This paper presents a case study using Building Information Modeling (BIM) for planning, simulating, and implementing complex site logistics in a headquarter office building construction project in Silver Spring, MD. As part of the project a prefabricated 92ft structural tube steel pedestrian connector bridge was installed between two adjacent buildings in the city of Silver Spring, MD. There were multiple significant challenges to deliver, offload, prepare, and install the connector bridge safely, on time, and with the minimum disturbances to the neighbors. BIM was of the foremost importance to visualize, simulate, analyze, improve, and communicate the site logistics plan from delivery to installation of the connector bridge. As a result of the effort, GC of the project was able to prepare a highly detailed plan, communicate it effectively to all stakeholders, and flawlessly execute the work as planned. This case study would provide a useful reference for contractors who are seeking a better planning method that enables generation of more accurate, implementable, optimized plans for complex site logistics.
During last five years several workshops and seminars among social work educators, in and out country, has taken place. In those gatherings there has been, criticism on American model on which curriculum of social work in Korea has mainly based, and many proposals which most developing countries should consider and adopt for developing their own curriculums. The proposals could be summarized as follows; 1. Specification of developmental functions of social work should be made so that the curriculum could involve. It also must come from own societal needs and own national development task. 2. Social work should participate and make contribution to plan and solve the main social problems in own countries. 3. Clarification of educational objective in undergraduate level should be made and one of them must be related to the first professional degree. 4. There should be the courses which provide the content of macro level participation. How much of the proposals are reflected in the current curriculum of Korea? What are the problems Korean social work education has been faced in connection with reflecting the proposals? What kinds of task we should or could perform in order to adopt the proposals? These are the questions which deserved to be studied. The followings are the answers to the questions; 1. The new courses such as social welfare policy and planning, Social Development, Population Dynamics and Family Planning, Social problems, Special Issues in Social Welfare, etc, are placed in the curriculum. 2. Though the new courses are added the courses of case work, group work, and community organization are strongly remained it means that integrative method is not quite adopted and that conflicts are taking place between new and old fashion. 3. Fieldwork placement policy has been changes from concurrent to block and from social work method oriented to social problem oriented. 4. There are lack of integration among the all courses, of consistency between pre and post courses and connection among the related courses. 5. Establishment of image of social worker with B, A. degree should be urgently taken place. It can't be done by social work field alone but by cooperation with all the forces related to the social work practice. 6. B. A. graduate should have a common base of knowledge and competence. It could be come from the clear and specified objectives of undergraduate level education. And agreement among the member schools on the objectives can call on the fundamental similarities in each curriculums. Different programs from one school to another can be tolerated as long as there are fundamental similarities among the schools. Basic concepts and framework of social work should be kept clearly. It is a slow and long process to make social work recognized as a profession in the developing countries. Korea can't be and exception. Failure of having social work be indegenous can't be the reason to refuse an change the basic concepts of social work. One of he most important task which social work education in Korea must achieve in the near future is to establish the minimum requirement courses in the curriculum. Social work field, on the other hand, must find the positions for the social works in the various settings and institute. Clear role and image of social worker can be obtained by doing that.
Over the past decade, the topic of work breakdown structure (WBS) has gained an increasing amount of attention from information technology Professionals as an effective tool for managing the complexity of a large-scale information system development project. It is a method for planning and controlling a large-scale information system development. A WBS provides the basis for project organization, cost estimation, task scheduling, and contract management. Based on the authors' practical experience, this paper discusses how to establish a specific WBS and some considerations for developing a well-defined WBS. The model of WBS suggested in this study will provide useful insight and guidelines for establishing the spec-ific WBS for a large-scale information systems development.
Journal of Korean Society of Industrial and Systems Engineering
/
v.19
no.40
/
pp.203-217
/
1996
This thesis describes a quantitative decision-making of production planning system. A mathmatical model of Linear Programming is used set up a production scheuling under the assumption. As the emphasis is laid on the applicability of the developed model, the linrar programming is applied to establish the production schedule for "F" furniture company which produces kitchin cabinet and OA furniture, The optimal solution is obtained by using the LP package, QBS. By the solution reduced to 14% of work force compared with the real data during all of the planning horizon. And it is also possible to reduce the work-force of the lowest level of employee by 10% for the reasonable management. There are some limitations in computerized data processing, which is only considering the economic costs without considering any external environment of case enterprise. As a result, it is shown that the LP model is very useful method of make aggregate production schedule. schedule.
Journal of the Korean Institute of Educational Facilities
/
v.18
no.1
/
pp.3-10
/
2011
Recently, an active relation between the University and city has become an issue of increasing importance in the field of campus planning. Campus master plan is known as long range development plan, and is not simply an abstract drawing work but definite scaling work procedure. The purpose of this paper is to examine the planning process and relation between university and the region through master plan of master plan of D University and K University which located in Seoul city. From the research which sees master plan of D universities which are presented in existing an instance and K universities master plan did the service blueprint with base and investigated. And both university currently analyzed the situation which is being placed and grasps a problem point, presented that alternative with what kind of method.
Journal of the Korean Institute of Rural Architecture
/
v.21
no.4
/
pp.61-68
/
2019
This research aimed to propose an organizational system that implements a planning agreement in local small and medium sized city, Korea. To conduct this research, three successful cases were deduced using integration systems to investigate purpose and background of the planning agreement. Articles, reports, media, and participation in meetings and workshops related on this topic are used for collecting data and interview of regional activists and experts, and public officials were carried out. Among them, the case of Yeongju city that used the new integration system instead of pre-adminstration system was examined in detail. There are three local governments; Yeongwol-gun, Jeungpyeong-gun, and Yeongju city which have successfully fulfilled projects from various departments of central adminstration not projects of planning agreement. The similarity noticed between those three cases is to continue various projects from several departments of central adminstration for numerous years and contribute to regional revitalization. A successful factor was to establish organizational system and manage it for the integration plan and performance for appropriate regional and administrative characteristics. In particular, in the case of Yeongju city, organization for urban architectural management composed of civilian experts were formed, authorized status on administrative organization was established, and the function and role were identified. It is helpful to other local governments to carry out the projects of planning agreement as the case of Yeongju city is now a new method.
Korean Journal of Construction Engineering and Management
/
v.5
no.2
s.18
/
pp.194-201
/
2004
Core-wall construction method is applied in many high-rise building constructions. This is caused by the advantages of the method such as the effect of saved construction cost and shortened period. However, the analysis study of planning practice for core-wall construction shows matters take place during core-wall construction, such as increasing in construction cost and period. These matters result from the limited work space leading to low productivity, the activity interference leading to increasing in period, additional temporary work cost and time, and delayed concrete pour activity. A large part of these can be prevented taking place by very detailed and most careful core-wall construction plan. Therefore, this study suggests improvement directions of core-wall construction planning process focused on the cooperation system of a contractor between a sub-contractor and the process.
Journal of Korean Society of Industrial and Systems Engineering
/
v.42
no.1
/
pp.115-128
/
2019
Small and Medium-sized Enterprises (SMEs) are being faced with rapid changes in their business environments due to evolution of technologies and innovation in societal eco-systems. Particularly, dynamic interactions between such environments and enterprise activities have become significant, so technology planning, which is a process of identifying appropriate directions regarding product and technology development, has received much attention to cope with such dynamics proactively. However, SMEs typically have limits in performing independent, strategical and systematical technology planning activities due to the lack of human, material and financial resources. This paper proposes the development of a product roadmapping method so that SMEs carry out efficient technology planning activities with interconnections of external business environments. The present work provides product roadmap templates that directly accommodate the influence of business environments on the product's system and its associated super/sub-systems with the use of external environment analysis techniques including TRIZ methodology, PEST and 5Forces analysis. These templates are useful to efficiently forecast the directions of product's development and evolution, which arise from changes in external environments. Consequently, the present work enables SMEs to flexibly cope with the era of the next R&D generation, which pursues value creation through mutual interconnection between business environments and technology development.
In this paper we applied dynamic programming to determining work schedule type. In dynamic programming formulation, each day during a planning horizon represents a stage for which a decision is made. The alternatives are given by work schedule types that combine regular time, overtime, additional shift, and so on. In this case, their associated return function is labor cost. The state is defined as the amount of work time allocated to stage 1, stage 2,…, and current stage. A case study for a real manufacturing company was performed to apply dynamic programming to scheduling daily work hours during a week. The case study showed that total cost of our solution derived from dynamic programming decreased by about 6% as compared with the solution obtained from the previous method.
Mohammed E. Shaawat;Abdullah Binomar;Abdulaziz S. Almohassen;Khalid Saqer. Alotaibi;Mahmoud Sodangi;Ahmad Aftab
Structural Monitoring and Maintenance
/
v.10
no.1
/
pp.25-42
/
2023
Despite the significance of ports as critical economic infrastructure, the berth facilities usually deteriorate due to heavy loading, unloading, aging, environmental weather conditions, marine growths, and lack of efficient maintenance management. Marine berths require proactive maintenance management to limit deterioration and defects as no berth facility is maintenance-free. Thus, delay in carrying out maintenance work for the marine berths can be devastating to the operational process involving ship entry, loading, and unloading operations. The aim of this research is to coordinate both operations work, and maintenance works that take place inside the berth of a local industrial port in Saudi Arabia, by developing a novel framework that integrates both works without affecting the efficiency and functionality of the berth. The study focused on defining the operational process of the port and identifying the elements with direct and indirect effects. In addition to determining the priority for the entry of ships inside the berth, it also identified the factors involved in designing a framework that included maintenance work as a component of the monthly berth occupancy schedule. By applying a mathematical model, a framework was established, which includes all the important elements of the process. As a result of the mathematical method formulation process, a database was designed that organizes and coordinates the operations of all berths within the port. This creates time to carry out the required maintenance work monthly as well as ease of coordination with the contractors responsible for the implementation of those works.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.