Process of Cost Estimation in Feasibility Analysis Considering ratio of Renewable Portfolio Standard

신·재생에너지 공급의무화제도(RPS) 비율을 고려한 타당성 분석의 공사비 산정 프로세스

  • 양현주 (서울시립대학교 대학원 건축공학과) ;
  • 김종협 (서울시립대학교 대학원 건축공학과) ;
  • 한상원 (서울시립대학교 건축학부) ;
  • 현창택 (서울시립대학교 건축학부)
  • Published : 2014.05.29

Abstract

Recently the Korean government also has strictly restricted a law such as GBCC(Green Building Certification Criteria)and RPS(Renewable Portfolio Standard) on the construction. Especially the government announced a obligation of renewable energy consumption over 12% for all the public buildings of total area over 1,000㎡ since 2014. Regarding to the policy, this study presented the economics of energy analysis of the public office buildings that supplies 12% renewable energy output in the early stage of construction project. This paper calculated on CO2 emission by the geothermal, solar heat, and solar photovoltaic system and estimated the saving cost. Reduced cost through the energy saving are predicted to influence on the total construction cost. As a result air pollution and energy saving cost are expected that renewable energy system would be saving total initial cost of construction on planning phase.

Keywords