• Title/Summary/Keyword: RACP

Search Result 3, Processing Time 0.018 seconds

A Router Auto-Configuration Protocol(RACP) for IPv6 Networks (IPv6 네트워크를 위한 라우터 자동 설정 프로토콜)

  • Lee Wan-Jik;Heo Seok-Yeol
    • Journal of Korea Society of Industrial Information Systems
    • /
    • v.11 no.3
    • /
    • pp.47-58
    • /
    • 2006
  • Address Auto-configuration capability is one of important advantages of IPv6 protocol This function enables the IPv6 hosts to configure IPv6 networks automatically, while IPv6 routers still have to be configured manually. To solve this problem, we propose RACP(Router Auto-Configuration Protocol), a new address auto-configuration protocol which configures all routers of a small network consisting of several routers and sub-networks automatically. The RACP protocol can automatically create and deliver IPv6 prefixes and routing informations of all routers on the network by using the network's prefix assigned by ISP. The proposed RACP can be used to set up network automatically for a small IPv6 site such as a small office network, a home network without the assistance of network administrator.

  • PDF

A Router Auto-Configuration Protocol(RACP) for IPv6 Networks (IPv6 네트워크을 위한 라우터 자동 설정 프로토콜)

  • Lee Wan-Jik;Heo Seok-Yeol
    • Proceedings of the Korea Society for Industrial Systems Conference
    • /
    • 2006.05a
    • /
    • pp.127-136
    • /
    • 2006
  • 풍부한 주소 공간 이외 IPv6 프로토콜이 가지는 주요한 장점 중의 하나는 호스트들의 주소 자동설정 기능이다. 하지만 IPv6 호스트들의 주소 자동설정 기능에 비해 IPv6 라우터는 수동 설정이 필요하기 때문에 IPv6 네트워크는 여전히 수동으로 설정되어야 한다. 이러한 문제를 해결하기 위해 본 논문에서는 여러 개의 라우터와 LAN들로 구성되는 소규모 IPv6 네트워크 상의 모든 라우터들을 자동 설정할 수 있는 새로운 프로토콜을 제안한다. 제안된 라우터 자동설정 프로토콜은 네트워크의 모든 라우터들을 논리적인 계층 구조로 구성하고, ISP에서 할당된 IPv6 네트워크 프리픽스를 사용하여 내부 라우터들의 모든 프리픽스와 라우팅 정보를 자동 생성하고 전달할 수 있는 기능을 가진다. 본 논문에서 제안된 라우터 자동 설정 기능은 특히 홈 네트워크이나 여러 개의 LAN들로 구성되는 소규모 사무실 등의 전문 네트워크 관리자를 두기 힘든 환경에서 네트워크의 자동 설정을 위해 많이 활용되리라 기대된다.

  • PDF

A SCHEDULING TECHNIQUE FOR MULTIPLE RESOURCE ALLOCATION TO MULTIPLE PROJECTS IN CONSTRUCTION

  • K Ananthanarayanan;Murali Jagannathan
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.201-208
    • /
    • 2011
  • Today's highly competitive construction scenario forces all the major players in the field to take up multiple projects which have put an undue pressure on the resources available within the organization. Under such a situation, there are many instances where in the resource requirement exceeds its availability due to multiple activities (with same resource requirement) which are scheduled to start simultaneously and thus results in the constrained resource becoming a bottleneck of the project. As a consequence of sharing resources, this paper studies the impact on the completion date of two similar projects under two different conditions, the first one resulting in a postponed end date and the second without any postponement. The resource utilization, the possibility of substitution of a resource and its subsequent impact on the deadline of the project is analyzed under these two circumstances. The study is done on a Critical Chain Project Management (CCPM) platform instead of leaving the schedule with a traditional Critical Path Method (CPM) finish, which gives an added advantage of validating the robustness of the emerging CCPM trend in the field of resource management.

  • PDF