• Title/Summary/Keyword: work sequence

Search Result 651, Processing Time 0.03 seconds

The Power Analysis of Smart Work Industry and Increase Plan (스마트워크 산업 경쟁력 분석 및 육성방안)

  • Yu, Seung-Yeob;Noh, Kyoo-Sung
    • Journal of Digital Convergence
    • /
    • v.9 no.6
    • /
    • pp.187-196
    • /
    • 2011
  • This study found the power analysis and increase plan of Smart work industry out. We did the internet survey with 117 experts of Smart work and analyzed International competitive power and Smart work marketability. The results was as follows: First, Experts recognized the growth about Cloud computing industry so that they were most high. Second, The thing which the earning of Smart work industry is high appeared a Security industry, Cloud computing industry, and Mobile office industry etc sequence. Third, The Smart work industry which an international technique power level is high appeared in a Smart e-learning industry, Mobile office industry, and Security industry etc sequence. Lastly, An Smart work industry which the concentration supports in the government dimension Security industry, Cloud computing industry, Smart work user SW industry, and Smart e-learning industry etc sequence. This research products will use for there even though it prepares a concentration support industry in the government dimension an activation policy.

A Study on Determining Job Sequence by Sampling Method (II) (샘플링 기법에 의한 작업순서의 결정 (II))

  • 강성수;노인규
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.12 no.19
    • /
    • pp.25-30
    • /
    • 1989
  • This study is concerned with a job sequencing method using the concept of sampling technique. This sampling technique has never been applied to develop the scheduling algorithms. The most job sequencing algorithms have been developed to determine the best or good solution under the special conditions. Thus, it is not only very difficult, but also taken too much time to develop the appropriate job schedules that satisfy the complex work conditions. The application areas of these algorithms are also very narrow. Under these circumstances it is very desirable to develop a simple job sequencing method which can produce the good solution with the short tine period under any complex work conditions. It is called a sampling job sequencing method in this study. This study is to examine the selection of the good job sequence of 1%-5% upper group by the sampling method. The result shows that there is the set of 0.5%-5% job sequence group which has to same amount of performance measure with the optimal job sequence in the case of experiment of 2/n/F/F max. This indicates that the sampling job sequencing method is a useful job sequencing method to find the optimal or good job sequence with a little effort and time consuming. The results of ANOVA show that the two factors, number of jobs and the range of processing time are the significant factors for determining the job sequence at $\alpha$=0.01. This study is extended to 3 machines to machines job shop problems further.

  • PDF

A Scheduling Strategy for Reducing Set-up Time and Work-In-Process in PCB Assembly Line (PCB조립 라인의 준비 시간 단축 및 재공품 감소를 위한 스케줄링 전략)

  • 이영해;김덕한;전성진
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.22 no.1
    • /
    • pp.25-49
    • /
    • 1997
  • Printed circuit board (PCB) assembly line configuration is characterized by very long set-up times and high work in process (WIP) inventory level. The scheduling method can significantly reduce the set-up times and WIP inventory level. Greedy sequence dependent scheduling (GSDS) method is proposed based on the current methods. The proposed method is compared with the current method in terms of three performance measures: line throughput, average WIP inventory level, and implementation complexity.

  • PDF

Enhanced Augmented Reality with Realistic Shadows of Graphic Generated Objects (비디오 영상에 가상물체의 그림자 삽입을 통한 향상된 AR 구현)

  • 김태원;홍기상
    • Proceedings of the IEEK Conference
    • /
    • 2000.09a
    • /
    • pp.619-622
    • /
    • 2000
  • In this paper, we propose a method for generating graphic objects having realistic shadows inserted into video sequence for the enhanced augmented reality. Our purpose is to extend the work of [1], which is applicable to the case of a static camera, to video sequence. However, in case of video, there are a few challenging problems, including the camera calibration problem over video sequence, false shadows occurring when the video camera moves and so on. We solve these problems using the convenient calibration technique of [2] and the information from video sequence . We present the experimental results on real video sequences.

  • PDF

A study on sequencing of Mixed Model Assembly Line for increasing productivity (혼합모델조립라인의 생산성 제고를 위한 작업순서 결정)

  • 최종열
    • Korean Management Science Review
    • /
    • v.13 no.2
    • /
    • pp.25-48
    • /
    • 1996
  • Mixed Model Assembly Lines (MMALs) are increasingly used to produce differentiated products on a single assembly line without work-in-process storage, Usually, a typical MMAL consists of a number of (1) stations doing exactly the same operation on every job, (2) stations involving operations with different choices, and (3) stations offering operations that are not performed on every job, or that are performed on every job but with many options. For stations of the first type there is no sequencing problem at all. However, for the second type a set-up cost is incurred each time the operation switches from one choice to another. At the third type of stations, different models, requring different amounts and choices of assembly work, creates an uneven flow of work along the line and variations in the work load at these stations. When a subsequence of jobs requires more work load than the station can handle, it is necessary to help the operations at the station or to complete the work elsewhere. Therefore, a schedule which minimize the sum of set-up cost and utility work cost is desired. So this study has developed Fixed Random Ordering Rule (FROR), Fixed Ascending Ordering Rule (FAOR), Fixed Descending Ordering Rule, and Extended NHR (ENHR). ENHR is to choose optimal color ordering of each batch with NHR, and to decide job sequence of the batch with it, too. As the result of experiments, ENHR was the best heuristic algorithm. NHR is a new heuristic rule in which only the minimum addition of violations from both partial sequence and unassigned sequence at every branch could be considered. And this is a heuristic sequencing rule for the third type of stations at MMAL. This study developed one more heuristic algorithm to test the performance of NHR, which is named as Practical Heuristic Rule (PHR).

  • PDF

A Study on the Textuality of Sijo Poetry (시조의 텍스트성(textuality) 연구)

  • Im Jong-Chan
    • Sijohaknonchong
    • /
    • v.21
    • /
    • pp.5-22
    • /
    • 2004
  • If Sijo poetry is referred to a text which is composed of sentences. its textuality can be explored in terms of 1) the figurative words used in each line. 2) the logical sequence between lines. 3) the syntactic composition of each line. With the ancient Sijo poem. 1) it is composed of logical sentences as a result of extremely restraining from using figurative words that could prevent the reader from grasping the logical sequence within the work; 2) there is a clear cohesion between lines that can make each work perfectly coherent; 3) each line has a balanced syntactic structure, so the entire structure of a Sijo poem is '6 phrases in lines'. With the modem Sijo peom. 1) it abounds in figurative words, which prevent the work from having a logical sequence, and sometimes even from having three lines; 2) there is a loose cohesion between lines which can't make each work coherent; 3) it sometimes destroys the syntactic structure, '6 phrases in 3 lines', unique to traditional Sijo poetry. I think that this trend of modern Sijo poetry can cause haphazard the existence of modern Sijo poetry.

  • PDF

Sequence Analysis in Women's Work Transition (여성취업이행 경로의 생애과정 씨퀀스(sequence) 분석)

  • 은기수;박수미
    • Korea journal of population studies
    • /
    • v.25 no.2
    • /
    • pp.107-138
    • /
    • 2002
  • In general, women's labor force participation follows a M-curve pattern because women's state of economic activity usually changes by their life course stage. This research attentions that the effect of sequence of life course as well as the effects of‘marriage bar’, or‘maternity leave’is very important in understanding women's chaning economic activity status. First, this research hypothesizes that women's four patterns of job career such as‘continuous pattern’,‘discontinuous pattern’,‘non-economic activity pattern’,‘marriage leave pattern’result a significant difference in social and demographic variables. Second, this research analyzes the effect of ordering and timing of life events on women's work transition. This research investigates labor market dynamics to conceptualize labor market behaviors using longitudinal data and sequence analysis and event history analysis. We find that four patterns of job career vary by age, educational attainment, having a certificate or not, their parents’human capital and health status. And we find that the ordering and timing of‘participation in labor market’and‘marriage’determine the pattern of women's work transition.

Estimation of Physical Layer Scrambling Code Sequence of DVB-S2

  • Wu, Hao;Xie, Hui;Huang, Zhi-Tao;Zhou, Yi-Yu
    • ETRI Journal
    • /
    • v.36 no.2
    • /
    • pp.329-332
    • /
    • 2014
  • In this letter, the problem of estimating the physical layer (PL) scrambling code sequence of DVB-S2 is studied. We present the first ever scheme to estimate the scrambling sequence. The scheme is based on hypothesis testing. By analyzing the PL scrambling process, we construct a new sequence equivalent to the scrambling sequence. We then use hypothesis testing to estimate the new sequence. The threshold for the hypothesis testing is also discussed. The experiment results show that the performance of our estimation scheme can work even under high BER.

Development of a Tying-Unit Controller for a Variable Chamber Round Baler (가변 원형 베일러의 결속 기구 제어 장치 개발)

  • 김종언;김경욱
    • Journal of Biosystems Engineering
    • /
    • v.25 no.5
    • /
    • pp.341-350
    • /
    • 2000
  • This study was conducted to develop a control unit for a tying device of a variable chamber round baler. The work process of the tying device was thoroughly analyzed and the control sequence was established according to the work process. Based on this control sequence, a control unit using an 8 bit microprocessor AT 89C52 as a CPU was developed. The driving circuit to control the actuator motion was developed and the PWM method was used to regulate the velocity of the actuator. On the front panel of the control unit, indicators were also installed to show the operations being conducted. A prototype of the developed control unit was manufactured and tested. A total of 50 complete cycles of the control sequence was repeated and no failure was observed. It was evaluated that the developed control unit has an excellent performance and can be used practically for variable chamber round balers.

  • PDF

Happy Work : A Software Architecture Design Environment (Happy Work : 소프트웨어 구조 설계 환경의 개발)

  • 강병도
    • Journal of Korea Society of Industrial Information Systems
    • /
    • v.5 no.3
    • /
    • pp.87-93
    • /
    • 2000
  • Recently Software Industry has tended to enhance the productivity and quality with using the software architecture in software development and administration. The research of software component technique and software development methodology are just doing and making many applications. The software architecture is considered as the essential element for analyzing and maintaining the entire structure with organizing the software into components and describing the relations with connectors. The software modeling methodology that we propose is generating Happy Work Language describing the software structure with the modeling tool as Happy Work. We can use System Context Diagram, Component Diagram, Component Sequence Diagram, and they are composed of four Elements as Users, Systems, Components, Connectors.

  • PDF