A SCHEDULING TECHNIQUE FOR MULTIPLE RESOURCE ALLOCATION TO MULTIPLE PROJECTS IN CONSTRUCTION

  • 발행 : 2011.02.16

초록

Today's highly competitive construction scenario forces all the major players in the field to take up multiple projects which have put an undue pressure on the resources available within the organization. Under such a situation, there are many instances where in the resource requirement exceeds its availability due to multiple activities (with same resource requirement) which are scheduled to start simultaneously and thus results in the constrained resource becoming a bottleneck of the project. As a consequence of sharing resources, this paper studies the impact on the completion date of two similar projects under two different conditions, the first one resulting in a postponed end date and the second without any postponement. The resource utilization, the possibility of substitution of a resource and its subsequent impact on the deadline of the project is analyzed under these two circumstances. The study is done on a Critical Chain Project Management (CCPM) platform instead of leaving the schedule with a traditional Critical Path Method (CPM) finish, which gives an added advantage of validating the robustness of the emerging CCPM trend in the field of resource management.

키워드