Special Issue of the Society of Naval Architects of Korea (대한조선학회 특별논문집)
- 2005.06a
- /
- Pages.159-164
- /
- 2005
A Case Study for Development of the Block Arrangement on Fixed Area and Scheduling System
고정 정반에서의 블록 배치 및 일정계획 시스템 개발 사례연구
- Min Sang-Gyu (Automation Research Department Industrial Research Institute R & D Division HYUNDAI heavy industries co. ltd.) ;
- Lee Sang-Hyup (Automation Research Department Industrial Research Institute R & D Division HYUNDAI heavy industries co. ltd.) ;
- Kim Ji-On (Automation Research Department Industrial Research Institute R & D Division HYUNDAI heavy industries co. ltd.) ;
- Ha Seung-Jin (Automation Research Department Industrial Research Institute R & D Division HYUNDAI heavy industries co. ltd.) ;
- Choi Tae-Hoon (Automation Research Department Industrial Research Institute R & D Division HYUNDAI heavy industries co. ltd.)
- 민상규 (현대중공업 산업기술연구소 자동화연구실) ;
- 이상협 (현대중공업 산업기술연구소 자동화연구실) ;
- 김지온 (현대중공업 산업기술연구소 자동화연구실) ;
- 하승진 (현대중공업 산업기술연구소 자동화연구실) ;
- 최태훈 (현대중공업 산업기술연구소 자동화연구실)
- Published : 2005.06.01
Abstract
In this paper, we study some problems of the scheduling on the fixed area in a shipbuilding. The scheduling, constrainted a working area, is not easy to make a load balance and to operate a change of daily work plan. we proposed a block arrangement algorithm to make the load balance and developed a system used to operate the change of daily work plan.