A Case Study for Development of the Block Arrangement on Fixed Area and Scheduling System

고정 정반에서의 블록 배치 및 일정계획 시스템 개발 사례연구

  • Min Sang-Gyu (Automation Research Department Industrial Research Institute R & D Division HYUNDAI heavy industries co. ltd.) ;
  • Lee Sang-Hyup (Automation Research Department Industrial Research Institute R & D Division HYUNDAI heavy industries co. ltd.) ;
  • Kim Ji-On (Automation Research Department Industrial Research Institute R & D Division HYUNDAI heavy industries co. ltd.) ;
  • Ha Seung-Jin (Automation Research Department Industrial Research Institute R & D Division HYUNDAI heavy industries co. ltd.) ;
  • Choi Tae-Hoon (Automation Research Department Industrial Research Institute R & D Division HYUNDAI heavy industries co. ltd.)
  • 민상규 (현대중공업 산업기술연구소 자동화연구실) ;
  • 이상협 (현대중공업 산업기술연구소 자동화연구실) ;
  • 김지온 (현대중공업 산업기술연구소 자동화연구실) ;
  • 하승진 (현대중공업 산업기술연구소 자동화연구실) ;
  • 최태훈 (현대중공업 산업기술연구소 자동화연구실)
  • Published : 2005.06.01

Abstract

In this paper, we study some problems of the scheduling on the fixed area in a shipbuilding. The scheduling, constrainted a working area, is not easy to make a load balance and to operate a change of daily work plan. we proposed a block arrangement algorithm to make the load balance and developed a system used to operate the change of daily work plan.

Keywords