It has excellent construction speed and quality, but it has the possibility of structural failure depending on the quality of concrete and also has low economical efficiency due to the use of foreign technology. In order to overcome these problems, this study conducted an optimum design for the development of a new concept of Corner Supported Auto Climbing System (CS-ACS) in conjunction with the development of corner steel-reinforced concrete core wall system. For the design the formwork system, the basic module and structural member compositions were planned, and the structural analysis program was used to analyze the optimum member's cross section and spacing. As a result, the horizontal displacement and the stress of the horizontal members were influenced by the spacing more than the cross-section of the member. On the other hand, vertical members did not affect the displacement and stress of the formwork system. The form tie was very effective in controlling the displacement when adjusting the spacing of the horizontal members, but when the spacing of the form tie is more than 1,500mm, it is analyzed that form tie is yielding in basic module. When the span of the formwork system is more than 30m, it is analyzed that the basic module needs to be changed because of the increase of overall displacement.

Development of Automated Gangform Climbing System for Apartment Housing (공동주택 전용 갱폼 자동 인양 시스템 개발)

  • Lee, Jeong-Ho;Kim, Soon-Young
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.11a
    • /
    • pp.114-115
    • /
    • 2019
  • Gangform is used as exterior wall forms in the most of apartments. Existing system forms developed for high-rise building, RCS and ACS, are too heavy and over-designed to be applied to general apartments, leading to higher costs. A more simplified rail Gangform(R/GF) is also used, but it depends entirely on T/C for the lift like Gangform. The T/C's legal inactivity time for moving Gangform and materials has increased, and the higher allowances have to be paid for overtime work, thus causing to the cost increase and time delay. Therefore, this study aims to develop an automated Gangform climbing system that can be used universally and economically in apartment houses. The use of the development system is expected to improve the safety of Gangform operations and reduce the workload on T/C.

  • PDF

A Study on the Development of Automated Gangform Climbing System for Apartment Housing Construction (공동주택 전용 갱폼 인양 자동화 기술 개발에 관한 연구)

  • Yang, Sang-Hoon;Cho, Jae-Yong;Cho, Ji-Won;Lee, Jeong-Ho;Kim, Young-Suk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.1
    • /
    • pp.53-66
    • /
    • 2012
  • Gangform compared with conventional wood and steel form is systemized form which has a capability to install and dismantle form at a time without repeating to assembly and disassembly small members. Gangform compared with ACS has some problems such as 1) Tower Crane load increase, 2) increase in safety incidence during climbing Gangform, 3) decrease in detachment operation productivity, 4) stop work due to climate impacts, and 5) decrease in labor cost, productivity, quality. A conceptual design model of automated Gangform climbing system is suggested for apartment housing construction to show its technical/economic feasibility and workers' safety while increasing operation productivity and concrete quality.

Comparative Study of Strength and Weakness of System Form in High-rise Building Project (초고층빌딩 거푸집 공사의 장단점 비교에 관한 연구)

  • Park, Byung-Joo;You, Seong-Kue;Kim, Ju-Hyung;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.9-10
    • /
    • 2012
  • According to the recent trends in the construction business have been actively booming both overseas plant orders and high-rise buildings orders. In addition high-rise building projects have being promoted or is actually under construction in Korea. Frame structure review which is the most consuming period on high-rise building is essential on that project. In this study looks for the currently form system and compares to those large system used in high-rise buildings.

  • PDF

Structural Work Duration Estimation and Analysis of Tower-Type Residential Construction Project

  • Yun, Seok Heon;Kim, Sang Chul
    • Architectural research
    • /
    • v.14 no.3
    • /
    • pp.109-116
    • /
    • 2012
  • In order to shorten construction duration in high-rise project, construction company tried to make various system method toward simplifying construction method and shortening construction duration. Though high-rise tower-type residential project are growing, there are few case study. Then, the data for preliminary schedule planning in high-rise tower-type residential project are rare. This purpose of research shows construction method in structural work in high-rise tower-type residential project, suggests schedule planning in structural work through case studies. The structural work in high-rise tower-type residential project was divided 1) completion of form in lower part and 2) the typical floor under penthouse. The statistical analysis were done in two parts, the data from analysis were used in simulation. Finally, researcher confirmed the difference between real construction duration and the figure from simulation. The results shows that the more construction duration is long, the less ACS's cost is low. It means the effectiveness is increasing in ACS, if the floor number is high.