Cycle Simulations for Power Saving BIP(block ice plant) design

절전형 제빙시설 설계를 위한 사이클 모사

  • 강종호 (인하대학교 기계공학과 대학원) ;
  • 김남진 (인하대학교 기계공학과 대학원) ;
  • 이재용 (인하대학교 기계공학과 대학원) ;
  • 김종보 (인하대학교 기계공학과)
  • Published : 2000.11.02

Abstract

Most Ice making companies make simple efforts to make products and fail to introduce improvements into the system against huh cost of products. The work presented here is an implementation of ice making method to improve both energy efficiency and productivity. In this present investigation, several ice making cycles are designed and calculated to evaluate COP, ice making time and electric energy consumption. Results obtained shows that COP is improved with more efficient use of time for ice making and electric consumption. Therefore this can offer the opportunity for more efficient energy consumption and productivity in ice making.

Keywords